All monetary amounts are expressed in
"
"Looking ahead, we expect to deliver several key milestones over the coming quarters. The updated Côté mine plan, expected later this year, will be the first in a series of studies across our portfolio through 2027. These include an extended mine life at Essakane, a preliminary economic assessment for the
HIGHLIGHTS:
Operating and Financial
Attributable gold production was 186,900 ounces in the third quarter and 558,600 ounces year-to-date ("YTD"), with the Company on track to achieve its 2026 production guidance of 720,000 to 820,000 ounces.
Côté produced 64,400 attributable ounces (92,000 ounces | 100%) in the third quarter and 184,000 attributable ounces YTD (262,900 ounces | 100%). Production at Côté is expected to be higher in the fourth quarter of the year due to higher grades from mine sequencing and increased processing rates;
Westwood produced 28,500 ounces in the third quarter and 97,100 ounces YTD. During the quarter, the mill team identified gold-bearing sludge type material that had accumulated at the bottom of the pregnant solution tank in the electrowinning circuit. For further details, refer to the "Westwood" section below;
Essakane produced 94,000 attributable ounces (110,500 ounces | 100%) in the third quarter and 277,500 attributable ounces (326,400 ounces | 100%) YTD.
Revenues in the third quarter totaled
$856.5 million from sales of 199,900 ounces at an average realized gold price1 of$4,277 per ounce and$2,743.5 million YTD from sales of 606,500 ounces at an average realized gold price of$4,514 per ounce.Cost of sales per ounce sold was
$1,622 ($1,630 YTD), cash cost1 per ounce sold, excluding royalties was$1,266 ($1,251 YTD), cash cost1 per ounce sold, including royalties was$1,614 ($1,621 YTD).All-in sustaining cost1 ("AISC")1 per ounce sold, excluding royalties, was
$1,836 ($1,821 YTD) and AISC1 per ounce sold, including royalties was$2,184 ($2,191 YTD).Net earnings and adjusted net earnings attributable to equity holders1 for the third quarter was
$297.0 million ($907.2 million YTD) and$237.0 million ($869.7 million YTD), respectively.Net earnings and adjusted net earnings per share attributable to equity holders1 for the third quarter of
$0.52 ($1.57 YTD) and$0.42 ($1.50 YTD), respectively.Net cash from operating activities was
$461.1 million for the third quarter ($1,476.1 million YTD). Net cash from operating activities, before movements in working capital and non-current ore stockpiles1, was$422.9 million for the third quarter ($1,495.3 million YTD).Earnings before interest, income taxes, depreciation and amortization ("EBITDA")1 was
$584.4 million for the third quarter ($1,736.7 million YTD), and adjusted EBITDA1 was$503.9 million ($1,677.5 million YTD).Mine-site free cash flow1 was
$404.3 million during the third quarter ($1,297.8 million YTD).The Company has available liquidity1 of
$1,613.4 million as atSeptember 30, 2026 . Cash and cash equivalents was$766.6 million and the available balance of the revolving credit facility ("Credit Facility") was$845.8 million . Net cash, excluding leases and letters of credit1, was$317.6 million .In health and safety, for the quarter ended
September 30, 2026 , the Company reported a total recordable injuries frequency rate ("TRIFR") of 0.58 and is tracking at 0.57 for the year.IAMGOLD is continuing to advance its critical risk management program and visible leadership to improve safety and reduce high-potential incidents.
Corporate
The Company purchased
$134.7 million IAMGOLD shares (7.6 million shares) as part of the share buyback program during the quarter. The Company has purchased 32.1 million shares for$592.6 million since the inception of the program inDecember 2025 . Subject to applicable TSX approval, the Company intends to continue to use cash flow from Essakane to repurchase shares under a share buyback program as cash is generated and repatriated from Essakane.Total cash repatriated from Essakane in the third quarter was
$87.8 million , and$497.6 million YTD. An additional$135.8 million was repatriated subsequent to quarter end. The cash was repatriated from the dividend declared in 2026 of approximately$500 million from Essakane's 2025 profits. The Company's portion, net of theGovernment of Burkina Faso portion and withholding taxes, is approximately$400 million , of which$223.6 million has been received to date. The remaining balance is expected to be distributed at regular intervals based on the cash generated in excess of working capital requirements by Essakane.On
August 10, 2026 , the Company announced it has completed the divestiture of its 35% interest in the Bambadji Joint Venture inSenegal , generating$69.7 million in cash proceeds, before taxes and transaction costs of$21.7 million , for net proceeds of$48.0 million , monetizing a non-core exploration asset and further strengthening focus onIAMGOLD's operating and development portfolio.On
November 5, 2026 , the Company delivered toFranco Nevada ("FNV") an irrevocable notice exercising its contractual right to repurchase 50% of FNV's existing 7.5% Gross Margin Royalty ("GMR") over the CôtéGold Mine . Upon completion of the repurchase, the GMR payable by the UJV to FNV will be reduced from 7.5% to 3.75%.Sumitomo Metals Mining Co., Ltd ("SMM"), throughSMM Gold Cote Inc. ("SMMGC") elected not to participate in the repurchase. Accordingly,IAMGOLD will fund the full repurchase price, estimated to be approximately$525 million and will retain the full economic benefit of the 50% GMR repurchase, pursuant to the arrangements between the Company, SMM and SMMGC. After giving effect to the 50% repurchase of the FNV GMR and the related arrangements betweenIAMGOLD , SMM and SMMGC,IAMGOLD's GMR burden in respect of its 70% interest in the CotéGold Mine is expected to reduce from 7.5% to 3.75% following the exercise of its option and reduce further to an effective GMR of 2.14% due toIAMGOLD exercising SMM's 30% portion as well. The transaction is expected to close inDecember 2026 , with economic effect fromJanuary 1, 2027 .On
August 6, 2026 , the Company announced that Ms.Catherine McLeod-Seltzer has been appointed to the Company's Board of Directors effectiveSeptember 1, 2026 .Ms. McLeod-Seltzer , who was inducted into theCanadian Mining Hall of Fame in 2026, brings more than four decades of mining industry experience as both a senior executive and public-company director.
QUARTERLY REVIEW
For more details and the Company's overall outlook for 2026, see "Outlook", and for individual mines performance, see "Operations". The following table summarizes certain operating and financial results for the three months ended
| Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 | |||||||||
| Key Operating Statistics ($ millions) | ||||||||||||
| Gold production - attributable (000s oz) | 186.9 | 189.5 | 558.6 | 523.5 | ||||||||
| - Côté Gold1 | 64.4 | 74.6 | 184.0 | 192.7 | ||||||||
| - Westwood | 28.5 | 22.7 | 97.1 | 76.0 | ||||||||
| - Essakane2 | 94.0 | 92.2 | 277.5 | 254.8 | ||||||||
| Gold sales - attributable (000s oz) | 183.1 | 186.7 | 557.0 | 524.8 | ||||||||
| - Côté Gold1 | 59.2 | 75.9 | 181.2 | 195.9 | ||||||||
| - Westwood | 28.3 | 20.7 | 95.0 | 76.5 | ||||||||
| - Essakane2 | 95.6 | 90.1 | 280.8 | 252.4 | ||||||||
| Cost of sales3 ($/oz sold) | $ | 1,622 | $ | 1,593 | $ | 1,630 | $ | 1,542 | ||||
| - Côté Gold1 | $ | 1,551 | $ | 1,323 | $ | 1,604 | $ | 1,272 | ||||
| - Westwood | $ | 1,817 | $ | 1,937 | $ | 1,552 | $ | 1,664 | ||||
| - Essakane2 | $ | 1,608 | $ | 1,740 | $ | 1,674 | $ | 1,714 | ||||
| Cash costs4 - excluding royalties ($/oz sold) | $ | 1,266 | $ | 1,338 | $ | 1,251 | $ | 1,321 | ||||
| - Côté Gold1 | $ | 1,243 | $ | 1,084 | $ | 1,283 | $ | 1,051 | ||||
| - Westwood | $ | 1,794 | $ | 1,924 | $ | 1,529 | $ | 1,648 | ||||
| - Essakane2 | $ | 1,122 | $ | 1,419 | $ | 1,136 | $ | 1,430 | ||||
| Cash costs4 ($/oz sold) | $ | 1,614 | $ | 1,588 | $ | 1,621 | $ | 1,537 | ||||
| - Côté Gold1 | $ | 1,544 | $ | 1,320 | $ | 1,597 | $ | 1,269 | ||||
| - Westwood | $ | 1,794 | $ | 1,924 | $ | 1,529 | $ | 1,648 | ||||
| - Essakane2 | $ | 1,603 | $ | 1,737 | $ | 1,667 | $ | 1,711 | ||||
| AISC4 - excluding royalties ($/oz sold) | $ | 1,836 | $ | 1,706 | $ | 1,821 | $ | 1,753 | ||||
| - Côté Gold1 | $ | 1,755 | $ | 1,358 | $ | 1,768 | $ | 1,395 | ||||
| - Westwood | $ | 2,118 | $ | 2,793 | $ | 1,980 | $ | 2,310 | ||||
| - Essakane2 | $ | 1,582 | $ | 1,596 | $ | 1,595 | $ | 1,704 | ||||
| AISC4 ($/oz sold) | $ | 2,184 | $ | 1,956 | $ | 2,191 | $ | 1,969 | ||||
| - Côté Gold1 | $ | 2,056 | $ | 1,594 | $ | 2,082 | $ | 1,613 | ||||
| - Westwood | $ | 2,118 | $ | 2,793 | $ | 1,980 | $ | 2,310 | ||||
| - Essakane2 | $ | 2,063 | $ | 1,914 | $ | 2,126 | $ | 1,985 | ||||
| Average realized gold price ($/oz) | $ | 4,277 | $ | 3,492 | $ | 4,514 | $ | 3,153 |
- Attributable portion for Côté Gold is based on
IAMGOLD's ownership of 70%. See "Operations - Côté Gold, Canada" for more details. IAMGOLD's Essakane ownership interest decreased from 90% to 85% effectiveJune 20, 2025 . See "Operations - Essakane,Burkina Faso " for more details. The attributable portion for Essakane is presented as 90% for the first half of 2025 and 85% thereafter throughout this news release.- Excludes depreciation - as disclosed in the segment note in the consolidated interim financial statements.
