All amounts are in
“Our third quarter production was in line with quarterly guidance with a record performance from the
“We expect significant growth from the
Third Quarter 2026 Operational and Financial Highlights
- Produced 119,000 ounces of gold in the third quarter of 2026, meeting quarterly guidance. This included record production from the
Island Gold District , reflecting record underground mining rates and milling rates. This was offset by lower production fromYoung -Davidson driven by lower mining rates and grades, as previously guided. With production expected to increase in the fourth quarter, the Company is on track to achieve its full year production guidance which was revised in July Island Gold District continues to perform well, with underground mining rates increasing to average a record 1,790 tonnes per day ("tpd"). Magino milling rates also increased to a new quarterly record, averaging 10,313 tpd. The higher mining and milling rates drove record quarterly production of 68,700 ounces. The operation remains on track to achieve its full year production guidance, with a further increase in underground mining rates and higher grades expected to drive significant production growth in the fourth quarter- Third quarter gold sales totaled 118,361 ounces at an average realized price of
$4,258 per ounce, generating quarterly revenues of$510.4 million , including silver sales. This represented a 10% increase from the third quarter of 2025 - Cash flow from operating activities in the third quarter was
$216.3 million ($234.9 million before changes in working capital and taxes paid1, or$0.56 per share) - Generated strong ongoing free cash flow1 of
$75.6 million in the third quarter, while continuing to invest in high-return growth and a significant exploration program - Cost of sales was
$214.2 million , or$1,810 per ounce in the third quarter. As previously guided, all-in sustaining costs ("AISC"1) of$1,956 per ounce increased from the second quarter, driven by lower production atYoung -Davidson and higher sustaining capital at theIsland Gold District . Total cash costs1 of$1,375 per ounce were also up from the second quarter. The Company remains on track to achieve revised full year cost guidance with total cash costs and AISC expected to decrease in the fourth quarter - Reported net earnings were
$165.6 million for the third quarter, or$0.40 per share. Adjusted net earnings1 were$184.0 million , or$0.44 per share1. Adjusted net earnings include an after-tax adjustment for net loss on commodity hedge derivatives of$9.9 million , adjustments for net unrealized foreign exchange losses recorded within deferred taxes and foreign exchange gains totaling$7.1 million , and other adjustments of$1.4 million - Cash and cash equivalents totaled
$597.4 million atSeptember 30, 2026 , down slightly from the second quarter primarily reflecting the use of$86.2 million to eliminate the majority of remaining legacy gold hedges inherited fromArgonaut Gold ("Argonaut"). The Company remains well-positioned to internally fund all of its growth initiatives and increased shareholder returns with strong ongoing free cash flow - Subsequent to quarter end,
$160 million was received onOctober 9 , which represented the one-year anniversary payment for the sale of the Turkish projects completed in 2025. The final$150 million cash payment is scheduled to be received inOctober 2027 - Returned
$22.3 million to shareholders during the third quarter. This included the repurchase of 191,944 shares at a cost of$5.7 million ($29.70 per share), and dividend of$16.6 million (quarterly$0.04 per share). Subsequent to quarter end, the Company increased its share repurchases with a further 549,757 shares repurchased at a cost of$16.6 million ($30.25 per share). Given its strong financial position and outlook, the Company expects to continue to be active on its share buyback - Repurchased and eliminated a further 33,000 of the remaining 50,000 ounces of legacy gold hedges from Argonaut in the third quarter. These contracts were scheduled to mature in the first half of 2027 with an average forward sale price of
$1,819 per ounce, providing further upside to higher gold prices in 2027. The Company utilized existing cash to eliminate the hedges at a cost of$86.2 million for an effective price of approximately$4,429 per ounce. Subsequent to quarter end, a further 3,000 ounces of forward sale contracts were repurchased and eliminated such that a total of 315,000 ounces, or 96%, of the 329,000 ounces of forward contracts inherited from Argonaut, have been retired prior to maturity. The remaining 14,000 ounces of forward contracts are expected to be eliminated prior to maturity after which there will be no obligation remaining under the legacy Argonaut hedges - Continued to advance construction of the Company's key growth projects. Work on the Phase 3+ Shaft Expansion is progressing, although the completion of commissioning of the shaft is delayed by approximately one quarter to mid-2027 given additional time required to complete the ore and waste handling system
- Construction of the PDA mill remains on track for completion mid-2027; however, the ramp up of underground development rates has been slower than planned which is expected to result in lower mining rates in the second half of 2027
Lynn Lake construction is ramping up as expected with initial production on track for the first half of 2029. The Company remains well positioned to achieve its longer term consolidated production rate of approximately one million ounces annually by 2030
(1) Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description and calculation of these measures.
Highlight Summary
| Three Months Ended | Nine Months Ended | |||
| 2026 | 2025 | 2026 | 2025 | |
| Financial Results (in millions) | ||||
| Operating revenues | ||||
| Cost of sales (1) | ||||
| Earnings from operations | ||||
| Earnings before income taxes | ||||
| Net earnings | ||||
| Adjusted net earnings (2) | ||||
| Adjusted earnings before interest, taxes, depreciation and amortization (2) | ||||
| Cash provided by operating activities | ||||
| Cash provided by operating activities before changes in working capital and taxes paid (2) | ||||
| Capital expenditures (sustaining) (2) | ||||
| Finance leases (sustaining) (2)(3) | ||||
| Capital expenditures (growth) (2) | ||||
| Capital expenditures (capitalized exploration) | ||||
| Free cash flow (2)(3) | ||||
| Operating Results | ||||
| Gold production (ounces) | 119,000 | 141,700 | 373,500 | 403,900 |
| Gold sales (ounces) | 118,361 | 136,473 | 371,118 | 389,083 |
| Per Ounce Data | ||||
| Average realized gold price (5) | ||||
| Average spot gold price (London PM Fix) | ||||
| Cost of sales per ounce of gold sold (includes amortization) (1) | ||||
| Total cash costs per ounce of gold sold (2) | ||||
| All-in sustaining costs per ounce of gold sold (2) | ||||
| Share Data | ||||
| Earnings per share, basic | ||||
| Earnings per share, diluted | ||||
| Adjusted earnings per share, basic (2) | ||||
| Weighted average common shares outstanding (basic) (000’s) | 418,572 | 420,500 | 419,383 | 420,463 |
| Financial Position (in millions) | ||||
| Cash and cash equivalents (4) | ||||
| (1) | Cost of sales includes mining and processing costs, inventory net realizable value adjustment, royalties, and amortization expense. |
| (2) | Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description and calculation of these measures. |
| (3) | Sustaining finance leases at the |
| (4) | Cash and cash equivalents in the comparatives reflect the balance as at |
| (5) | Average realized gold price for the nine months ended |
| Three Months Ended | Nine Months Ended | |||
| 2026 | 2025 | 2026 | 2025 | |
| Gold production (ounces) | ||||
| 68,700 | 66,800 | 197,400 | 190,400 | |
| 22,700 | 37,900 | 85,700 | 112,000 | |
| 27,600 | 37,000 | 90,400 | 101,500 | |
| Gold sales (ounces) | ||||
| 66,837 | 62,011 | 189,672 | 179,357 | |
| 23,809 | 37,406 | 87,710 | 111,095 | |
| 27,715 | 37,056 | 93,736 | 98,631 | |
| Cost of sales (in millions) (1) | ||||
| Cost of sales per ounce of gold sold (includes amortization) (1) | ||||
| Total cash costs per ounce of gold sold (2) | ||||
| Mine-site all-in sustaining costs per ounce of gold sold (2)(3) | ||||
| Capital expenditures (sustaining, growth, capitalized exploration and leases) (in millions) (2) | ||||
| Other | ||||
| (1) | Cost of sales includes mining and processing costs, inventory net realizable value adjustment, royalties, and amortization expense. |
| (2) | Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description and calculation of these measures. |
| (3) | For the purposes of calculating mine-site all-in sustaining costs at individual mine sites the Company allocates a portion of share based compensation to the mine sites, but does not include an allocation of corporate and administrative expenses to the mine sites. |
| (4) | Includes capitalized exploration at |
| (5) | Includes capitalized exploration at |
| (6) | Includes capitalized exploration at |
| (7) | |
| (8) | |
Environment, Social and Governance Summary Performance
Health and Safety
- Total Recordable Injury Frequency Rate1 (“TRIFR”) of 1.90 in the third quarter, an increase from the second quarter and prior year period
- Lost Time Injury Frequency Rate1 (“LTIFR”) of 0.12 in the third quarter
- Alamos had 32 recordable injuries across its sites, including two lost time injuries in the third quarter
- Year-to-date TRIFR of 1.60 and LTIFR of 0.07 are higher than the prior year period
The Company acknowledges the increase in injury frequency rate is not to its standards. During the quarter, the Company initiated work stand-downs across its operations led by site management and corporate senior management, refocusing on safe and sustainable production.