- Refer to the "Non-GAAP Financial Measures" disclosure at the end of this news release for a description and calculation of these measures.
| Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 | |||||||||
| Financial Results ($ millions) | ||||||||||||
| Revenues | $ | 856.5 | $ | 706.7 | $ | 2,743.5 | $ | 1,764.7 | ||||
| Gross profit | $ | 406.0 | $ | 272.6 | $ | 1,391.8 | $ | 612.6 | ||||
| EBITDA1 | $ | 584.4 | $ | 338.4 | $ | 1,736.7 | $ | 817.4 | ||||
| Adjusted EBITDA1 | $ | 503.9 | $ | 359.5 | $ | 1,677.5 | $ | 840.4 | ||||
| Net earnings attributable to equity holders | $ | 297.0 | $ | 139.4 | $ | 907.2 | $ | 257.8 | ||||
| Adjusted net earnings attributable to equity holders1 | $ | 237.0 | $ | 170.9 | $ | 869.7 | $ | 303.4 | ||||
| Net earnings per share attributable to equity holders | $ | 0.52 | $ | 0.24 | $ | 1.57 | $ | 0.45 | ||||
| Adjusted net earnings per share attributable to equity holders1 | $ | 0.42 | $ | 0.30 | $ | 1.50 | $ | 0.53 | ||||
| Net cash from operating activities before changes in working capital1 | $ | 422.9 | $ | 280.6 | $ | 1,495.3 | $ | 512.8 | ||||
| Net cash from operating activities | $ | 461.1 | $ | 280.8 | $ | 1,476.1 | $ | 440.9 | ||||
| Basic weighted average number of common shares outstanding (in millions) | $ | 570.4 | $ | 575.2 | $ | 578.6 | $ | 574.3 | ||||
| Mine-site free cash flow1 | $ | 404.3 | $ | 292.3 | $ | 1,297.8 | $ | 572.4 | ||||
| Capital expenditures1 - sustaining | $ | 86.3 | $ | 59.9 | $ | 271.2 | $ | 200.0 | ||||
| Capital expenditures1 - expansion | $ | 23.4 | $ | 10.4 | $ | 58.2 | $ | 24.6 |
| 2026 | 2025 | |||||
| Financial Position ($ millions) | ||||||
| Cash and cash equivalents | $ | 766.6 | $ | 421.9 | ||
| Long-term debt | $ | 449.2 | $ | 649.8 | ||
| Net cash (debt) excluding lease liabilities and letters of credit | $ | 317.6 | $ | (228.1 | ) | |
| Net cash (debt)1 | $ | 213.9 | $ | (344.4 | ) | |
| Available Credit Facility | $ | 845.8 | $ | 445.7 |
- Refer to the "Non-GAAP Financial Measures" disclosure at the end of this news release for a description and calculation of these measures.
OUTLOOK
Production (000 oz)
| YTD 2026 | Full Year Guidance 2026 | |
| Côté Gold - (70%) | 184.0 | 270 - 310 |
| Westwood - (100%) | 97.1 | 110 - 130 |
| Essakane - (85%) | 277.5 | 340 - 380 |
| Total attributable production (000s oz) | 558.6 | 720 - 820 |
Total attributable production for
Costs
| YTD 2026 | Full Year Guidance3 2026 | |
| Côté Gold | ||
| Cash costs - excluding royalties ($/oz sold) | ||
| Cash costs - including royalties3 ($/oz sold) | ||
| AISC - excluding royalties3 ($/oz sold) | ||
| AISC - including royalties3 ($/oz sold) | ||
| Westwood | ||
| Cash costs ($/oz sold) | ||
| AISC ($/oz sold) | ||
| Essakane | ||
| Cash costs - excluding royalties ($/oz sold) | ||
| Cash costs - including royalties3 ($/oz sold) | ||
| AISC - excluding royalties3 ($/oz sold) | ||
| AISC - including royalties3 ($/oz sold) | ||
| Consolidated | ||
| Cost of sales1 ($/oz sold) | ||
| Cash costs1,2 - excluding royalties ($/oz sold) | ||
| Cash costs1,2 - including royalties3 ($/oz sold) | ||
| AISC1,2 - excluding royalties3 ($/oz sold) | ||
| AISC1,2 - including royalties3 ($/oz sold) |
- Consists of Côté Gold, Westwood and Essakane on an attributable basis of 70%, 100%, and 85%, respectively.
- This is a non-GAAP financial measure. See "Non-GAAP Financial Measures".
- Guidance for cash costs and AISC, including royalties, assumes a
$4,000 per ounce gold price in the estimate of royalties per ounce.
Cash costs on a consolidated basis, excluding royalties, are expected to be in the upper half of the range of
AISC on a consolidated basis, excluding royalties, is expected to be in the upper range of
The guidance for cash costs and AISC, including royalties, was established using a gold price assumption of
Royalty Sensitivities
| $ per ounce sold | |||
| Gold Price | Consolidated | Côté Gold | Essakane |
The realized gold price in the first nine months of the year averaged
During the first nine months of 2026, price escalation of approximately 3% has been observed across certain commodity inputs, which remained within the Company's inflation expectations. The Company continuously evaluates key commodity indices and forward supplier pricing guidance to proactively identify areas of potential cost inflation to inform any price mitigation measures that may be warranted. For further information on the expected impacts from fluctuation in guidance assumptions, refer to the Sensitivity Impact table included in the "Financial Review" section.
Capital Expenditures
| YTD 2026 | Updated Full Year Guidance 20261 | Previous Full Year Guidance | ||||||||||||||||||||||||||
| ($ millions) | Sustaining | Expansion | Total | Sustaining | Expansion | Total | Sustaining | Expansion | Total | |||||||||||||||||||
| Côté Gold (70%) | $ | 84.5 | $ | 44.5 | $ | 129.0 | $ | 130 | $ | 85 | $ | 215 | $ | 160 | $ | 85 | $ | 245 | ||||||||||
| Westwood (100%) | 41.6 | 12.0 | 53.6 | 55 | 30 | 85 | 55 | 30 | 85 | |||||||||||||||||||
| Essakane (100%) | 145.0 | 1.7 | 146.7 | 195 | 5 | 200 | 165 | 5 | 170 | |||||||||||||||||||
| $ | 271.1 | $ | 58.2 | $ | 329.3 | $ | 380 | $ | 120 | $ | 500 | $ | 380 | $ | 120 | $ | 500 | |||||||||||
| Corporate | 0.1 | - | 0.1 | - | - | - | - | - | - | |||||||||||||||||||
| Total2 | $ | 271.2 | $ | 58.2 | $ | 329.4 | $ | 380 | $ | 120 | $ | 500 | $ | 380 | $ | 120 | $ | 500 | ||||||||||
- Capital expenditures guidance (±5%).
- Includes
$7 million of capitalized exploration and evaluation expenditures also included in the Exploration Outlook guidance table.
Sustaining capital expenditures are expected to be approximately
Sustaining capital at Essakane is expected to be
Expansion capital expenditures are expected to total
Exploration Outlook
| YTD 2026 | Full Year Guidance 2026 | |||||||||||||||||
| ($ millions) | Capitalized | Expensed | Total | Capitalized | Expensed | Total | ||||||||||||
| Exploration projects - greenfield | $ | 6.9 | $ | 20.9 | $ | 27.8 | $ | 11 | $ | 34 | $ | 45 | ||||||
| Exploration projects - brownfield | 7.7 | 1.4 | 9.1 | 7 | 2 | 9 | ||||||||||||
| $ | 14.6 | $ | 22.3 | $ | 36.9 | $ | 18 | $ | 36 | $ | 54 | |||||||
Exploration expenditures for 2026 are expected to be approximately
Income Taxes Paid and Depreciation Outlook
| ($ millions) | YTD 2026 | Updated Full Year Guidance 2026 | Previous Full Year Guidance 2026 |
| Depreciation expense | |||
| Income taxes paid |
The Company expects to pay cash taxes in the range of
Depreciation expense for 2026 is expected to be
ENVIRONMENTAL, SOCIAL AND GOVERNANCE
Health and Safety
The TRIFR in the third quarter was 0.58 as of
Environmental
There were no significant environmental incidents reported for the quarter.