Alamos strives to maintain a safe, healthy working environment for all, with a strong safety culture where everyone is continually reminded of the importance of keeping themselves and their colleagues healthy and injury-free. The Company’s overarching commitment is to have all employees and contractors return Home Safe Every Day.
Environment
- Zero significant environmental incidents in the third quarter and year to date
- Reclamation activities at the
Cerro Pelon ,El Victor andSan Carlos pits in theMulatos District were completed
There was one reportable incident in the third quarter. At the
The Company remains committed to preserving the long-term health and viability of the natural environment surrounding its operations and projects. This includes investing in new initiatives to reduce the Company's environmental footprint, with the goal of minimizing the impact of its activities.
Community
Alamos continued to provide charitable donations, sponsorships, medical support and infrastructure investments within its local communities, including:
- Installation of additional infrastructure at the
Matarachi Community Center , and new playground equipment purchased for theMatarachi Park - Completing the first phase of the Mulatos community beekeeping initiative, having trained 32 families from across seven communities and three municipalities, creating new opportunities for income diversification, community capacity building, and biodiversity conservation
- Sponsorship of various events and teams, including golf tournament fundraisers, and music and community festivals around the Company’s operations
- Cash donations to various health, education, and food programs in the communities in which Alamos operates
In addition, in September, Alamos joined community discussions in
The Company believes that excellence in sustainability provides a net benefit to all stakeholders and continues to engage with local communities to better understand local challenges and priorities. Ongoing investments in local infrastructure, health care, education, cultural and community programs remain a focus of the Company.
Governance and Disclosure
- Completed annual submissions to the
Carbon Disclosure Project , reporting Alamos’ 2025 climate performance - Advanced Alamos’ annual ESG Report and Conflict-Free Gold Report, expected to be published during the fourth quarter
The Company maintains the highest standards of corporate governance to ensure that corporate decision-making reflects its values, including the Company’s commitment to sustainable development.
(1) Frequency rate is calculated as incidents per 200,000 hours worked.
Outlook and Strategy
| 2026 Guidance (5) | |||||
| Island Gold District | Mulatos District | Total | |||
| Gold production (000's ounces) | 290 - 310 | 100 - 115 | 120 - 135 | — | 510 - 560 |
| Cost of sales, including amortization (in millions) (2) | |||||
| Total cash costs ($ per ounce) (1) | — | ||||
| All-in sustaining costs ($ per ounce) (1)(3) | — | ||||
| Capital expenditures ($ millions) | |||||
| Sustaining capital (1)(4) | — | ||||
| Growth capital (1)(4) | |||||
| Total sustaining and growth capital (1)(4) | |||||
| Capitalized exploration (1) | |||||
| Total capital expenditures and capitalized exploration (1) | |||||
| (1) | Refer to the "Non-GAAP Measures and Additional GAAP Measures" section of this press release and associated MD&A for a description of these measures. |
| (2) | Cost of sales includes mining and processing costs, royalties, and amortization expense but excludes silver credit and inventory net realizable value adjustment, and is calculated based on the mid-point of total cash cost guidance. |
| (3) | Total consolidated all-in sustaining costs include corporate and administrative, and share based compensation expenses. For the purposes of calculating mine-site all-in sustaining costs at individual mine sites the Company allocates a portion of share based compensation to the mine sites, but does not include an allocation of corporate and administrative expenses to the mine sites. |
| (4) | Sustaining and growth capital guidance excludes capitalized exploration. |
| (5) | Initial annual guidance was issued on |
The Company’s objective is to operate a sustainable business model that supports growing returns to all stakeholders over the long-term, through growing production, expanding margins, and increasing profitability. This includes a balanced approach to capital allocation focused on generating strong ongoing free cash flow while re-investing in high-return internal growth opportunities, and supporting higher returns to shareholders.
Third quarter production of 119,000 ounces was in line with quarterly guidance, with a record performance from the
Production in the fourth quarter is expected to increase to between 140,000 and 160,000 ounces with total cash costs and AISC both decreasing to within the range of revised annual guidance. The improvement in both production and costs is expected to be driven by further growth from the
Underground mining rates within the
The Company continues to generate strong ongoing free cash flow while advancing its portfolio of high-return growth projects which are expected to support further production growth and lower costs over the next several years. Free cash flow totaled
The Company's key growth projects all continued to advance during the third quarter, including the
Underground mining rates are expected to continue increasing above 2,000 tpd in the first half of 2027; however, the ramp up to 2,400 tpd is not expected until the second half of the year. As a result, underground mining rates are expected to be lower than previously guided during the first half of 2027. The commissioning of the shaft is expected to drive consolidated gold production higher and costs lower as underground mining rates ramp up.
The Magino mill expansion to 20,000 tpd is progressing well and is expected to drive a further increase in production and decrease in costs in 2028.
Construction of the PDA mill remains on track for completion mid-2027; however, lower underground development rates are expected to result in lower than planned production from PDA during the second half of 2027. The slower pace of development reflects the requirement for additional ground support, as well as contractor performance. The Company expects improved development rates moving forward, but the performance to date is expected to impact the ramp up in mining rates through the second half of 2027.
The ramp up of construction activities at
The short-term delays within the
The Company remains well positioned to fund its high-return growth projects internally with strong ongoing free cash flow,
Given its strong outlook with significant free cash flow growth expected over the next several years, the Company expects to continue to be active on its share buyback while balancing its other capital allocation priorities.
Third Quarter 2026 Results
Island Gold District Financial and Operational Review
| Three Months Ended | Nine Months Ended | |||
| 2026 | 2025 | 2026 | 2025 | |
| Gold production (ounces) | 68,700 | 66,800 | 197,400 | 190,400 |
| Gold sales (ounces) | 66,837 | 62,011 | 189,672 | 179,357 |
| Financial Review (in millions) | ||||
| Operating revenues | ||||
| Cost of sales (1) | ||||
| Earnings from operations | ||||
| Cash provided by operating activities | ||||
| Capital expenditures (sustaining) (2) | ||||
| Finance leases (sustaining) (2),(5) | ||||
| Capital expenditures (growth) (2) | ||||
| Capital expenditures (capitalized exploration) (2) | ||||
| Mine-site free cash flow (2),(5) | ||||
| Cost of sales, including amortization per ounce of gold sold (1) | ||||
| Total cash costs per ounce of gold sold (2) | ||||
| Mine-site all-in sustaining costs per ounce of gold sold (2),(3) | ||||
| Underground Operations | ||||
| Tonnes of ore mined (9) | 164,634 | 121,864 | 433,826 | 345,272 |
| Tonnes of ore mined per day (9) | 1,790 | 1,325 | 1,589 | 1,265 |
| Average grade of gold (4),(9) | 8.69 | 12.05 | 9.04 | 11.69 |
| Metres developed | 2,128 | 1,779 | 6,072 | 6,058 |
| Island Gold Mill Operations (8) | ||||
| Tonnes of ore processed | 117,460 | 23,906 | 342,710 | 234,174 |
| Tonnes of ore processed per day (10) | 1,277 | 1,087 | 1,255 | 1,154 |
| Average grade of gold (4) | 9.37 | 13.20 | 9.81 | 12.03 |
| Contained ounces milled | 35,395 | 10,148 | 108,143 | 90,578 |
| Average recovery rate | 97% | 99% | 97% | 98% |
| Open Pit Operations | ||||
| Tonnes of ore mined - open pit (6) | 1,807,233 | 1,622,689 | 4,062,943 | 3,938,588 |
| Tonnes of ore mined per day | 19,644 | 17,638 | 14,883 | 14,427 |
| Total waste mined - open pit (7) | 3,995,799 | 3,764,681 | 11,224,595 | 11,104,219 |
| Total tonnes mined - open pit | 5,803,032 | 5,387,370 | 15,287,538 | 15,042,807 |
| Waste-to-ore ratio (7) | 2.21 | 2.32 | 2.76 | 2.82 |
| Average grade of gold (4) | 0.65 | 0.84 | 0.73 | 0.81 |
| Magino Mill Operations (8) | ||||
| Tonnes of ore processed | 948,782 | 776,796 | 2,431,243 | 2,210,908 |
| Tonnes of ore processed per day | 10,313 | 8,443 | 8,906 | 8,099 |
| Average grade of gold processed (4) | 1.17 | 2.28 | 1.20 | 1.42 |
| Contained ounces milled | 35,702 | 56,923 | 94,141 | 101,000 |
| Average recovery rate | 95% | 96% | 95% | 95% |
| Island Gold District Mill Operations | ||||
| Tonnes of ore processed per day | 11,590 | 8,703 | 10,161 | 8,956 |
| Average grade of gold processed (4) | 2.07 | 2.61 | 2.27 | 2.44 |
| Average recovery rate | 96% | 97% | 96% | 97% |
| (1) | Cost of sales includes mining and processing costs, royalties, and amortization. |
| (2) | Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description and calculation of these measures. |
| (3) | For the purposes of calculating mine-site all-in sustaining costs at individual mine sites the Company allocates a portion of share based compensation to the mine sites, but does not include an allocation of corporate and administrative expenses to the mine sites. |
| (4) | Grams per tonne of gold (“g/t Au”). |
| (5) | Mine-site free cash flow does not include lease payments which are classified as cash flows used in financing activities on the consolidated financial statements. |
| (6) | Includes ore stockpiled during the periods. |
| (7) | Total waste mined includes operating waste and capitalized stripping. |
| (8) | Magino mill results include the processing of open pit ore from Magino and excess underground ore not processed within the Island Gold mill. Grades of gold processed from the Magino mine averaged 0.88 g/t Au and 1.00 g/t Au, respectively, for the three and nine months ended |
| (9) | Excludes 13,541 tonnes of ore grading 2.98 g/t Au that was recovered from the ore pad and processed during the second quarter of 2026. |
| (10) | Island Gold average milling rates exclude the period where mill was on care and maintenance |
Island Gold Operational Review
Underground mining rates increased to average a record 1,790 tpd in the third quarter, 35% higher than the prior year period and a 15% increase from the previous quarter. Mining rates are expected to increase further during the fourth quarter and remain on track to reach 2,000 tpd by the end of 2026.