Social Performance
During the third quarter of 2026,
Indigenous Relations
As a Canadian business committed to responding to the
Earlier this year,
Culture and Inclusion
OPERATIONS
Côté
| Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 | |||||||||
| Key Operating Statistics (100% basis, unless otherwise stated) | ||||||||||||
| Ore mined (000s t) | 3,797 | 3,841 | 10,422 | 10,126 | ||||||||
| Grade mined (g/t) | 0.93 | 0.96 | 0.93 | 0.90 | ||||||||
| Operating waste mined (000s t) | 5,008 | 6,770 | 14,811 | 18,275 | ||||||||
| Capital waste mined (000s t) | 3,606 | 853 | 8,240 | 5,626 | ||||||||
| Total material mined (000s t) | 12,411 | 11,464 | 33,473 | 34,027 | ||||||||
| Strip ratio1 | 2.3 | 2.0 | 2.2 | 2.4 | ||||||||
| Ore milled (000s t) | 2,879 | 2,988 | 8,093 | 8,015 | ||||||||
| Head grade (g/t) | 1.10 | 1.18 | 1.10 | 1.15 | ||||||||
| Recovery (%) | 90 | 94 | 92 | 93 | ||||||||
| Gold production (000s oz) - 100% | 92.0 | 106.0 | 262.9 | 275.2 | ||||||||
| Gold production (000s oz) - 70% | 64.4 | 74.6 | 184.0 | 192.7 | ||||||||
| Gold sales (000s oz) - 100% | 84.6 | 108.0 | 258.5 | 279.9 | ||||||||
| Gold sales (000s oz) - 70% | 59.2 | 75.9 | 181.2 | 195.9 | ||||||||
| Average realized gold price2 ($/oz) | $ | 4,335 | $ | 3,484 | $ | 4,503 | $ | 3,285 | ||||
| Financial Results ($ millions - attributable interest) | ||||||||||||
| Revenues | $ | 257.0 | $ | 263.6 | $ | 817.3 | $ | 644.0 | ||||
| Cost of sales3 | 91.9 | 100.0 | 290.7 | 249.1 | ||||||||
| Production costs | 78.0 | 81.8 | 238.2 | 206.2 | ||||||||
| (Increase)/decrease in finished goods | (3.9 | ) | 0.3 | (4.4 | ) | 0.2 | ||||||
| Royalties4 | 17.8 | 17.9 | 56.9 | 42.7 | ||||||||
| Cash costs2 | 91.4 | 99.8 | 289.3 | 248.5 | ||||||||
| Sustaining capital expenditures2 | 29.1 | 27.7 | 84.5 | 73.1 | ||||||||
| Expansion capital expenditures2 | 17.4 | 8.3 | 44.5 | 18.0 | ||||||||
| Total sustaining and expansion capital expenditures2 | 46.5 | 36.0 | 129.0 | 91.1 | ||||||||
| Earnings from operations | 120.9 | 110.4 | 393.5 | 261.6 | ||||||||
| Mine-site free cash flow2 | 81.5 | 135.6 | 343.7 | 287.1 | ||||||||
| Unit costs per tonne2 | ||||||||||||
| Mine costs per operating tonne mined2 | $ | 4.77 | $ | 4.51 | $ | 4.81 | $ | 4.00 | ||||
| Mill costs per tonne milled2 | $ | 18.92 | $ | 22.01 | $ | 21.25 | $ | 19.68 | ||||
| G&A costs per tonne milled2 | $ | 8.45 | $ | 6.14 | $ | 8.62 | $ | 6.73 | ||||
| Operating costs per ounce5 | ||||||||||||
| Cost of sales excluding depreciation ($/oz sold) | $ | 1,551 | $ | 1,323 | $ | 1,604 | $ | 1,272 | ||||
| Cash costs2 - excluding royalties ($/oz sold) | $ | 1,243 | $ | 1,084 | $ | 1,283 | $ | 1,051 | ||||
| Cash costs2 ($/oz sold) | $ | 1,544 | $ | 1,320 | $ | 1,597 | $ | 1,269 | ||||
| AISC2 - excluding royalties ($/oz sold) | $ | 1,755 | $ | 1,358 | $ | 1,768 | $ | 1,395 | ||||
| AISC2 - including royalties ($/oz sold) | $ | 2,056 | $ | 1,594 | $ | 2,082 | $ | 1,613 |
- Strip ratio is calculated as waste mined divided by ore mined.
- This is a non-GAAP financial measure. See "Non-GAAP Financial Measures".
- Excludes depreciation - as disclosed in the segment note in the consolidated interim financial statements.
- Includes the 7.5% gross margin royalty and various net smelter return royalties.
- Cost of sales, cash costs excluding royalties cash costs and AISC per ounce sold may not be calculated based on amounts presented in this table due to rounding.
Operations
Côté Gold attributable gold production in the third quarter 2026 was 64,400 ounces (92,000 ounces | 100%), lower by 10,200 ounces or 14% than the prior year period:
Mining activity totaled a quarterly record of 12.4 million tonnes in the third quarter 2026, higher by 0.9 million tonnes or 8% than the same prior year period. Ore tonnes mined were 3.8 million tonnes, slightly lower than the prior year period, due to a slightly higher strip ratio of 2.3:1 as mining activities progressed in pushback areas. The average grade mined was 0.93 g/t in the third quarter 2026, a decrease of 3% over the prior year period, in line with expectations as mining was focused on opening the pit further through the planned pushback.
Mill throughput in the third quarter 2026 totaled 2.9 million tonnes, a decrease of 4% over the prior year period due to an extended annual shutdown in August and the transition to owner-only crushing. In September, the Côté plant averaged 37,100 tonnes per day totaling 1.1 million tonnes, above nameplate capacity of 36,000 tpd.
Head grades in the third quarter 2026 averaged 1.10 g/t, 7% lower than the prior year period, at average recoveries of 90%, lower than in prior quarters due to downtime on one of the plant's two Vertimills early in the quarter. As part of ongoing plant optimization and debottlenecking, work has begun on a third Vertimill, expected to be installed in early 2027. The reconciliation between the reserve models, grade control models, mill feed and production continue to be well within expected tolerances.
Operational improvements continued through the quarter, the first full quarter without external contractor crushing and associated rehandling. These included record crusher and high-pressure grinding rolls ("HPGR") throughput in September and improvements in process delivering ore to the mill. These improvements, combined with access to higher-grade mining zones, position the operation for improved performance in the fourth quarter.
The Company discontinued the use of external contractor crushing by the end of
Financial Performance (70% basis) - Q3 2026 Compared to Q3 2025
Production costs of
The Company continues to prioritize its plans to reduce mining and milling costs exiting 2026 at approximately
$4 /t and$15 /t, respectively, and expects to realize further reductions in 2027 onwards as the remaining productivity improvement initiatives are implemented.Mining costs averaged
$4.77 per tonne mined during the three months endedSeptember 30, 2026 , an increase from prior year period due to higher diesel costs, increased contractor deployment and pioneering work related to the pit pushback, and increased cost of explosives consumed.Milling costs were
$18.92 per tonne milled during the three months endedSeptember 30, 2026 . Unit costs decreased in the third quarter due to the discontinuation of the external contractor crusher and higher labour costs to fill vacant positions in the mill. Unit costs improved in September, averaging$15.36 per tonne milled, as operating and maintenance processes adjusted to fully owner-operated crushing and the plant achieved record crusher and HPGR throughput, with 1.1 million tonnes milled.
G&A costs were
Cost of sales, excluding depreciation, of
Cash costs, excluding royalties, of
Royalties during the three months ended
Cash costs, including royalties, of
AISC per ounce sold of
Capital expenditures totaled
Mine-site free cash flow, on an attributable basis, was
2026 Outlook
Côté Gold attributable production in 2026 is expected to be at the lower end of the guidance range of 270,000 to 310,000 ounces (390,000 to 440,000 ounces | 100%). The focus in 2026 is on stabilization, optimization, improving the cost structure, and preparing for the contemplated throughput increase and inclusion of Gosselin into the mine plan. Short to medium term capital investment is planned to improve the operating efficiency and cost structure while also systematically investing to derisk future expansions.
Mining activities in 2026 are planning a total of approximately 48 million tonnes of material mined, which includes the pushback to open up the pit to improve mine efficiency and prepare for the envisioned expansion. Mining rates are expected to increase in the fourth quarter of the year as the mining fleet supporting the external contractor crusher becomes available, the pioneering of the push back is mostly complete and with the commissioning of three new haul trucks. Mill throughput is expected to average 36,000 tpd (nameplate) over the course of the fourth quarter. Plant head grades are expected to average between 1.05 g/t and 1.15 g/t. Gold production is expected to be higher in the fourth quarter of the year based on increased throughput and higher grades in the final quarter of the year.
Cash costs, excluding royalties, at Côté Gold are expected to exceed the top end of the guidance range of
AISC, excluding royalties, are expected to be at the top end of the guidance range of
Sustaining capital expenditures guidance for Côté Gold is now expected to total
Expansion capital of
Expansion Opportunities
The Company is planning to release an updated Côté Gold mine plan and Mineral Reserve estimate in the fourth quarter of 2026, which will be included in a subsequent Technical Report shortly thereafter. The study will incorporate the recently consolidated Côté and Gosselin Mineral Resources and operating assumptions based on production experience to date.
The updated mine plan is expected to demonstrate a significant expansion of Mineral Reserves and life of mine, while outlining near-term opportunities to progressively increase plant throughput beyond the current nameplate, through further debottlenecking and targeted plant improvements, to support sustained processing rates of approximately 40,000 tpd. In parallel, the Company is continuing to evaluate opportunities for a larger-scale expansion of the processing plant, supported by the size and quality of the consolidated Côté-Gosselin resource base and the potential to support a substantially larger operation over the long term. Technical, infrastructure, and permitting studies are ongoing to determine the optimal scale, configuration, and development path to maximize the long-term value of the operation.
Exploration
On
This updated estimate is with an effective date of
Côté Gold Measured and Indicated ("M&I") Mineral Resources (100% basis) on a consolidated basis of 20.3 million ounces of gold, an increase of approximately 2.2 million ounces, or 12%, compared with the
December 31, 2025 , statement.Côté Gold Inferred Mineral Resources (100% basis) on a consolidated basis of 3.5 million ounces of gold, an increase of approximately 1.3 million ounces, or 61%, compared with the
December 31, 2025 , statement.
The exploration program at Côté Gold is ongoing with a focus on the Côté, Gosselin and saddle area. The 2026 Gosselin zone exploration program includes approximately 10,000 metres of diamond drilling to test the north and north-east extensions of the Gosselin zone and approximately another 10,000 metres of diamond drilling to test other targets in the regional land position. Approximately 1,300 metres were completed in the third quarter (5,700 metres YTD).