With the shaft sink completed earlier in the year, the current focus is on completing shaft equipping, and work on the shaft bottom infrastructure. During the excavation of the bins in the ore and waste handling system, a dyke was encountered that will require additional ground support. In addition, the Company is proactively enhancing ground support across the loading pocket and the broader ore and waste handling system. As a result, the commissioning of the shaft has been delayed by approximately one quarter and is now expected to be completed mid-2027.
Underground mining rates are expected to continue increasing above 2,000 tpd in the first half of 2027; however, the ramp up to 2,400 tpd is not expected until the second half of the year. As a result, underground mining rates are expected to be lower than previously guided during the first half of 2027.
Underground grades mined averaged 8.69 g/t Au during the third quarter, slightly below the second quarter and guidance due to higher than expected dilution within certain higher grade stopes mined in August. Dilution performance was in line with expectations in September. Grades are expected to improve to near the top end of the annual guidance range of 11.5 g/t Au in the fourth quarter.
Processing rates within the Island Gold mill averaged 1,277 tpd for the third quarter, with excess underground ore mined during the quarter processed within the Magino mill. Mill recoveries averaged 97% for the third quarter, in line with expectations.
The Island Gold mill will continue operating into the first quarter of 2028 and process approximately 1,265 tpd of higher grade underground ore. The remaining underground ore mined beyond the Island Gold mill capacity will be blended at increasing rates with open pit ore and processed within the Magino mill. Following the expected completion of the Magino mill expansion to 20,000 tpd in the first quarter of 2028, the Island Gold mill will be shut down and all underground and open pit ore will be processed within the larger and more cost-effective Magino mill.
Magino Operational Review
Total mining rates averaged 63,076 tpd during the third quarter, including 19,644 tpd of ore, which was 11% higher than the prior year period. Grades mined of 0.65 g/t Au for the third quarter were 23% lower than the prior year period and slightly below the guidance range for 2026, primarily due to changes in mining sequence in the pit. Year-to-date grades mined were in line with guidance.
Magino milling rates averaged a new quarterly record of 10,313 tpd in the third quarter, a 16% increase from the second quarter, and above targeted rates of 10,000 tpd in the second half of 2026. The increase reflects the improving performance and reliability of the overall circuit driven by an enhanced maintenance program which is supporting increased availability, as well as supplemental ore feed from the temporary crusher. Milling rates are expected to remain at steady state levels of 10,000 tpd in the fourth quarter and through 2027.
As outlined in the IGD Expansion Study announced on
Grades processed averaged 1.17 g/t Au during the third quarter, and included approximately 48,000 tonnes of higher grade underground ore. Recoveries for the third quarter were 95%, consistent with guidance.
Island Gold District Financial Review
Revenues of
Cost of sales of
Total cash costs of
Capital expenditures totaled
Young-Davidson Financial and Operational Review
| Three Months Ended | Nine Months Ended | |||
| 2026 | 2025 | 2026 | 2025 | |
| Gold production (ounces) | 22,700 | 37,900 | 85,700 | 112,000 |
| Gold sales (ounces) | 23,809 | 37,406 | 87,710 | 111,095 |
| Financial Review (in millions) | ||||
| Operating revenues | ||||
| Cost of sales (1) | ||||
| Earnings from operations | ||||
| Cash provided by operating activities | ||||
| Capital expenditures (sustaining) (2) | ||||
| Capital expenditures (growth) (2) | ||||
| Capital expenditures (capitalized exploration) (2) | ||||
| Mine-site free cash flow (2) | ||||
| Cost of sales, including amortization per ounce of gold sold (1) | ||||
| Total cash costs per ounce of gold sold (2) | ||||
| Mine-site all-in sustaining costs per ounce of gold sold (2),(3) | ||||
| Underground Operations | ||||
| Tonnes of ore mined | 472,400 | 667,801 | 1,769,857 | 1,930,719 |
| Tonnes of ore mined per day | 5,135 | 7,259 | 6,483 | 7,072 |
| Average grade of gold (4) | 1.60 | 1.92 | 1.71 | 1.98 |
| Metres developed | 1,423 | 1,800 | 5,507 | 6,135 |
| Mill Operations | ||||
| Tonnes of ore processed | 650,136 | 720,933 | 1,935,497 | 1,959,516 |
| Tonnes of ore processed per day | 7,067 | 7,836 | 7,090 | 7,178 |
| Average grade of gold (4) | 1.20 | 1.79 | 1.55 | 1.94 |
| Contained ounces milled | 25,117 | 41,387 | 96,593 | 122,354 |
| Average recovery rate | 90% | 91% | 89% | 91% |
| (1) | Cost of sales includes mining and processing costs, royalties and amortization. |
| (2) | Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description and calculation of these measures. |
| (3) | For the purposes of calculating mine-site all-in sustaining costs at individual mine sites the Company allocates a portion of share based compensation to the mine sites, but does not include an allocation of corporate and administrative expenses to the mine sites. |
| (4) | Grams per tonne of gold. |
Operational Review
Mining rates averaged 5,135 tpd in the third quarter, in line with revised guidance of 5,000 tpd for the second half of 2026. The Company is advancing rehabilitation work on the 9410 level, and continuing the implementation of enhanced ground support throughout the lower portion of the mine. In addition, an updated mine plan is being evaluated, designed to minimize stress through an optimized ore extraction sequence. These initiatives are expected to support a gradual increase in mining rates through 2027 and 2028. An update on future mining rates and costs will be provided following the completion of the updated mine plan, with an expected release early in 2027 in conjunction with the Company's three-year guidance.
Grades mined of 1.60 g/t Au for the third quarter were slightly lower than planned.
Milling rates averaged 7,067 tpd in the third quarter, higher than mining rates as lower-grade surface stockpiles were processed. As a result, milled grades of 1.20 g/t Au were below mined grades in the third quarter. Milling rates are expected to continue to exceed mining rates, and grades processed to be below mined grades, in the fourth quarter as additional stockpiles are processed. Mill recoveries averaged 90% for the third quarter and were consistent with guidance.
Financial Review
Revenues were
Cost of sales of
Third quarter total cash costs of
Capital expenditures in the third quarter totaled
Mine-site free cash flow was
Mulatos District Financial and Operational Review
| Three Months Ended | Nine Months Ended | |||
| 2026 | 2025 | 2026 | 2025 | |
| Gold production (ounces) | 27,600 | 37,000 | 90,400 | 101,500 |
| Gold sales (ounces) | 27,715 | 37,056 | 93,736 | 98,631 |
| Financial Review (in millions) | ||||
| Operating revenues | ||||
| Cost of sales (1) | ||||
| Earnings from operations | ||||
| Cash provided by operating activities | ||||
| Capital expenditures (sustaining) (2) | ||||
| Capital expenditures (growth) (2) | ||||
| Capital expenditures (capitalized exploration) (2) | ||||
| Mine-site free cash flow (2) | ||||
| Cost of sales, including amortization per ounce of gold sold (1) | ||||
| Total cash costs per ounce of gold sold (2) | ||||
| Mine-site all-in sustaining costs per ounce of gold sold (2),(3) | ||||
| Open Pit Operations | ||||
| Tonnes of ore mined - open pit | 548,157 | 997,286 | 2,248,782 | 3,007,335 |
| Total waste mined - open pit | 3,553,670 | 3,895,690 | 12,017,548 | 12,115,215 |
| Total tonnes mined - open pit | 4,101,827 | 4,892,976 | 14,266,330 | 15,122,550 |
| Waste-to-ore ratio | 6.48 | 3.91 | 5.34 | 4.03 |
| Crushing and Heap Leach Operations | ||||
| Tonnes of ore stacked | 539,283 | 1,011,191 | 2,346,838 | 3,050,211 |
| Average grade of gold processed (4) | 0.94 | 1.48 | 1.17 | 1.25 |
| Contained ounces stacked | 16,307 | 48,037 | 88,312 | 122,927 |
| Average recovery rate | 143% | 61% | 85% | 62% |
| Ore crushed per day (tonnes) | 5,900 | 11,000 | 8,600 | 11,200 |
| (1) | Cost of sales includes mining and processing costs, inventory net realizable value adjustment, royalties, and amortization expense. |
| (2) | Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description and calculation of these measures. |
| (3) | For the purposes of calculating mine-site all-in sustaining costs at individual mine sites the Company allocates a portion of share based compensation to the mine sites, but does not include an allocation of corporate and administrative expenses to the mine sites. |
| (4) | Grams per tonne of gold. |
Mulatos District Operational Review
La
La
Mulatos District Financial Review
Revenues of
Cost of sales of
Total cash costs of
Capital expenditures totaled
Construction of the PDA mill remains on track for completion mid-2027, while lower than planned underground development rates are expected to result in lower production from PDA during the second half of 2027. The slower pace of development reflects unexpected ground conditions in some areas, which are requiring additional ground support, as well as contractor performance. The Company expects improved development rates moving forward, but the performance to date is expected to impact the ramp up in mining rates through the second half of 2027. The Company will provide more details on the impact to production and costs with the release of the updated three-year guidance early in 2027.
Third Quarter 2026 Development Activities
Phase 3+ Shaft and IGD Expansion
In 2022, the Company announced the Phase 3+ Shaft Expansion at Island Gold from 1,200 tpd to 2,400 tpd. The expansion includes the construction of a shaft and paste plant, as well as accelerated development to support the higher mining rates.
With the shaft sink completed earlier in the year, the current focus is on completing shaft equipping, and work on the shaft bottom infrastructure. During the excavation of the bins in the ore and waste handling system, a dyke was encountered that will require additional ground support. In addition, the Company is proactively enhancing ground support across the loading pocket and the broader ore and waste handling system. As a result, the commissioning of the shaft has been delayed by approximately one quarter and is now expected to be completed mid-2027.
Underground mining rates are expected to continue increasing above 2,000 tpd in the first half of 2027; however, the ramp up to 2,400 tpd is not expected until the second half of the year. As a result, underground mining rates are expected to be lower than previously guided during the first half of 2027.
Following the completion of the Phase 3+ Shaft Expansion project, the operation will transition from trucking ore and waste up the ramp to skipping ore and waste to surface, driving production higher and costs significantly lower.
On
The Island Gold mill will continue operating and will be dedicated to processing approximately 1,265 tpd of higher grade underground ore until the expected completion of the Magino mill expansion in the first quarter of 2028. The remaining underground ore mined, beyond the Island Gold mill capacity of 1,265 tpd, will be blended at increasing rates with open pit ore and processed within the Magino mill.
During the third quarter of 2026, the Company spent
- Commissioning of the water handling facility substantially completed
- Continued shaft equipping and work on the ore and waste handling system in advance of shaft commissioning in mid-2027
- Magino mill expansion to 20,000 tpd is progressing with excavation and concrete works advancing for the crushers and fine ore bins, and refinery structural steel and foundation concrete works ongoing
- Advanced construction of the truck shop and truck wash with commissioning expected in the first quarter of 2027
Paste plant construction substantially complete with commissioning expected to coincide with shaft commissioning- Continued construction of the new administrative complex with completion expected in the fourth quarter of 2026
- Advanced lateral development in support of the ramp up of underground mining rates through 2026 and into 2027
As of
| Phase 3+ Shaft Expansion Estimate Growth capital ($ millions) | Spent to date1,2 | Committed to date1 | % Spent & Committed | |
| 96% | ||||
| 255 | 234 | 7 | 95% | |
| Site Infrastructure, Mill and Other3 | 165 | 184 | 6 | 115% |
| General Indirect Costs | 91 | 96 | 3 | 109% |
| Total Phase 3+ | 101% | |||
As of
| IGD Expansion Estimate Growth capital ($ millions) | Spent to date1,2 | Committed to date1 | % Spent & Committed | |
| Mill Expansion | 64% | |||
| 166 | 24 | — | 14% | |
| Mining Equipment | 81 | 16 | 25 | 51% |
| Site Infrastructure and Other | 96 | 27 | 23 | 52% |
| 45% |
| 1. | Reflects updated capital estimates released in |
| 2. | Amount spent to date accounted for on an accrual basis, including working capital movements. |
| 3. | Includes power upgrade spent to-date on a 100% basis and does not reflect partner’s contributions. |
Island Gold shaft site area -

1350L shaft station equipping in progress -

Magino mill expansion -

On
In
The updated parameters for the
- Average annual production of 186,000 ounces over the initial 10 years
- Low mine-site AISC of
$829 per ounce over the initial 10 years ($1,039 per ounce over the life of mine) - Long mine life of 25 years with total production of three million ounces (based on Mineral Reserves at the end of 2024)
- Attractive economics with significant near-mine and regional exploration upside
Capital spending on the
The majority of initial capital will be spent in 2027 and 2028, with first production expected in the first half of 2029. With attractive economics and significant exploration upside, the
During the third quarter of 2026, the Company spent
- Commissioned the permanent camp with occupancy permit obtained and 120 dorm rooms opened
- Progressed process plant site preparation and foundations work
- Commenced commissioning of the water and sewage treatment facilities
- Continued site-wide infrastructure construction, including roads, laydown areas, and settlement pond
- Advanced drill and blasting activities for the starter pit at MacLellan
| Spent to date1,2 | Committed to date1 | % Spent & Committed | ||
| 86% | ||||
| Process Plant, Utilities and Equipment | 334 | 45 | 65 | 33% |
| Site Infrastructure and Other | 121 | 25 | 22 | 39% |
| General Indirect Costs | 262 | 58 | — | 22% |
| Capitalized Operating Costs | 74 | 1 | — | 1% |
| 36% |
| 1. | Reflects updated capital estimates released in |
| 2. | Amount spent to date accounted for on an accrual basis, including working capital movements. |


PDA (
On
In
Construction of the PDA mill remains on track for completion mid-2027, while lower than planned underground development rates are expected to result in lower production from PDA during the second half of 2027. The slower pace of development reflects unexpected ground conditions in some areas, which are requiring additional ground support, as well as contractor performance. The Company expects improved development rates moving forward, but the performance to date is expected to impact the ramp up in mining rates through the second half of 2027. The Company will provide more details on the impact to production and costs with the release of the updated three-year guidance early in 2027.
During the third quarter of 2026, the Company spent
- Finalized all major equipment purchase orders with most deliveries expected during the fourth quarter
- Advanced underground mine development with 573 metres (“m”) completed during the third quarter
- Primary crusher and fine crushing construction continued to advance, with electrical conduit installation, power and control cable pulling, conveyor belt vulcanization, and control cabin installation completed
- Completed approximately 75% of mill structural works
- Completed installation of the primary and scavenger flotation cells
- Commenced structural works for the dewatering and water tanks, with receiver and air line installation ongoing
- Advanced distribution power line construction, with excavation completed for 18 of 24 pole pits
PDA portals -

PDA crusher and mill area -

Third Quarter 2026 Exploration Activities
A total of
In 2025, drilling programs at Island Gold and Magino focused on delineation drilling to convert the large Inferred Mineral Resource base to Mineral Reserves. This program was executed successfully and resulted in a significant increase in Mineral Reserves at both Island Gold and Magino, which was incorporated into the IGD Expansion that was announced on
A total of 50,000 m of underground exploration drilling is planned in 2026 with a focus on defining new Mineral Reserves and Resources in proximity to existing production horizons and infrastructure. This includes drilling across the strike extent of the main Island Gold deposit (E1E and C-Zones), as well as within a growing number of newly defined hanging-wall and footwall zones.
These potential high-grade Mineral Reserve and Resource additions would be low cost to develop, given their proximity to existing infrastructure, and provide increased operational flexibility as mining rates increase. To support the underground exploration program, 1,090 m of underground exploration drift development is planned to extend drill platforms on multiple levels.
Additionally, 48,000 m of surface exploration drilling has been budgeted targeting the area between the Island Gold and Magino deposits, as well as the down-plunge extension of the Island Gold deposit, below a depth of 1,500 m.
The regional exploration program at the
During the third quarter of 2026, 12,660 m of underground exploration drilling was completed in 60 holes, and 10,099 m of underground delineation drilling across 44 holes. Additionally, 13,063 m of surface exploration drilling was completed in 20 holes. Year to date, 33,615 m of underground exploration drilling was completed in 133 holes, or 67% of the budgeted metres, and 22,609 m of underground delineation drilling across 95 holes. Additionally, 30,207 m of surface exploration drilling was completed in 30 holes, representing 63% of the budget for the year.
As part of the regional exploration program, 8,463 m of drilling was completed in 16 holes at Cline-Pick in the third quarter. Year to date, 17,110 m of drilling has been completed in 31 holes at Cline-Pick, exceeding the budgeted regional drill program for the year.