An infill drilling program of 20,000 metres is ongoing on the Côté zone. Approximately 4,500 metres of surface diamond drilling were completed in the third quarter 2026 (14,900 metres YTD including approximately 1,200 metres of geotechnical drilling completed in the first quarter). The infill drilling program was planned to improve resource confidence within the northeastern extension of the Côté deposit and convert Inferred Resources into the Indicated Resources category.
| Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 | |||||||||
| Key Operating Statistics | ||||||||||||
| Underground lateral development (metres) | 1,132 | 837 | 3,525 | 2,965 | ||||||||
| Ore mined (000s t) - underground | 99 | 90 | 309 | 277 | ||||||||
| Ore mined (000s t) - open pit | 122 | 315 | 291 | 822 | ||||||||
| Ore mined (000s t) - total | 221 | 405 | 600 | 1,099 | ||||||||
| Grade mined (g/t) - underground | 8.09 | 6.42 | 8.77 | 6.67 | ||||||||
| Grade mined (g/t) - open pit | 1.13 | 0.99 | 0.97 | 1.11 | ||||||||
| Grade mined (g/t) - total | 4.24 | 2.19 | 4.98 | 2.51 | ||||||||
| Ore milled (000s t) | 309 | 250 | 899 | 855 | ||||||||
| Head grade (g/t) - underground | 8.00 | 6.52 | 8.76 | 6.75 | ||||||||
| Head grade (g/t) - open pit | 0.85 | 1.13 | 0.94 | 1.22 | ||||||||
| Head grade (g/t) - total | 3.06 | 3.04 | 3.61 | 3.00 | ||||||||
| Recovery (%) | 94 | 93 | 93 | 92 | ||||||||
| Gold production (000s oz) | 28.5 | 22.7 | 97.1 | 76.0 | ||||||||
| Gold sales (000s oz) | 28.3 | 20.7 | 95.0 | 76.5 | ||||||||
| Average realized gold price1 ($/oz) | $ | 4,244 | $ | 3,515 | $ | 4,552 | $ | 3,229 | ||||
| Financial Results ($ millions) | ||||||||||||
| Revenues | $ | 120.6 | $ | 72.8 | $ | 434.5 | $ | 248.0 | ||||
| Cost of sales2 | 51.4 | 40.0 | 147.4 | 127.2 | ||||||||
| Production costs | 51.8 | 44.8 | 153.3 | 132.2 | ||||||||
| (Increase)/decrease in finished goods | (0.4 | ) | (4.8 | ) | (5.9 | ) | (5.0 | ) | ||||
| Cash costs1 | 50.7 | 39.8 | 145.3 | 126.0 | ||||||||
| Sustaining capital expenditures1 | 8.3 | 17.7 | 41.6 | 48.8 | ||||||||
| Expansion capital expenditures1 | 5.3 | - | 12.0 | - | ||||||||
| Total sustaining and expansion capital expenditures1 | 13.6 | 17.7 | 53.6 | 48.8 | ||||||||
| Earnings from operations | 59.8 | 24.1 | 245.1 | 80.2 | ||||||||
| Mine-site free cash flow1 | 51.7 | 6.2 | 218.2 | 59.4 | ||||||||
| Unit costs per tonne1 | ||||||||||||
| Underground mining cost per tonne mined | $ | 321.58 | $ | 312.22 | $ | 307.23 | $ | 296.60 | ||||
| Open pit mining cost per operating tonne mined | $ | 10.32 | $ | 8.18 | $ | 10.31 | $ | 7.38 | ||||
| Milling cost per tonne milled | $ | 25.96 | $ | 36.43 | $ | 30.01 | $ | 27.94 | ||||
| G&A cost per tonne milled | $ | 18.11 | $ | 22.95 | $ | 18.30 | $ | 19.48 | ||||
| Operating costs per ounce3 | ||||||||||||
| Cost of sales excluding depreciation ($/oz sold) | $ | 1,817 | $ | 1,937 | $ | 1,552 | $ | 1,664 | ||||
| Cash costs1 ($/oz sold) | $ | 1,794 | $ | 1,924 | $ | 1,529 | $ | 1,648 | ||||
| AISC1 ($/oz sold) | $ | 2,118 | $ | 2,793 | $ | 1,980 | $ | 2,310 |
- This is a non-GAAP financial measure. See "Non-GAAP Financial Measures".
- Excludes depreciation - as disclosed in the segment note in the consolidated interim financial statements.
- Cost of sales, cash costs excluding royalties, cash costs and AISC per ounce sold may not be calculated based on amounts presented in this table due to rounding.
Operations
Westwood gold production in the third quarter 2026 was 28,500 ounces, higher by 5,800 ounces or 26% compared with the same prior year period.
Underground mining activity in the third quarter 2026 of 99,000 tonnes of ore was higher by 9,000 tonnes or 10% than the same prior year period, due to favourable stope sequencing and improved mining recovery. The grade of 8.09 g/t Au was higher than the prior period mainly due to mine sequencing and reduced dilution.
Open pit mining activity in the third quarter 2026 of 122,000 tonnes of ore was lower by 193,000 tonnes than the same prior year period primarily due to the continued focus this year on waste stripping activities as part of the mining sequence to open up access to ore.
Mill throughput in the third quarter 2026 was 309,000 tonnes, 59,000 tonnes higher than the prior year period due to an extended shutdown occurring in the prior year period, whereas the mill shutdown occurred in the second quarter 2026. The average grade of 3.06 g/t was 1% higher than the same prior year period due to a higher ratio of higher-grade underground ore to lower grade open pit ore.
The mill achieved recoveries of 94% in the third quarter 2026, slightly higher than the same prior year period.
During the quarter, the Westwood mill team identified gold-bearing sludge type material that had accumulated at the bottom of the pregnant solution tank in the electrowinning circuit. The material is believed to have accumulated over a number of years. The material has been recovered and placed in drums with a total combined weight of 14,700 kilograms. Samples, that are not statistically representative, indicated the solids content ranging from 19% to 27% and gold content in the solids ranging from 6% to 47%. For illustrative purposes, assuming an average for solids and an average for gold content, the sludge could contain approximately 30,000 ounces gold. This illustration is not an estimate of recoverable gold, payable gold, production or the financial benefit that may ultimately be realized by the Company. Furthermore, given the nature of the material, the collection process and the variability of assay results, the Company does not have a representative sample of the material as a whole. Accordingly, the illustrated estimate is subject to significant uncertainty, should not be regarded as a reliable estimate and the actual quantity of gold recovered may differ materially. The material needs to be processed by an external refinery, and the Company expects the gold ultimately recovered from the material to be reflected in its fourth quarter production results, subject to completion of the refining and assay process. There can be no assurance as to the quantity of gold that will ultimately be recovered or recognized, or the timing of such recovery or recognition.
Financial Performance - Q3 2026 Compared to Q3 2025
Production costs of
Cost of sales, excluding depreciation, of
Cash costs of
AISC per ounce sold of
Sustaining capital expenditures of
Mine-site free cash flow was
2026 Outlook
Westwood production is expected to be at the upper end of the guidance range of 110,000 to 130,000 ounces in 2026. The 2026 production outlook excludes any potential production from the gold-bearing sludge material discovered in the electrowinning pregnant solution tank at Westwood as described above. Underground mining is planned for between 900 to 1,000 tonnes per day, and the Grand Duc open pit life was extended into 2027 based on the improved economics in the current gold price environment. Mill throughput is expected to total 1.2 million tonnes in 2026 with blended head grades expected to average 3.5 g/t over the course of the year.
Cash costs at Westwood are expected to be in the range of
Sustaining capital expenditures guidance is
Expansion Opportunities
The Company plans to publish an updated technical report for Westwood in the second half of 2027 which is expected to highlight the potential for bulk mining in the eastern zone at depth in
| Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 | |||||||||
| Key Operating Statistics1 | ||||||||||||
| Ore mined (000s t) | 2,971 | 3,172 | 7,672 | 7,787 | ||||||||
| Grade mined (g/t) | 1.17 | 1.16 | 1.09 | 1.15 | ||||||||
| Operating waste mined (000s t) | 2,739 | 5,352 | 8,258 | 17,438 | ||||||||
| Capital waste mined (000s t) | 5,277 | 130 | 18,970 | 5,031 | ||||||||
| Total material mined (000s t) | 10,987 | 8,654 | 34,900 | 30,256 | ||||||||
| Strip ratio2 | 2.7 | 1.7 | 3.5 | 2.9 | ||||||||
| Ore milled (000s t) | 3,294 | 3,094 | 9,671 | 9,319 | ||||||||
| Head grade (g/t) | 1.18 | 1.18 | 1.18 | 1.06 | ||||||||
| Recovery (%) | 89 | 92 | 89 | 91 | ||||||||
| Gold production (000s oz) - 100% | 110.5 | 108.4 | 326.4 | 289.1 | ||||||||
| Gold production (000s oz) - attributable | 94.0 | 92.2 | 277.5 | 254.8 | ||||||||
| Gold sales (000s oz) - 100% | 112.4 | 105.9 | 330.3 | 286.4 | ||||||||
| Average realized gold price3 ($/oz) | $ | 4,255 | $ | 3,493 | $ | 4,509 | $ | 3,233 | ||||
| Financial Results1 ($ millions) | ||||||||||||
| Revenues | $ | 478.9 | $ | 370.3 | $ | 1,491.7 | $ | 926.8 | ||||
| Cost of sales4 | 180.7 | 184.2 | 552.8 | 491.2 | ||||||||
| Production costs | 123.8 | 149.0 | 377.5 | 413.6 | ||||||||
| (Increase)/decrease in finished goods | 2.8 | 1.5 | (0.2 | ) | (3.0 | ) | ||||||
| Royalties5 | 54.1 | 33.7 | 175.5 | 80.6 | ||||||||
| Cash costs3 | 180.2 | 183.9 | 550.6 | 490.3 | ||||||||
| Sustaining capital expenditures3 | 48.8 | 15.1 | 145.0 | 78.0 | ||||||||
| Expansion capital expenditures3 | 0.7 | 2.1 | 1.7 | 6.6 | ||||||||
| Total sustaining and expansion capital expenditures3 | 49.5 | 17.2 | 146.7 | 84.6 | ||||||||
| Earnings from operations | 229.2 | 134.7 | 754.3 | 311.1 | ||||||||
| Mine-site free cash flow3 | 271.1 | 150.5 | 735.9 | 225.9 | ||||||||
| Unit costs per tonne3 | ||||||||||||
| Open pit mining cost per operating tonne mined | $ | 5.44 | $ | 7.13 | $ | 5.00 | $ | 6.25 | ||||
| Milling cost per tonne milled | $ | 18.74 | $ | 21.83 | $ | 19.35 | $ | 19.84 | ||||
| G&A cost per tonne milled | $ | 9.14 | $ | 9.52 | $ | 9.99 | $ | 9.12 | ||||
| Operating costs per ounce6 | ||||||||||||
| Cost of sales excluding depreciation ($/oz sold) | $ | 1,608 | $ | 1,740 | $ | 1,674 | $ | 1,714 | ||||
| Cash costs3 - excluding royalties ($/oz sold) | $ | 1,122 | $ | 1,419 | $ | 1,136 | $ | 1,430 | ||||
| Cash costs3 ($/oz sold) | $ | 1,603 | $ | 1,737 | $ | 1,667 | $ | 1,711 | ||||
| AISC3 - excluding royalties ($/oz sold) | $ | 1,582 | $ | 1,596 | $ | 1,595 | $ | 1,704 | ||||
| AISC3 - including royalties ($/oz sold) | $ | 2,063 | $ | 1,914 | $ | 2,126 | $ | 1,985 |
- 100% basis, unless otherwise stated.