As detailed in the June exploration update (see press release dated
Total exploration expenditures during the third quarter were
A total of
The regional program includes 10,000 m of drilling focused on evaluating several targets including the Otisse NE target and the Biralger target located approximately 3 km and 17 km northeast of
During the third quarter, 17,039 m of underground exploration drilling was completed in 52 holes across multiple levels. Drilling is targeting syenite-hosted mineralization, as well as continuing to test mineralization in the hanging wall sediments and mafic-ultramafic stratigraphy. Year to date, 46,008 m of drilling has been completed in 132 holes. The seismic event that occurred at
A total of 4,865 m of regional surface exploration drilling was completed in 16 holes in the first quarter focused on evaluating the Otisse NE and Biralger targets. No regional exploration drilling was undertaken in the third quarter; however, drilling is planned in the fourth quarter.
Total exploration expenditures during the third quarter of 2026 were
A total of
During the third quarter, 4,483 m of surface exploration drilling was completed in 15 holes at
Total exploration expenditures during the third quarter were
A total of
In total, 13,740 m of drilling was completed in 25 holes at the Gordon and MacLellan deposits in the first half of the year. Results have been received, and geological models are being updated to be used for 2027 drill planning purposes.
Exploration spending totaled
Qiqavik (
A total of
The 2026 exploration program will follow up on discoveries made across several target areas during the 2025 drill program, and test the next series of highest priority targets as outlined in a press release dated
During the third quarter, the Company completed a comprehensive exploration program at the Qiqavik project consisting of diamond drilling, geological mapping, prospecting, till sampling, and drone-based magnetic surveys (5,395 line-km). A total of 7,461 m of drilling was completed in 23 holes across seven target zones, including both follow-up drilling on established mineralized trends and initial testing of newly generated targets, for which assays are pending. Exploration activities successfully refined the geological and structural framework of the property, identified additional gold-bearing occurrences, and advanced the understanding of relationships between gold-bearing boulder trains and their potential bedrock source areas. Information generated through the 2026 program is expected to support the prioritization of follow-up targets and future discovery-focused drilling campaigns.
Exploration spending was
Review of Third Quarter Financial Results
During the third quarter of 2026, the Company sold 118,361 ounces of gold for operating revenues of
The average realized gold price in the third quarter was
Cost of sales (which includes mining and processing costs, royalties, and amortization expense) was
Mining and processing costs were
Total cash costs of
Royalty expense was
Amortization of
The Company recognized earnings from operations of
In the third quarter, net loss on commodity derivatives was
The Company reported net earnings of
Associated Documents
This press release should be read in conjunction with the Company’s consolidated financial statements for the three-month period ended
Reminder of Third Quarter 2026 Results Conference Call
Senior management will host a conference call on
Via Webcast:
To view the live webcast, please register at www.alamosgold.com, or through the following link view webcast.
Via Phone:
| (647) 495-7514 | |
| Toll free ( | (888) 596-4144 |
| Participant passcode: | 1813237# |
Alternatively, you may register your phone number here within 30 minutes of the scheduled start of the call to receive an instant automated call back.
A playback will be available until
Qualified Persons
About Alamos
Alamos is a Canadian-based intermediate gold producer with diversified production from three operations in
FOR FURTHER INFORMATION, PLEASE CONTACT:
| Senior Vice-President, Corporate Development & Investor Relations |
| (416) 368-9932 x 5439 |
| Vice President, |
| (416) 368-9932 x 5427 |
The TSX and NYSE have not reviewed and do not accept responsibility for the adequacy or accuracy of this release.
Cautionary Note Regarding Forward-Looking Statements
This press release contains or incorporates by reference “forward-looking statements” and “forward-looking information” as defined under applicable Canadian and
Such statements in this press release may include (without limitation) information, assumptions, expectations and guidance as to strategy, plans, and future financial and operating performance, such as those regarding: free cash flow; mine-site free cash flow; costs (including total cash costs, AISC, mine-site AISC, capital expenditures, growth and sustaining capital, capitalized exploration, exploration spending); budgets; tax rates and the payment of taxes; total liquidity; returns to stakeholders; opportunities for share repurchases under the Company's Normal Course Issuer Bid; repurchase of legacy Argonaut hedges; impacts of inflation and increasing labour and contractor costs; mine plans; mine life; Mineral Reserve life; Mineral Reserves and Resources; gold and other metal price assumptions; foreign exchange rates; sector outlook; size, value and profitability of operations and the Company's balanced approach to capital allocation; expanding margins; project economics; project risks; mining methodologies; underground development rates; mining, stacking, milling and processing rates; total mill feed and throughput rates; recovery rates; anticipated gold production, production rates, timing of production, further production potential and growth; gold grades; exploration potential, budgets, focuses, programs, targets, and projected results; investment in and funding of growth initiatives and projects; operational impacts on the natural environment; the Company's approach to reduction of its environmental footprint, greenhouse gas emissions, and related investments in new initiatives; community relations, engagement activities, and initiatives; corporate governance; plans with respect to health and safety; project milestones and timing and effects of completion of the IGD Expansion and the Phase 3+ Shaft Expansion; Magino mill expansion and intended effects on costs and processing; infrastructure upgrades; power projects; in the
Alamos cautions that forward-looking statements are necessarily based upon several factors and assumptions that, while considered reasonable by the Company at the time of making such statements, are inherently subject to significant business, economic, technical, legal, political and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements and undue reliance should not be placed on such statements and information.
Risk factors that may affect Alamos’ ability to achieve the expectations set forth in the forward-looking statements in this document include, but are not limited to: the actual results of current exploration activities; changes to current estimates of Mineral Reserves and Resources; changes to production estimates (which assume accuracy of projected ore grade, mining rates, recovery timing and recovery rate estimates which may be impacted by unscheduled maintenance, weather issues, labour and contractor availability and other operating or technical difficulties in connection with mining or development activities, including geotechnical challenges); conclusions of economic and geological evaluations; the costs and timing of exploration, construction and development of new deposits; changes in project parameters as plans continue to be refined; operations may be exposed to illnesses, diseases, epidemics and pandemics which may impact, among other things, the broader market and the trading price of the Company's shares; the duration of any regulatory responses to any illness, disease, epidemic or pandemic; government and the Company’s attempts to reduce the spread of any illness, disease, epidemic or pandemic which may affect many aspects of the Company's operations including the ability to transport personnel to and from site, contractor and supply availability and the ability to sell or deliver gold doré bars; provincial, state and federal orders or mandates (including with respect to mining operations generally or auxiliary businesses or services required for the Company’s operations) in
Additional risk factors and details with respect to risk factors that may affect the Company’s ability to achieve the expectations set forth in the forward-looking statements contained in this press release are set out in the Company's latest 40-F/Annual Information Form and its Management's Discussion and Analysis for the year ended
The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by applicable law.
Cautionary Note to U.S. Investors
Measured, Indicated and Inferred Resources: All resource and reserve estimates included in this press release or documents referenced in this press release have been prepared in accordance with Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and the
Investors are cautioned that while the above terms are “substantially similar” to CIM Definitions, there are differences in the definitions under Regulation S-K 1300 and the CIM Standards. Accordingly, there is no assurance any mineral reserves or mineral resources that the Company may report as “proven mineral reserves”, “probable mineral reserves”, “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had the Company prepared the mineral reserve or mineral resource estimates under the standards adopted under Regulation S-K 1300. U.S. investors are also cautioned that while the
International Financial Reporting Standards: The condensed interim consolidated financial statements of the Company have been prepared by management in accordance with International Financial Reporting Standard 34, Interim Financial Reporting, as issued by the
Non-GAAP Measures and Additional GAAP Measures
The Company has included certain non-GAAP financial measures to supplement its condensed interim consolidated financial statements for the three and nine months ended
- adjusted net earnings and adjusted earnings per share;
- cash flow from operating activities before changes in working capital and taxes paid;
- Company-wide free cash flow;
- total mine-site free cash flow;
- mine-site free cash flow;
- total cash costs per ounce of gold sold;
- AISC per ounce of gold sold;
- mine-site AISC per ounce of gold sold;
- sustaining and non-sustaining capital expenditures; and
- adjusted earnings before interest, taxes, depreciation, and amortization ("Adjusted EBITDA").
The Company believes that these measures, together with measures determined in accordance with IFRS, provide investors with an improved ability to evaluate the underlying performance of the Company. Non-GAAP financial measures do not have any standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar measures employed by other companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Management's determination of the components of non-GAAP and additional measures is evaluated on a periodic basis influenced by new items and transactions, a review of investor uses and new regulations as applicable. Any changes to the measures are duly noted and retrospectively applied as applicable.
Adjusted Net Earnings and Adjusted Earnings per Share
“Adjusted net earnings” and “adjusted earnings per share” are non-GAAP financial measures with no standard meaning under IFRS which exclude the following from net earnings:
- Foreign exchange gains or losses
- Items included in other loss
- Impairment expense/reversal of impairment
- Net gain or loss on commodity derivatives
- Certain non-recurring items
- Foreign exchange gain or loss recorded in deferred tax expense
- The income and mining tax impact of items included in other loss
The Company uses adjusted net earnings for its own internal purposes. Management’s internal budgets and forecasts and public guidance do not reflect the items which have been excluded from the determination of adjusted net earnings. Consequently, the presentation of adjusted net earnings enables shareholders to better understand the underlying operating performance of the core mining business through the eyes of management. Management periodically evaluates the components of adjusted net earnings based on an internal assessment of performance measures that are useful for evaluating the operating performance of the Company’s business and a review of the non-GAAP measures used by mining industry analysts and other mining companies.
Adjusted net earnings is intended to provide additional information only and does not have any standardized meaning under IFRS and may not be comparable to similar measures presented by other companies. It should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measure is not necessarily indicative of operating profit or cash flows from operations as determined under IFRS. The following table reconciles this non-GAAP measure to the most directly comparable IFRS measure.
| (in millions) | ||||
| Three Months Ended | Nine Months Ended | |||
| 2026 | 2025 | 2026 | 2025 | |
| Net earnings | ||||
| Adjustments: | ||||
| Foreign exchange (gain) loss | (0.9) | 1.5 | (4.3) | 7.7 |
| Impairment reversal, net of tax | — | (192.9) | — | (192.9) |
| Inventory net realizable value adjustment, net of tax | — | — | 7.0 | — |
| Net loss on commodity derivatives, net of tax | 9.9 | 53.8 | 2.7 | 117.2 |
| Other loss | 1.8 | 3.9 | 4.8 | 7.1 |
| Unrealized foreign exchange loss (gain) recorded in deferred tax expense | 8.0 | 13.9 | 27.1 | (29.1) |
| Other income and mining tax adjustments | (0.4) | (1.0) | (1.1) | (1.4) |
| Adjusted net earnings | ||||
| Adjusted earnings per share - basic | ||||
Cash Flow from Operating Activities before Changes in Working Capital and Taxes Paid
“Cash flow from operating activities before changes in working capital and taxes paid” is a non-GAAP performance measure that could provide an indication of the Company’s ability to generate cash flows from operations, and is calculated by adding back the change in working capital and taxes paid to cash flow from operating activities. “Cash flow from operating activities before changes in working capital and taxes paid” is a non-GAAP financial measure with no standard meaning under IFRS. The following table reconciles this non-GAAP measure to the most directly comparable IFRS measure.
| (in millions) | ||||
| Three Months Ended | Nine Months Ended | |||
| 2026 | 2025 | 2026 | 2025 | |
| Cash flow from operating activities | ||||
| Add: Changes in working capital and taxes paid | 18.6 | 10.0 | 169.2 | 95.2 |
| Cash flow from operating activities before changes in working capital and taxes paid | | | | |
Company-wide Free Cash Flow
“Company-wide free cash flow" is a non-GAAP performance measure calculated from cash flow from operating activities, less mineral property, plant and equipment expenditures and non-recurring costs. The Company believes this to be a useful indicator of its ability to operate without reliance on additional borrowing or usage of existing cash company-wide. Company-wide free cash flow is intended to provide additional information only and does not have any standardized meaning under IFRS and may not be comparable to similar measures of performance presented by other mining companies. Company-wide free cash flow should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.
| (in millions) | ||||
| Three Months Ended | Nine Months Ended | |||
| 2026 | 2025 | 2026 | 2025 | |
| Cash flow from operating activities | ||||
| Less: mineral property, plant and equipment expenditures | (226.9) | (135.0) | (591.0) | (349.6) |
| Add: early settlement of legacy Argonaut hedges (1) | 86.2 | — | 221.2 | — |
| Company-wide free cash flow | | | | |
(1) Represents the early settlement of 33,000 ounces and 83,000 ounces, respectively, during the three and nine months ended
Mine-site Free Cash Flow
"Mine-site free cash flow" is a non-GAAP financial performance measure calculated as cash flow from operating mine-sites, less mine-site mineral property, plant and equipment expenditures. The Company believes this to be a useful indicator of its ability to operate without reliance on additional borrowing or usage of existing cash. Mine-site free cash flow is intended to provide additional information only and does not have any standardized meaning under IFRS and may not be comparable to similar measures of performance presented by other mining companies. Mine-site free cash flow should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.
| Consolidated Mine-Site Free Cash Flow | Three Months Ended | Nine Months Ended | ||
| 2026 | 2025 | 2026 | 2025 | |
| (in millions) | ||||
| Cash flow from operating activities | | | | |
| Add: operating cash flow used by non-mine site activity (1) | 109.1 | 62.7 | 356.2 | 194.8 |
| Cash flow from operating mine-sites | | | | |
| Mineral property, plant and equipment expenditures | | | | |
| Less: capital expenditures from development projects and corporate | (42.8) | (15.1) | (104.3) | (43.4) |
| Capital expenditure and capital advances from mine-sites | | | | |
| Total mine-site free cash flow | | | | |
| Island Gold District Mine-Site Free Cash Flow | Three Months Ended | Nine Months Ended | ||
| 2026 | 2025 | 2026 | 2025 | |
| (in millions) | ||||
| Cash flow from operating activities (1) | ||||
| Mineral property, plant and equipment expenditures | (131.5) | (88.5) | (346.0) | (226.9) |
| Mine-site free cash flow | | | | |
| Young-Davidson Mine-Site Free Cash Flow | Three Months Ended | Nine Months Ended | ||
| 2026 | 2025 | 2026 | 2025 | |
| (in millions) | ||||
| Cash flow from operating activities (1) | ||||
| Mineral property, plant and equipment expenditures | (24.9) | (20.2) | (71.0) | (60.4) |
| Mine-site free cash flow | | | | |
| Mulatos District Mine-Site Free Cash Flow | Three Months Ended | Nine Months Ended | ||
| 2026 | 2025 | 2026 | 2025 | |
| (in millions) | ||||
| Cash flow from operating activities | | | | |
| Mineral property, plant and equipment expenditures | (27.7) | (11.2) | (69.7) | (18.9) |
| Mine-site free cash flow | | | | |
| (1) | Cash from operating activities for the Canadian operations excludes the impact of the nil ounces and 12,255 ounces settled under the gold prepayment arrangement for the three and nine months ended |
Total Cash Costs per ounce
Total cash costs per ounce is a non-GAAP term typically used by gold mining companies to evaluate the costs of producing gold and to assess the ability of a mining company to generate cash flow from operating activities. Total cash costs per ounce includes mining and processing costs plus applicable royalties, and net of costs allocated to by-product and net realizable value adjustments. Total cash costs per ounce is exclusive of exploration costs. As well, the Company excludes mark-to-market adjustments for the revaluation of previously issued share-based compensation, therefore, total cash costs will incorporate the cost of long term incentives associated with the grant date fair value for instruments issued.
Total cash costs per ounce is intended to provide additional information only and does not have any standardized meaning under IFRS and may not be comparable to similar measures presented by other mining companies. It should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measure is not necessarily indicative of cash flow from operating activities under IFRS or operating costs presented under IFRS.
All-in Sustaining Costs per ounce and Mine-site All-in Sustaining Costs
The Company adopted an “all-in sustaining costs per ounce” non-GAAP performance measure in accordance with the
For the purposes of calculating mine-site all-in sustaining costs at individual mine sites the Company allocates a portion of share based compensation to the mine sites, but does not include an allocation of corporate and administrative expenses to the mine sites, as detailed in the reconciliations below.
Sustaining capital expenditures are expenditures that do not increase annual gold ounce production at a mine site and exclude all expenditures at the Company’s development projects as well as certain expenditures at the Company’s operating sites that are deemed expansionary in nature. Non-sustaining capital expenditures or growth capital are expenditures primarily incurred at development projects and costs related to major projects at existing operations, where these projects will materially benefit the mine site. Capitalized exploration expenditures are expenditures that meet the IFRS definition for capitalization and are incurred to further expand the known Mineral Reserves and Resources at existing operations or development projects. For each mine-site reconciliation, corporate and administrative costs, and non-site specific costs are not included in the all-in sustaining cost per ounce calculation.
All-in sustaining costs per gold ounce is intended to provide additional information only and does not have any standardized meaning under IFRS and may not be comparable to similar measures presented by other mining companies. It should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measure is not necessarily indicative of cash flow from operating activities under IFRS or operating costs presented under IFRS.