- Strip ratio is calculated as waste mined divided by ore mined.
- This is a non-GAAP financial measure. See "Non-GAAP Financial Measures".
- Excludes depreciation - as disclosed in the segment note in the consolidated interim financial statements.
- Includes contributions made by the Essakane mine to the development fund for local communities, equating to 1% of total revenues.
- Cost of sales, cash costs excluding royalties, cash costs and AISC per ounce sold may not be calculated based on amounts presented in this table due to rounding.
Operations
Essakane attributable gold production in the third quarter 2026 was 94,000 ounces (110,500 ounces | 100%), an increase of 1,800 ounces or 2% from the prior year:
Mining in the third quarter 2026 totaled 11.0 million tonnes, higher by 2.3 million tonnes or 27% compared to the same prior year period. Ore mined totaled 3.0 million tonnes in the quarter at an average grade of 1.17 g/t, a decrease of 6% and an increase of 1%, respectively over the same year prior period. Capital waste mined increased from the prior period as mining progressed to open up the Lao pit as per the mine plan.
Mill throughput in the third quarter 2026 was 3.3 million tonnes at an average head grade of 1.18 g/t, 6% higher and in line with the same prior year period, respectively.
The mill achieved recoveries of 89% in the third quarter 2026, 3% lower than the same prior year period, due to lower gravity circuit performance and higher concentrations of graphitic carbon and sulfur in the ore feed from direct feed material.
The security situation in
As at
The average royalty rate was 11% in the third quarter 2026 compared to 9% in the same prior year period, in addition to the contributions to the development fund for local communities equating to 1% of total revenues. The increase reflects the
On
Financial Performance - Q3 2026 Compared to Q3 2025
Production costs of
Cost of sales, excluding depreciation, of
Royalties were
Cash costs, excluding royalties, of
Cash costs, including royalties, of
AISC per ounce sold of
Total capitalized stripping of
Sustaining capital expenditures, excluding capitalized stripping, of
Mine-site free cash flow, on a 100% basis, was
2026 Outlook
Essakane attributable production is expected to be in the range of 340,000 to 380,000 ounces (400,000 to 440,000 ounces | 100%). Mining activities will predominantly target Phase 7 of the
Cash costs, excluding royalties, are expected to be in the range of
Essakane mainly relies on diesel and heavy fuel oil to power the processing plant and operate the mining fleet. The cost estimates for 2026 used an oil price assumption of
Sustaining capital expenditures guidance is expected to be
The Company plans to issue an updated technical report mid-2027. The report is expected to illustrate the potential extension of Essakane's mine life up to 2035 with additional phases in the Essakane pit and adjacent open pits.
Continued security incidents or related concerns could have a material adverse impact on future operating performance. The Company continues to actively work with authorities and suppliers to mitigate potential impacts and manage supply continuity, while also investing in additional infrastructure and supply inventory levels designed to secure operational continuity.
PROJECTS
On
The combined assets, together the "
On
The Company plans to issue an inaugural technical report for the
In
Nelligan
The Company holds a 100% interest in Nelligan located approximately 45 kilometres south of the Chapais Chibougamau area in
On
A diamond drilling program of 18,000 metres of expansion and delineation drilling was initially planned for 2026. This program has been expanded up to a total of 30,000 metres for year 2026. Approximately 9,700 metres were completed in the third quarter (24,800 metres YTD). The additional drilling is mainly dedicated to infill drilling for resources conversion.
The Company holds a 100% interest in the
On
A diamond drilling program of 15,000 metres was originally planned in 2026 to increase confidence in the existing resource and test at depth the Megane zone following positive results obtained from the 2025 drilling. This program has been expanded to a minimum of 20,000 metres. The depth extension requires further drilling to add to the current resource (see news release dated
Philibert
Following the acquisition of the remaining 25% interest in the Philibert property held by SOQUEM during the first quarter, the Company holds a 100% interest in the
A diamond drilling program of a minimum of 20,000 metres was originally planned and could increase to 30,000 metres depending on ground conditions. The drilling program aims primarily to convert a significant portion of the Inferred Resource to the Indicated Resource category, and where possible, exploration drilling could test other prospective targets on the project area. Approximately 8,700 metres were completed in the third quarter, (28,000 metres YTD) dedicated mostly to depth extensions of some of the zones.
Anik
A 1,600 metres diamond drilling program was planned in 2026 for testing different targets in the eastern continuation of the
Exploration
In the third quarter 2026, drilling activities on active projects and mine sites totaled approximately 56,600 metres (161,600 metres YTD). For additional information regarding the brownfield and greenfield exploration projects, see "Operations". The Company's exploration expenditures guidance for 2026 is
| ($ millions) | Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 | ||||||||
| Exploration projects - greenfield | $ | 3.7 | $ | 5.7 | $ | 27.8 | $ | 17.5 | ||||
| Exploration projects - brownfield1 | 4.3 | 3.4 | 9.1 | 10.4 | ||||||||
| Total - all operations | $ | 8.0 | $ | 9.1 | $ | 36.9 | $ | 27.9 |
- Exploration projects - brownfield for the third quarter 2026 included near-mine exploration and resource development of
$3.2 million (third quarter 2025 -$2.8 million ), and$7.7 million for YTD 2026 (YTD 2025 -$8.8 million ), which are capitalized.
FINANCIAL REVIEW
Liquidity and Capital Resources
The Company's capital allocation strategy is to maximize value through the allocation of internally generated cashflows to support its operations, fund growth opportunities, return capital to its shareholders, and strengthen its balance sheet. The Company's internally generated cashflows are conceptually differentiated by its Canadian operations and Essakane in
Cashflows from the Company's Canadian Operations are strategically allocated to support the funding of:
Sustaining and optimizing the Canadian portfolio to support stable, cash-generative performance.
The contemplated Côté Gold expansion to incorporate Gosselin.
The potential mine life extension of Westwood and underground expansion into the eastern zone.
The continued advancement of the Nelligan project.
The repurchase of 50% of the Côté Gold Gross Margin Royalty from
Franco-Nevada .Further strengthening its balance sheet.
The possible introduction of a dividend, which the Company is contemplating initiating in 2027.
Cashflows from Essakane (
As at
Within cash and cash equivalents,
$56.6 million (70% basis) was held by the Côté Gold UJV. The Côté Gold UJV requires its joint venture partners to fund, in advance, two months of future expenditures and cash calls are made at the beginning of each month, resulting in the month end cash balance approximating the following month's expenditure.$321.0 million was held by Essakane inBurkina Faso .$135.8 million was transferred to Canada subsequent to quarter end.
Restricted cash totaled
The Company's liquidity position and capital allocation decisions will ultimately be determined by the performance of the Company's operations, the price of gold, inflation expectations, currency exchange rates and the Company's ability to successfully repatriate excess cash from
The Company's liquidity position, comprised of cash and cash equivalents, short-term investments, and availability under the Credit Facility, together with expected cash flows from operations, is expected to be sufficient to support the Company's normal operating requirements, capital commitments, and service the debt obligations as they become due. The Company's ability to draw down on the Credit Facility is dependent on its ability to meet net debt to EBITDA and interest ratio covenants.
Readers are encouraged to read the "Caution Regarding Forward Looking Statements" and the "Risk Factors" sections contained in the Company's 2025 Annual Information Form, which is available on SEDAR+ at www.sedarplus.ca and the "Caution Regarding Forward Looking Statements" and "Risk and Uncertainties" section of this MD&A.
Dividend Payments from Essakane
Excess cash at Essakane is repatriated through dividends and a shareholder account structure as needed, of which the Company will receive its share based on its ownership, net of withholding taxes. The shareholder account structure functions like an inter-company loan and allows for the Company's portion of the dividend to be repaid using cash in excess of working capital requirements and aligns the interests of both
Essakane declared a record dividend of approximately
In
Share Buyback Program
During the third quarter 2026, the Company repurchased and cancelled approximately 7.6 million shares for approximately
The NCIB allows for the purchase of up to 57 million of its common shares over a twelve-month period, representing approximately 9.92% of
Subsequent to quarter end, the Company's Board of Directors authorized the Company to seek TSX approval for a new NCIB for a further 12 months period. Subject to TSX approval, the new NCIB would permit the Company to purchase up to approximately 10% of
All common shares purchased under the NCIB will be either cancelled or placed under trust to satisfy future obligations under the Company's share incentive plan. This initiative reflects management's confidence in the Company's long-term value and its commitment to disciplined capital allocation. The program is expected to continue to be funded from operating cash flows.
The Company has established an automatic share purchase plan in connection with its NCIB to facilitate the purchase of common shares during times when
The following table summarizes the carrying value of the Company's long-term debt1:
| ($ millions) | 2026 | 2025 | ||||
| Credit Facility | $ | - | $ | 200.0 | ||
| 5.75% senior notes ( | 449.2 | 448.8 | ||||
| Equipment loans | - | 1.0 | ||||
| $ | 449.2 | $ | 649.8 |
- Long-term debt does not include leases in place of
$99.5 million as atSeptember 30, 2026 (December 31, 2025 -$112.0 million ).
Credit Facility
The Company has a
On
Key terms have improved, with lower interest margins (1.875%-2.875% vs. 2.75%-3.75%), reduced standby fees, and more flexible covenant limits, including an increase of the net debt to EBITDA ratio to 4.0x from 3.5x.
Overall, the amendments reduce borrowing costs, enhance financial flexibility, and expand liquidity, positioning the Company to better support capital allocation and growth initiatives while reflecting a stronger balance sheet.
As at
The Credit Facility provides for an interest rate margin above the secured overnight financing rate (SOFR), banker's acceptance prime rate and base rate advances which vary, together with fees related thereto, according to the total net debt to EBITDA ratio of the Company. The Credit Facility is secured by certain of the Company's real assets, guarantees by certain of the Company's subsidiaries and pledges of shares of certain of the Company's subsidiaries. The key terms of the Credit Facility include certain limitations on incremental debt, certain restrictions on distributions and financial covenants, including net debt to EBITDA, Interest Coverage and a minimum liquidity requirement from
5.75% Senior notes
In
Term Loan
In
Leases
At
On
On
Certain pieces of mobile equipment at Côté Gold were delivered during the third quarter 2026.