Total Cash Costs and All-in Sustaining Costs per Ounce Reconciliation Tables
The following tables reconcile these non-GAAP measures to the most directly comparable IFRS measures on a Company-wide and individual mine-site basis.
| Total Cash Costs and AISC Reconciliation - Company-wide | ||||
| Three Months Ended | Nine Months Ended | |||
| 2026 | 2025 | 2026 | 2025 | |
| (in millions, except ounces and per ounce figures) | ||||
| Mining and processing | ||||
| Share-based compensation mark-to-market allocated to sites (included in mining and processing) (2) | (1.0) | (5.3) | (0.3) | (9.3) |
| Costs allocated to silver by-product | (6.3) | (4.0) | (19.4) | (10.4) |
| Royalties | 6.2 | 6.2 | 19.8 | 18.6 |
| Total cash costs | ||||
| Gold ounces sold | 118,361 | 136,473 | 371,118 | 389,083 |
| Total cash costs per ounce | | | | |
| Total cash costs | ||||
| Corporate and administrative (1) | 10.2 | 9.6 | 32.3 | 29.6 |
| Sustaining capital expenditures (3) | 49.9 | 34.8 | 130.7 | 95.1 |
| Sustaining finance leases | 3.0 | 4.3 | 10.2 | 12.6 |
| Interest on sustaining finance leases | 0.3 | 0.4 | 1.1 | 1.7 |
| Share-based compensation | 5.0 | 16.7 | 18.7 | 47.1 |
| Share-based compensation mark-to-market allocated to corporate (2) | (2.7) | (13.8) | (0.6) | (25.4) |
| Sustaining exploration | 0.6 | 0.4 | 1.9 | 1.5 |
| Accretion of decommissioning liabilities | 2.5 | 2.4 | 7.2 | 7.0 |
| Total all-in sustaining costs | ||||
| Gold ounces sold | 118,361 | 136,473 | 371,118 | 389,083 |
| Total all-in sustaining costs per ounce | | | | |
| (1) | Corporate and administrative expenses exclude expenses incurred at development properties. |
| (2) | Share-based compensation included in total cash costs and AISC excludes the impact of mark-to-market adjustments for changes in the Company’s share price in the periods allocated to sites (included in mining and processing costs) and corporate head office (included in share-based compensation expense). See Note 10 (d) of the condensed interim consolidated financial statements for the three and nine months ended |
| (3) | Sustaining capital expenditures are defined as those expenditures which do not increase annual gold ounce production at a mine site and exclude all expenditures at growth projects and certain expenditures at operating sites which are deemed expansionary in nature. Total sustaining capital expenditures for the periods are as follows: |
| Three Months Ended | Nine Months Ended | |||
| 2026 | 2025 | 2026 | 2025 | |
| (in millions) | ||||
| Mineral property, plant and equipment expenditures | | | | |
| Less: non-sustaining capital expenditures at: | ||||
| (99.2) | (64.6) | (263.0) | (167.4) | |
| (7.8) | (10.0) | (25.1) | (26.6) | |
| (27.2) | (10.5) | (67.9) | (17.1) | |
| Corporate and other | (42.8) | (15.1) | (104.3) | (43.4) |
| Sustaining capital expenditures | | | | |
| Island Gold District Total Cash Costs and Mine-site AISC Reconciliation | ||||
| Three Months Ended | Nine Months Ended | |||
| 2026 | 2025 | 2026 | 2025 | |
| (in millions, except ounces and per ounce figures) | ||||
| Mining and processing | ||||
| Share-based compensation mark-to-market allocated to sites (included in mining and processing) (1) | (0.3) | (2.0) | (0.1) | (3.5) |
| Costs allocated to silver by-product | (1.0) | (0.2) | (2.4) | (1.1) |
| Royalties | 3.4 | 2.8 | 9.0 | 9.7 |
| Total cash costs | ||||
| Gold ounces sold | 66,837 | 62,011 | 189,672 | 179,357 |
| Mine-site total cash costs per ounce | | | | |
| Total cash costs | ||||
| Sustaining capital expenditures | 32.3 | 23.9 | 83.0 | 59.5 |
| Sustaining finance leases | 3.0 | 4.3 | 10.2 | 12.6 |
| Interest on sustaining finance leases | 0.3 | 0.4 | 1.1 | 1.7 |
| Accretion of decommissioning liabilities | 0.5 | 0.4 | 1.4 | 1.1 |
| Total all-in sustaining costs | ||||
| Gold ounces sold | 66,837 | 62,011 | 189,672 | 179,357 |
| Mine-site all-in sustaining costs per ounce | | | | |
| Young-Davidson Total Cash Costs and Mine-site AISC Reconciliation | ||||
| Three Months Ended | Nine Months Ended | |||
| 2026 | 2025 | 2026 | 2025 | |
| (in millions, except ounces and per ounce figures) | ||||
| Mining and processing | ||||
| Share-based compensation mark-to-market allocated to sites (included in mining and processing) (1) | (0.4) | (1.8) | (0.1) | (3.1) |
| Costs allocated to silver by-product | (2.2) | (0.9) | (5.6) | (2.2) |
| Royalties | 1.6 | 2.1 | 6.4 | 5.6 |
| Total cash costs | ||||
| Gold ounces sold | 23,809 | 37,406 | 87,710 | 111,095 |
| Mine-site total cash costs per ounce | | | | |
| Total cash costs | ||||
| Sustaining capital expenditures | 17.1 | 10.2 | 45.9 | 33.8 |
| Accretion of decommissioning liabilities | 0.1 | 0.1 | 0.4 | 0.4 |
| Total all-in sustaining costs | ||||
| Gold ounces sold | 23,809 | 37,406 | 87,710 | 111,095 |
| Mine-site all-in sustaining costs per ounce | | | | |
| Mulatos District Total Cash Costs and Mine-site AISC Reconciliation | ||||
| Three Months Ended | Nine Months Ended | |||
| 2026 | 2025 | 2026 | 2025 | |
| (in millions, except ounces and per ounce figures) | ||||
| Mining and processing | ||||
| Share-based compensation mark-to-market allocated to sites (included in mining and processing) (1) | (0.3) | (1.5) | (0.1) | (2.7) |
| Costs allocated to silver by-product | (3.1) | (2.8) | (11.4) | (7.1) |
| Royalties | 1.2 | 1.3 | 4.4 | 3.3 |
| Total cash costs | ||||
| Gold ounces sold | 27,715 | 37,056 | 93,736 | 98,631 |
| Mine-site total cash costs per ounce | | | | |
| Total cash costs | ||||
| Sustaining capital expenditures | 0.5 | 0.7 | 1.8 | 1.8 |
| Accretion of decommissioning liabilities | 1.9 | 1.9 | 5.4 | 5.5 |
| Total all-in sustaining costs | ||||
| Gold ounces sold | 27,715 | 37,056 | 93,736 | 98,631 |
| Mine-site all-in sustaining costs per ounce | | | | |
| (1) | Share-based compensation included in mine-site total cash costs and mine-site AISC excludes the impact of mark-to-market adjustments for changes in the Company’s share price in the periods allocated to sites included in mining and processing costs. |
Adjusted EBITDA
Adjusted EBITDA represents net earnings before interest, taxes, depreciation, and amortization and removes the effects of certain items that the Company believes are not reflective of the Company's underlying performance for the reporting period. The measure also removes the impact of non-cash items such as impairment loss charges or reversals, and net gain or loss on derivative financial instruments. Adjusted EBITDA is an indicator of the Company’s ability to generate liquidity by producing operating cash flow to fund working capital needs, service debt obligations, and fund capital expenditures.
Adjusted EBITDA does not have any standardized meaning under IFRS and may not be comparable to similar measures presented by other mining companies. It should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The following table reconciles this non-GAAP measure to the most directly comparable IFRS measure.