Equipment loan
The Company had equipment loans with carrying value of
Gold prepay arrangements
In
Surety bonds and performance bonds
As at
As at
During the third quarter 2025, the Company increased the bonds required by
Income Statement
Revenues - Revenues were
Cost of sales - Cost of sales excluding depreciation was
Depreciation expense - Depreciation expense was
Exploration expense - Exploration expense was
General and administrative expense - General and administrative expense was
Income tax expense - Income tax expense was
Operating Activities
In the third quarter 2026, operating activities generated cash flow of
Investing Activities
Net cash used in investing activities for the third quarter 2026 was
Financing Activities
Net cash used in financing activities for the third quarter 2026 was
CONFERENCE CALL
A conference call will be held on
Pre-register via: Chorus Call IAMGOLD Q3 2026 Registration (recommended). Upon registering, you will receive a calendar booking by email with dial-in details and unique PIN. This process will bypass the operator and avoid the queue.
Toll free (
International: +1 (647) 846-8209
Webcast: https://event.choruscall.com/mediaframe/webcast.html?webcastid=JIn0jWrC
An online archive of the webcast will be available by accessing the Company's website at www.iamgold.com. A telephone replay will be available for one month following the call by dialing toll free 1 (855) 669-9658 within
For more information, refer to the Management Discussion and Analysis ("MD&A") and the unaudited consolidated Financial Statements for the three and nine months ended
ABOUT
IAMGOLD Contact Information
Tel: 416 360 4743 | Mobile: 416 388 6883
info@iamgold.com
End Notes (excluding tables) This is a non-GAAP financial measure. See "Non-GAAP Financial Measures" section below. Further information on these non-GAAP financial measures is included on pages 31 to 42 of the Company's Q3 2026 MD&A filed on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov.
NON-GAAP FINANCIAL MEASURES
The Company has included certain non-GAAP financial measures to supplement its consolidated interim financial statements, which are presented in accordance with IFRS, including the following:
Average realized gold price per ounce sold
Underground mining cost per ore tonne mined, open pit net mining cost per operating tonne mined, milling cost per tonne milled, and G&A cost per tonne milled
Cash costs excluding royalties, cash costs, cash costs per ounce sold, all in sustaining cost excluding royalties, all in sustaining cost and all in sustaining cost per ounce sold
Net earnings attributable to shareholders and adjusted net earnings attributable to shareholders
Net cash from operating activities, before movements in working capital and non-current ore stockpiles
Earnings before interest, income taxes, depreciation and amortization ("EBITDA")
Mine-site free cash flow
Sustaining and expansion capital expenditures
The Company believes that, in addition to conventional financial measures prepared in accordance with IFRS, these non-GAAP financial measures will provide investors with an improved ability to evaluate the underlying performance of the Company. Non-GAAP financial measures do not have any standardized meaning prescribed by IFRS, may not be comparable to similar measures presented by other companies and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.
Average Realized Gold Price per Ounce Sold
Average realized gold price per ounce sold is intended to enable management to understand the average realized price of gold sold in each reporting period after removing the impact of non-gold revenues and by-product credits, which, in the Company's case, are not significant, and to provide investors a clearer view of the Company's financial performance based on the average realized proceeds from gold sales in the reporting period.
| ($ millions, except where noted) | Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 | ||||||||
| Revenues | $ | 856.5 | $ | 706.7 | $ | 2,743.5 | $ | 1,764.7 | ||||
| By-product credits and other revenues | (1.6 | ) | (0.8 | ) | (5.7 | ) | (2.9 | ) | ||||
| Gold revenues | $ | 854.9 | $ | 705.9 | $ | 2,737.8 | $ | 1,761.8 | ||||
| Sales (000s oz) | 199.9 | 202.5 | 606.5 | 558.8 | ||||||||
| Average realized gold price per ounce1,2,3 ($/oz) | $ | 4,277 | $ | 3,492 | $ | 4,514 | $ | 3,153 |
- Average realized gold price per ounce sold may not be calculated based on amounts presented in this table due to rounding.
- Average realized gold price per ounce sold is calculated based on sales from the Company's Côté Gold mine at 70% and Westwood and Essakane mines at 100%.
- Average realized gold price per ounce sold for YTD 2025 includes 75,000 ounces at
$2,305 per ounce, as delivered into the Q1 2024 and Q2 2024 Prepay Arrangements. No deliveries were required in 2026 as the delivery obligations were fulfilled in H1 2025.
Underground
Underground mining cost per ore tonne mined and open pit net mining cost per operating tonne mined are defined as:
Mining costs (as included in production costs), that exclude capitalized waste stripping for open pit mines, less changes in stockpile balances and non-production costs as these costs are not directly related to tonnes mined, divided by
the sum of the tonnage of ore and operating waste mined.
Milling cost per tonne milled and general and administrative cost per tonne milled are defined as:
Mill and general and administrative costs (as included in production costs), excluding selling costs and non-production costs as these costs are not directly related to tonnes milled, divided by
the tonnage of ore milled.
Côté Gold (100% basis)
| ($ millions, except where noted) | Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 | ||||||||
| Production cost | $ | 111.8 | $ | 117.6 | $ | 341.6 | $ | 295.4 | ||||
| Adjust for: | ||||||||||||
| Increase/decrease in stockpiles | 9.0 | 14.5 | 21.5 | 29.8 | ||||||||
| Adj. operating cost | $ | 120.8 | $ | 132.1 | $ | 363.1 | $ | 325.2 | ||||
| Included in adjusted operating cost: | ||||||||||||
| Open pit net mining cost [A] | 42.0 | 47.9 | 121.3 | 113.5 | ||||||||
| Milling cost [B], net of capitalized operating cost | 54.5 | 65.7 | 172.0 | 157.7 | ||||||||
| G&A cost [C] | 24.3 | 18.5 | 69.8 | 54.0 | ||||||||
| Open pit ore tonnes mined (000s t) | 3,797 | 3,841 | 10,422 | 10,126 | ||||||||
| Open pit operating waste tonnes mined (000s t) | 5,008 | 6,770 | 14,811 | 18,275 | ||||||||
| Open pit ore and operating waste tonnes mined (000s t) [D] | 8,805 | 10,611 | 25,233 | 28,401 | ||||||||
| Ore milled (000s t) [E] | 2,879 | 2,988 | 8,093 | 8,015 | ||||||||
| Open pit net mining cost per operating tonne mined ($/tonne) [A/D] | $ | 4.77 | $ | 4.51 | $ | 4.81 | $ | 4.00 | ||||
| Milling cost per tonne milled ($/tonne) [B/E] | $ | 18.92 | $ | 22.01 | $ | 21.25 | $ | 19.68 | ||||
| G&A cost per tonne milled ($/tonne) [C/E] | $ | 8.45 | $ | 6.14 | $ | 8.62 | $ | 6.73 |
$/tonne may not re-calculate based on amounts presented in this table due to rounding.
Westwood
| ($ millions, except where noted) | Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 | ||||||||
| Production cost | $ | 51.8 | $ | 44.8 | $ | 153.3 | $ | 132.2 | ||||
| Adjust for: | ||||||||||||
| Increase/decrease in stockpiles | (0.8 | ) | 2.8 | (1.9 | ) | 4.5 | ||||||
| Adj. operating cost | $ | 51.0 | $ | 47.6 | $ | 151.4 | $ | 136.7 | ||||
| Consisting of: | ||||||||||||
| Underground mining cost [A] | 31.8 | 28.1 | 94.9 | 82.2 | ||||||||
| Open pit net mining cost [B] | 5.5 | 4.7 | 13.0 | 14.0 | ||||||||
| Milling cost [C] | 8.1 | 9.1 | 27.0 | 23.9 | ||||||||
| G&A cost [D] | 5.6 | 5.7 | 16.5 | 16.6 | ||||||||
| Underground ore tonnes mined (000s t) [E] | 99 | 90 | 309 | 277 | ||||||||
| Open pit ore tonnes mined (000s t) | 122 | 315 | 291 | 822 | ||||||||
| Open pit waste tonnes mined (000s t) | 412 | 261 | 970 | 1,073 | ||||||||
| Open pit ore and operating waste tonnes mined (000s t) [F] | 534 | 576 | 1,261 | 1,895 | ||||||||
| Ore milled (000s t) [G] | 309 | 250 | 899 | 855 | ||||||||
| Underground mining cost per ore tonne mined ($/tonne) [A/E] | $ | 321.58 | $ | 312.22 | $ | 307.23 | $ | 296.60 | ||||
| Open pit net mining cost per operating tonne mined ($/tonne) [B/F] | $ | 10.32 | $ | 8.18 | $ | 10.31 | $ | 7.38 | ||||
| Milling cost per tonne milled ($/tonne) [C/G] | $ | 25.96 | $ | 36.43 | $ | 30.01 | $ | 27.94 | ||||
| G&A cost per tonne milled ($/tonne) [D/G] | $ | 18.11 | $ | 22.95 | $ | 18.30 | $ | 19.48 |
$/tonne may not re-calculate based on amounts presented in this table due to rounding.
Essakane
| ($ millions, except where noted) | Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 | ||||||||
| Production cost | $ | 123.8 | $ | 149.0 | $ | 377.5 | $ | 413.6 | ||||
| Adjust for: | ||||||||||||
| Increase/decrease in stockpiles | (0.9 | ) | 8.8 | (14.0 | ) | 14.0 | ||||||
| Adj. operating cost | $ | 122.9 | $ | 157.8 | $ | 363.5 | $ | 427.6 | ||||
| Consisting of: | ||||||||||||
| Open pit net mining cost [A] | 31.1 | 60.8 | 79.7 | 157.7 | ||||||||
| Milling cost [B] | 61.8 | 67.5 | 187.1 | 184.8 | ||||||||
| G&A cost [C] | 30.0 | 29.5 | 96.7 | 85.1 | ||||||||
| Open pit ore tonnes mined (000s t) | 2,971 | 3,172 | 7,672 | 7,787 | ||||||||
| Open pit operating waste tonnes mined (000s t) | 2,739 | 5,352 | 8,258 | 17,438 | ||||||||
| Open pit ore and operating waste tonnes mined (000s t) [D] | 5,710 | 8,524 | 15,930 | 25,225 | ||||||||
| Ore milled (000s t) [E] | 3,294 | 3,094 | 9,671 | 9,319 | ||||||||
| Open pit net mining cost per operating tonne mined ($/tonne) [A/D] | $ | 5.44 | $ | 7.13 | $ | 5.00 | $ | 6.25 | ||||
| Milling cost per tonne milled ($/tonne) [B/E] | $ | 18.74 | $ | 21.83 | $ | 19.35 | $ | 19.84 | ||||
| G&A cost per tonne milled ($/tonne) [C/E] | $ | 9.14 | $ | 9.52 | $ | 9.99 | $ | 9.12 |
$/tonne may not re-calculate based on amounts presented in this table due to rounding.
Cash Costs Excluding Royalties, Cash Costs, Cash Costs per Ounce Sold, AISC and AISC per Ounce Sold
The Company reports cash costs excluding royalties, cash costs excluding royalties per ounce sold, cash costs, cash costs per ounce sold, AISC and AISC per ounce sold in order to provide investors with information about key measures used by management to monitor performance of mine sites in commercial production and its ability to generate positive cash flow.
Cash costs include mine-site operating costs such as mining, processing, administration, royalties, production taxes and realized derivative gains or losses, exclusive of depreciation, reclamation, capital expenditures and exploration and evaluation costs. AISC include cost of sales exclusive of depreciation expense, sustaining capital expenditures, which are required to maintain existing operations, capitalized exploration, sustaining lease principal payments, environmental rehabilitation accretion and amortization, by-product credits and corporate general and administrative costs. These costs are then divided by the Company's attributable gold ounces sold by mine sites in commercial production in the period to arrive at the cash costs excluding royalties per ounce sold, cash costs per ounce sold, and the AISC per ounce sold.
The following tables provide a reconciliation of cash costs excluding royalties, cash costs, AISC, cost of sales excluding depreciation per ounce sold, cash costs excluding royalties per ounce sold, cash costs per ounce sold and AISC per ounce sold on an attributable basis to cost of sales as per the consolidated interim financial statements.
Three months ended
| ($ millions, except where noted) | Côté Gold | Westwood | Essakane | Corporate | Total | |||||||||||
| Cost of sales1 | $ | 135.4 | $ | 65.8 | $ | 249.0 | $ | 0.3 | $ | 450.5 | ||||||
| Depreciation expense | (43.5 | ) | (14.4 | ) | (68.3 | ) | (0.3 | ) | (126.5 | ) | ||||||
| Cost of sales, excluding depreciation expense | $ | 91.9 | $ | 51.4 | $ | 180.7 | $ | - | $ | 324.0 | ||||||
| Royalties2 | (17.8 | ) | - | (54.1 | ) | - | (71.9 | ) | ||||||||
| Cost of sales, excluding depreciation expense and royalties | $ | 74.1 | $ | 51.4 | $ | 126.6 | $ | - | $ | 252.1 | ||||||
| Adjust for: | ||||||||||||||||
| By-product credit | (0.5 | ) | (0.7 | ) | (0.5 | ) | - | (1.7 | ) | |||||||
| Cost attributed to non-controlling interests3 | - | - | (27.0 | ) | - | (27.0 | ) | |||||||||
| Cash costs - attributable | $ | 91.4 | $ | 50.7 | $ | 153.2 | $ | - | $ | 295.3 | ||||||
| Adjust for: | ||||||||||||||||
| Sustaining capital expenditures4 | 29.3 | 8.6 | 50.0 | - | 87.9 | |||||||||||
| Corporate general and administrative costs5 | - | - | - | 21.1 | 21.1 | |||||||||||
| Other costs6 | 1.0 | 0.5 | 1.8 | (0.2 | ) | 3.1 | ||||||||||
| Cost attributable to non-controlling interests3 | - | - | (7.8 | ) | - | (7.8 | ) | |||||||||
| AISC - attributable | $ | 121.7 | $ | 59.8 | $ | 197.2 | $ | 20.9 | $ | 399.6 | ||||||
| Total gold sales (000 oz) - attributable | 59.2 | 28.3 | 95.6 | - | 183.1 | |||||||||||
| Cost of sales excluding depreciation7($/oz sold) - attributable | $ | 1,551 | $ | 1,817 | $ | 1,608 | $ | - | $ | 1,622 | ||||||
| Cash costs - excluding royalties7 ($/oz sold) - attributable | $ | 1,243 | $ | 1,794 | $ | 1,122 | $ | - | $ | 1,266 | ||||||
| Cash costs7 ($/oz sold) - attributable | $ | 1,544 | $ | 1,794 | $ | 1,603 | $ | - | $ | 1,614 | ||||||
| AISC7 - excluding royalties ($/oz sold) - attributable | $ | 1,755 | $ | 2,118 | $ | 1,582 | $ | 114 | $ | 1,836 | ||||||
| AISC7 all operations ($/oz sold) - attributable | $ | 2,056 | $ | 2,118 | $ | 2,063 | $ | 114 | $ | 2,184 |
- Excludes depreciation - as disclosed in the segment note in the consolidated interim financial statements.
- Includes contributions made by the Essakane mine to the development fund for local communities equating to 1% of total revenues.
- Adjustments for the consolidation of Essakane (85%) to its attributable portion of cost of sales.
- Sustaining capital expenditures are expenditures required to support current production levels at a mine site as further described below.
- Corporate general and administrative costs exclude one-time material severance charges.
- Other costs include sustaining lease principal payments and environmental rehabilitation accretion and amortization, partially offset by by-product credits.
- Cost of sales excluding depreciation per ounce sold, cash costs per ounce sold, and AISC per ounce sold may not be calculated based on amounts presented in this table due to rounding.
Three months ended
| ($ millions, except where noted) | Côté Gold | Westwood | Essakane | Corporate | Total | ||||||||||
| Cost of sales1 | $ | 147.7 | $ | 50.8 | $ | 235.0 | $ | 0.6 | $ | 434.1 | |||||
| Depreciation expense | (47.7 | ) | (10.8 | ) | (50.8 | ) | (0.6 | ) | (109.9 | ) | |||||
| Cost of sales, excluding depreciation expense | $ | 100.0 | $ | 40.0 | $ | 184.2 | $ | - | $ | 324.2 | |||||
| Royalties2 | (17.9 | ) | - | (33.7 | ) | - | (51.6 | ) | |||||||
| Cost of sales, excluding depreciation expense and royalties | $ | 82.1 | $ | 40.0 | $ | 150.5 | $ | - | $ | 272.6 | |||||
| Adjust for: | |||||||||||||||
| By-product credit | (0.2 | ) | (0.2 | ) | (0.3 | ) | - | (0.7 | ) | ||||||
| Cost attributed to non-controlling interests3 | - | - | (27.7 | ) | - | (27.7 | ) | ||||||||
| Cash costs - attributable | $ | 99.8 | $ | 39.8 | $ | 156.2 | $ | - | $ | 295.8 | |||||
| Adjust for: | |||||||||||||||
| Sustaining capital expenditures4 | 20.1 | 17.4 | 17.4 | (0.6 | ) | 54.3 | |||||||||
| Corporate general and administrative costs5 | - | - | - | 14.6 | 14.6 | ||||||||||
| Other costs6 | 0.6 | 0.5 | 1.4 | (0.1 | ) | 2.4 | |||||||||
| Cost attributable to non-controlling interests3 | - | - | (2.8 | ) | - | (2.8 | ) | ||||||||
| AISC - attributable | $ | 120.5 | $ | 57.7 | $ | 172.2 | $ | 13.9 | $ | 364.3 | |||||
| Total gold sales (000 oz) - attributable | 75.9 | 20.7 | 90.1 | - | 186.7 | ||||||||||
| Cost of sales excluding depreciation7 ($/oz sold) - attributable | $ | 1,323 | $ | 1,937 | $ | 1,740 | $ | - | $ | 1,593 | |||||
| Cash costs7 - excluding royalties ($/oz sold) - attributable | $ | 1,084 | $ | 1,924 | $ | 1,419 | $ | - | $ | 1,338 | |||||
| Cash costs7 ($/oz sold) - attributable | $ | 1,320 | $ | 1,924 | $ | 1,737 | $ | - | $ | 1,588 | |||||
| AISC7 - excluding royalties ($/oz sold) - attributable | $ | 1,358 | $ | 2,793 | $ | 1,596 | $ | 74 | $ | 1,706 | |||||
| AISC7 all operations ($/oz sold) - attributable | $ | 1,594 | $ | 2,793 | $ | 1,914 | $ | 74 | $ | 1,956 |
- Excludes depreciation - as disclosed in the segment note in the consolidated interim financial statements.
- Includes contributions made by the Essakane mine to the development fund for local communities equating to 1% of total revenues.
- Adjustments for the consolidation of Essakane (85%) to its attributable portion of cost of sales.
- Sustaining capital expenditures are expenditures required to support current production levels at a mine site as further described below.
- Corporate general and administrative costs exclude depreciation expense and one-time material severance charges.
- Other costs include sustaining lease principal payments and environmental rehabilitation accretion and amortization, partially offset by by-product credits.
- Cost of sales excluding depreciation per ounce sold, cash costs per ounce sold, and AISC per ounce sold may not be calculated based on amounts presented in this table due to rounding.