| (in millions) | ||||
| Three Months Ended | Nine Months Ended | |||
| 2026 | 2025 | 2026 | 2025 | |
| Net earnings | ||||
| Adjustments: | ||||
| Reversal of impairment | — | (218.8) | — | (218.8) |
| Inventory net realizable value adjustment | — | — | 10.8 | — |
| Finance income | (5.9) | (1.2) | (18.0) | (1.2) |
| Amortization | 44.2 | 52.0 | 137.9 | 156.1 |
| Net loss on commodity derivatives | 14.6 | 80.0 | 4.0 | 174.2 |
| Deferred income tax expense | 48.6 | 48.7 | 156.6 | 35.3 |
| Current income tax expense | 44.9 | 46.5 | 200.3 | 92.6 |
| Adjusted EBITDA | | | | |
Additional GAAP Measures
Additional GAAP measures are presented on the Company’s condensed interim consolidated financial statements and are not meant to be a substitute for other subtotals or totals presented in accordance with IFRS, but rather should be evaluated in conjunction with such IFRS measures. The following additional GAAP measures are used and are intended to provide an indication of the Company’s mine and operating performance:
- Earnings from operations - represents the amount of earnings before net finance expense/income, foreign exchange loss/gain, other loss, net loss/gain on commodity derivatives and income tax expense
Unaudited Condensed Interim Consolidated Statements of Financial Position, Comprehensive
Income, and Cash Flow
Condensed Interim Consolidated Statements of Financial Position
(Unaudited - stated in millions of
| ASSETS | |||
| Current Assets | |||
| Cash and cash equivalents | |||
| Equity securities | 44.2 | 58.9 | |
| Amounts receivable | 59.1 | 45.0 | |
| Inventories | 215.6 | 225.4 | |
| Deferred payment consideration | 162.6 | 157.1 | |
| Other current assets | 36.1 | 26.0 | |
| Total Current Assets | 1,115.0 | 1,135.5 | |
| Non-Current Assets | |||
| Mineral property, plant and equipment | 5,462.8 | 4,957.5 | |
| Deferred income taxes | 41.1 | 34.0 | |
| Inventories | 130.9 | 84.9 | |
| Deferred payment consideration | 147.1 | 142.0 | |
| Other non-current assets | 11.4 | 30.7 | |
| Total Assets | | | |
| LIABILITIES | |||
| Current Liabilities | |||
| Accounts payable and accrued liabilities | |||
| Derivative liabilities | 48.7 | 128.0 | |
| Deferred revenue | — | 50.0 | |
| Income taxes payable | 95.1 | 53.6 | |
| Current portion of lease liabilities | 9.3 | 11.8 | |
| Current portion of decommissioning liabilities | 14.0 | 8.1 | |
| Total Current Liabilities | 553.9 | 567.6 | |
| Non-Current Liabilities | |||
| Deferred income taxes | 1,032.0 | 873.3 | |
| Derivative liabilities | — | 129.1 | |
| Debt | 200.0 | 200.0 | |
| Lease liabilities | 17.2 | 11.2 | |
| Decommissioning liabilities | 149.5 | 153.4 | |
| Other non-current liabilities | 4.0 | 4.2 | |
| Total Liabilities | 1,956.6 | 1,938.8 | |
| EQUITY | |||
| Share capital | |||
| Contributed surplus | 84.5 | 87.7 | |
| Accumulated other comprehensive (loss) income | (18.8) | 0.3 | |
| Retained earnings | 754.7 | 217.2 | |
| Total Equity | 4,951.7 | 4,445.8 | |
| Total Liabilities and Equity | | | |
Condensed Interim Consolidated Statements of Comprehensive Income
(Unaudited - stated in millions of
| Three Months Ended | Nine Months Ended | ||||||
| 2026 | 2025 | 2026 | 2025 | ||||
| OPERATING REVENUES | |||||||
| COST OF SALES | |||||||
| Mining and processing | 163.8 | 135.9 | 483.1 | 415.3 | |||
| Inventory net realizable value adjustment | — | — | 10.8 | — | |||
| Royalties | 6.2 | 6.2 | 19.8 | 18.6 | |||
| Amortization | 44.2 | 52.0 | 137.9 | 156.1 | |||
| 214.2 | 194.1 | 651.6 | 590.0 | ||||
| EXPENSES | |||||||
| Exploration | 12.3 | 5.0 | 27.8 | 19.0 | |||
| Corporate and administrative | 10.2 | 9.6 | 32.3 | 29.6 | |||
| Share-based compensation | 5.0 | 16.7 | 18.7 | 47.1 | |||
| Reversal of impairment | — | (218.8) | — | (218.8) | |||
| 241.7 | 6.6 | 730.4 | 466.9 | ||||
| EARNINGS FROM OPERATIONS | 268.7 | 455.7 | 970.8 | 766.6 | |||
| OTHER (EXPENSES) INCOME | |||||||
| Net loss on commodity derivatives | (14.6) | (80.0) | (4.0) | (174.2) | |||
| Finance income | 5.9 | 1.2 | 18.0 | 1.2 | |||
| Foreign exchange gain | 0.9 | (1.5) | 4.3 | (7.7) | |||
| Other loss | (1.8) | (3.9) | (4.8) | (7.1) | |||
| EARNINGS BEFORE INCOME TAXES | | | | | |||
| INCOME TAXES | |||||||
| Current income tax expense | (44.9) | (46.5) | (200.3) | (92.6) | |||
| Deferred income tax expense | (48.6) | (48.7) | (156.6) | (35.3) | |||
| NET EARNINGS | | | | | |||
| Items that may be subsequently reclassified to net earnings: | |||||||
| Net change in fair value of currency hedging instruments, net of taxes | (3.8) | (3.3) | (7.6) | 7.1 | |||
| Net change in fair value of fuel hedging instruments, net of taxes | 0.3 | — | 0.9 | — | |||
| Items that will not be reclassified to net earnings: | |||||||
| Unrealized gain (loss) on equity securities, net of taxes | 4.5 | 19.5 | (12.0) | 28.4 | |||
| Total other comprehensive income (loss) | | | ( | | |||
| COMPREHENSIVE INCOME | | | | | |||
| EARNINGS PER SHARE | |||||||
| – basic | | | | | |||
| – diluted | | | | | |||
Condensed Interim Consolidated Statements of Cash Flows
(Unaudited - stated in millions of
| Three Months Ended | Nine Months Ended | ||||||
| 2026 | 2025 | 2026 | 2025 | ||||
| CASH PROVIDED BY (USED IN): | |||||||
| OPERATING ACTIVITIES | |||||||
| Net earnings | |||||||
| Adjustments for items not involving cash: | |||||||
| Amortization | 44.2 | 52.0 | 137.9 | 156.1 | |||
| Reversal of impairment | (218.8) | (218.8) | |||||
| Inventory net realizable value adjustment | — | — | 10.8 | ||||
| Foreign exchange (gain) loss | (0.9) | 1.5 | (4.3) | 7.7 | |||
| Current income tax expense | 44.9 | 46.5 | 200.3 | 92.6 | |||
| Deferred income tax expense | 48.6 | 48.7 | 156.6 | 35.3 | |||
| Share-based compensation | 7.0 | 22.5 | 20.9 | 58.0 | |||
| Finance income | (5.9) | (1.2) | (18.0) | (1.2) | |||
| Net loss on commodity derivatives | 14.6 | 80.0 | 4.0 | 174.2 | |||
| Deferred revenue recognized | — | (31.2) | (51.0) | (93.5) | |||
| Settlement of legacy Argonaut gold hedges | (86.2) | — | (221.2) | — | |||
| Other items | 3.0 | (1.0) | (3.6) | (21.7) | |||
| Changes in working capital and taxes paid | (18.6) | (10.0) | (169.2) | (95.2) | |||
| 216.3 | 265.3 | 690.6 | 544.4 | ||||
| INVESTING ACTIVITIES | |||||||
| Mineral property, plant and equipment | (226.9) | (135.0) | (591.0) | (349.6) | |||
| Interest capitalized to mineral property, plant and equipment | (3.0) | (4.3) | (9.2) | (13.2) | |||
| Repurchase of royalty on | — | — | — | (2.0) | |||
| Proceeds from disposition of equity securities | — | 5.6 | 0.6 | 7.4 | |||
| Investment in equity securities | — | — | (0.6) | (0.2) | |||
| Transaction costs arising on asset dispositions and acquisitions | — | (0.2) | — | (0.2) | |||
| (229.9) | (133.9) | (600.2) | (357.8) | ||||
| FINANCING ACTIVITIES | |||||||
| Dividends paid | (16.2) | (10.1) | (48.6) | (29.4) | |||
| Repurchase and cancellation of common shares | (5.7) | — | (55.7) | (10.0) | |||
| Credit facility transaction costs, standby fees and interest | (1.1) | (0.3) | (1.9) | (2.2) | |||
| Proceeds from the exercise of options and warrants | 0.2 | 1.3 | 0.8 | 3.1 | |||
| Lease payments | (3.0) | (4.3) | (10.2) | (12.6) | |||
| (25.8) | (13.4) | (115.6) | (51.1) | ||||
| Effect of exchange rates on cash and cash equivalents | (0.1) | 0.2 | (0.5) | 0.4 | |||
| Net (decrease) increase in cash and cash equivalents | (39.5) | 118.2 | (25.7) | 135.9 | |||
| Cash and cash equivalents - beginning of period | 636.9 | 344.9 | 623.1 | 327.2 | |||
| CASH AND CASH EQUIVALENTS - END OF PERIOD | | | | | |||
Photos accompanying this announcement are available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/6d1a29e1-0154-42a7-a129-20a638aad6b9
https://www.globenewswire.com/NewsRoom/AttachmentNg/03bfa292-d224-4cfd-8c22-ddc40ea130aa
https://www.globenewswire.com/NewsRoom/AttachmentNg/d802db77-a4b5-4311-9d67-6c09e8e3d786
https://www.globenewswire.com/NewsRoom/AttachmentNg/b162f26f-f2ee-489e-af99-a2335d1fc159
https://www.globenewswire.com/NewsRoom/AttachmentNg/a8a7e949-6b99-49d5-9be3-7d39bf50c706
https://www.globenewswire.com/NewsRoom/AttachmentNg/84e28a01-5b0f-440c-b1d0-a3c4e04c7a70
https://www.globenewswire.com/NewsRoom/AttachmentNg/7177f97d-1ab4-4276-95de-dfd0c0fbfd07