Sustaining and Expansion Capital Expenditures
Sustaining capital expenditures are expenditures required to support current production levels at a mine site and exclude all expenditures at the Company's development projects as well as certain expenditures at the Company's operating sites that are deemed expansionary in nature which result in a material increase in annual or life of mine gold ounce production, net present value, or reserves. The distinctions between sustaining and expansion capital used by the Company align with the guidelines set out by the
Reconciliation of incurred capital expenditure per the segmented note in the financial statements to incurred sustaining and expansion capital for the three months ended
| ($ millions, except where noted) | Sustaining | Expansion | Q3 2026 | Sustaining | Expansion | Q3 2025 | ||||||||||||
| Capital expenditures for property, plant and equipment | $ | 86.3 | $ | 23.4 | $ | 109.7 | $ | 59.9 | $ | 10.4 | $ | 70.3 | ||||||
| Côté Gold (IMG basis) | 29.1 | 17.4 | 46.5 | 27.7 | 8.3 | 36.0 | ||||||||||||
| Westwood | 8.3 | 5.3 | 13.6 | 17.7 | - | 17.7 | ||||||||||||
| Essakane | 48.8 | 0.7 | 49.5 | 15.1 | 2.1 | 17.2 | ||||||||||||
| Corporate | 0.1 | - | 0.1 | (0.6 | ) | - | (0.6 | ) |
Reconciliation of capital expenditure and exploration and evaluation expenditures per cash flow statement in the financial statements to cash payments for sustaining and expansion capital for the three months ended
| ($ millions, except where noted) | Sustaining | Expansion | Q3 2026 | Sustaining | Expansion | Q3 2025 | ||||||||||||
| Capital expenditures for property, plant and equipment | $ | 86.3 | $ | 23.4 | $ | 109.7 | $ | 59.9 | $ | 10.4 | $ | 70.3 | ||||||
| Working capital adjustments | 1.3 | (2.6 | ) | (1.3 | ) | (5.5 | ) | (2.5 | ) | (8.0 | ) | |||||||
| Capital expenditures per statement of cash flows | $ | 87.6 | $ | 20.8 | $ | 108.4 | $ | 54.4 | $ | 7.9 | $ | 62.3 | ||||||
| Côté Gold (IMG basis) | 29.1 | 14.7 | 43.8 | 20.1 | 5.8 | 25.9 | ||||||||||||
| Westwood | 8.4 | 5.4 | 13.8 | 17.4 | - | 17.4 | ||||||||||||
| Essakane | 50.0 | 0.7 | 50.7 | 17.3 | 2.1 | 19.4 | ||||||||||||
| Corporate | 0.1 | - | 0.1 | (0.4 | ) | - | (0.4 | ) |
EBITDA and Adjusted EBITDA
EBITDA (earnings before income taxes, depreciation and amortization and finance costs) is an indicator of the Company's ability to produce operating cash flow to fund working capital needs, service debt obligations and fund capital expenditures.
Adjusted EBITDA represents EBITDA excluding certain impacts such as changes in estimates of asset retirement obligations at closed sites, unrealized (gain) loss on non-hedge derivatives, impairment charges and reversal of impairment charges, write-down of assets and foreign exchange (gain) loss which are non-cash items and certain cash items that are non-recurring or temporary in nature as such items are not indicative of recurring operating performance. Management believes this additional information is useful to investors in understanding the Company's ability to generate operating cash flow by excluding from the calculation these non-cash amounts and cash amounts that are not indicative of the recurring performance of the underlying operations for the periods presented.
The following table provides a reconciliation of EBITDA and Adjusted EBITDA to the consolidated interim financial statements:
| ($ millions, except where noted) | Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 | ||||||||
| Earnings before income taxes | $ | 453.6 | $ | 199.6 | $ | 1,352.5 | $ | 450.1 | ||||
| Add: | ||||||||||||
| Depreciation | 126.5 | 109.9 | 360.8 | 284.6 | ||||||||
| Finance costs | 4.3 | 28.9 | 23.4 | 82.7 | ||||||||
| EBITDA | $ | 584.4 | $ | 338.4 | $ | 1,736.7 | $ | 817.4 | ||||
| Adjusting items: | ||||||||||||
| Unrealized (gain)/loss on non-hedge derivatives | - | 6.5 | - | 7.6 | ||||||||
| Impairment charge (reversal) | - | 12.2 | - | 12.2 | ||||||||
| Foreign exchange (gain)/loss | (7.7 | ) | 2.2 | (6.4 | ) | (1.1 | ) | |||||
| Gain on sale of Bambadji assets | (69.5 | ) | - | (69.5 | ) | - | ||||||
| Write-down of assets | - | 2.4 | 9.6 | 2.6 | ||||||||
| Changes in estimates of asset retirement obligations at closed sites | (5.7 | ) | (2.2 | ) | (6.4 | ) | 4.0 | |||||
| Fair value of deferred consideration from sale of Sadiola | (0.3 | ) | (0.5 | ) | (3.5 | ) | (1.5 | ) | ||||
| Gain on sale of royalties | - | - | - | (4.9 | ) | |||||||
| Severance costs | 0.6 | 0.2 | 0.7 | 4.0 | ||||||||
| Other | 2.1 | 0.3 | 16.3 | 0.1 | ||||||||
| Adjusted EBITDA | $ | 503.9 | $ | 359.5 | $ | 1,677.5 | $ | 840.4 |
Adjusted Net Earnings Attributable to Equity Holders
Adjusted net earnings attributable to equity holders represents net earnings attributable to equity holders excluding certain impacts, net of taxes, such as changes in estimates of asset retirement obligations at closed sites, unrealized (gain) loss on non-hedge derivatives and warrants, impairment charges and reversal of impairment charges, write-down of assets and foreign exchange (gain) loss which are non-cash items and certain cash items that are non-recurring or temporary in nature as such items are not indicative of recurring operating performance. This measure is not necessarily indicative of net earnings (loss) or cash flows as determined under IFRS. Management believes this measure better reflects the Company's performance for the current period and is a better indication of its expected performance in future periods. As such, the Company believes that this measure is useful to investors in assessing the Company's underlying performance.
The following table provides a reconciliation of earnings before income taxes and non-controlling interests as per the consolidated statements of earnings to adjusted net earnings attributable to equity holders of the Company.
| ($ millions, except where noted) | Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 | ||||||||
| Earnings before income taxes and non-controlling interests | $ | 453.6 | $ | 199.6 | $ | 1,352.5 | $ | 450.1 | ||||
| Adjusting items: | ||||||||||||
| Unrealized gain/(loss) on non-hedge derivatives | - | 6.5 | - | 7.6 | ||||||||
| Other finance costs | (2.2 | ) | 1.1 | 3.6 | 8.3 | |||||||
| Impairment charge (reversal) | - | 12.2 | - | 12.2 | ||||||||
| Foreign exchange (gain)/loss | (7.7 | ) | 2.2 | (6.4 | ) | (1.1 | ) | |||||
| Gain on sale of Bambadji assets | (69.5 | ) | - | (69.5 | ) | - | ||||||
| Write-down of assets | - | 2.4 | 9.6 | 2.6 | ||||||||
| Changes in estimates of asset retirement obligations at closed sites | (5.7 | ) | (2.2 | ) | (6.4 | ) | 4.0 | |||||
| Fair value of deferred consideration from sale of Sadiola | (0.3 | ) | (0.5 | ) | (3.5 | ) | (1.5 | ) | ||||
| Gain on sale of royalties | - | - | - | (4.9 | ) | |||||||
| Prepayment premium on second lien term loan | - | 4.0 | - | 4.0 | ||||||||
| Severance costs | 0.6 | 0.2 | 0.7 | 4.0 | ||||||||
| Other | 2.1 | 0.3 | 16.3 | 0.1 | ||||||||
| Adjusted earnings before income taxes and non-controlling interests | $ | 370.9 | $ | 225.8 | $ | 1,296.9 | $ | 485.4 | ||||
| Income taxes | (127.5 | ) | (44.4 | ) | (353.2 | ) | (162.5 | ) | ||||
| Tax on foreign exchange translation of deferred income tax balances | (0.6 | ) | 5.5 | - | 13.5 | |||||||
| Tax impact of adjusting items | 23.3 | (0.2 | ) | 18.1 | (3.2 | ) | ||||||
| Non-controlling interests | (29.1 | ) | (15.8 | ) | (92.1 | ) | (29.8 | ) | ||||
| Adjusted net earnings attributable to equity holders | $ | 237.0 | $ | 170.9 | $ | 869.7 | $ | 303.4 | ||||
| Adjusted net earnings per share attributable to equity holders | $ | 0.42 | $ | 0.30 | $ | 1.50 | $ | 0.53 | ||||
| Basic weighted average number of common shares outstanding (millions) | 570.4 | 575.2 | 578.6 | 574.3 |
The Company makes reference to net cash from operating activities before changes in working capital which is calculated as net cash from operating activities less working capital items and non-current ore stockpiles. Working capital can be volatile due to numerous factors, including a build-up or reduction of inventories. Management believes that this non-GAAP measure, which excludes these non-cash items, provides investors with the ability to better evaluate the operating cash flow performance of the Company.
The following table provides a reconciliation of net cash from operating activities before changes in working capital to net cash from operating activities:
| ($ millions, except where noted) | Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 | ||||||||
| Net cash from operating activities | $ | 461.1 | $ | 280.8 | $ | 1,476.1 | $ | 440.9 | ||||
| Adjusting items from working capital items and non-current ore stockpiles: | ||||||||||||
| Receivables and other current assets | (39.3 | ) | (18.3 | ) | (30.8 | ) | 29.3 | |||||
| Inventories and non-current ore stockpiles | 21.0 | 26.9 | 39.0 | 69.0 | ||||||||
| Accounts payable and accrued liabilities | (19.9 | ) | (8.8 | ) | 11.0 | (26.4 | ) | |||||
| Net cash from operating activities before changes in working capital | $ | 422.9 | $ | 280.6 | $ | 1,495.3 | $ | 512.8 |
Mine-Site Free Cash Flow
Mine-site free cash flow is calculated as cash flow from mine-site operating activities less capital expenditures from operating mine sites. The Company believes this measure is useful to investors in assessing the Company's ability to operate its mine sites without reliance on additional borrowing or usage of existing cash.
Three months ended
| ($ millions, except where noted) | Côté Gold | Westwood | Essakane | Corporate & other | Total | ||||||||||
| Net cash from operating activities | $ | 125.3 | $ | 65.5 | $ | 321.8 | $ | (51.5 | ) | $ | 461.1 | ||||
| Add: | |||||||||||||||
| Operating cash flow used by non-mine site activities | - | - | - | 51.5 | 51.5 | ||||||||||
| Cash flow from operating mine-sites | $ | 125.3 | $ | 65.5 | $ | 321.8 | $ | - | $ | 512.6 | |||||
| Capital expenditures | 43.8 | 13.8 | 50.7 | 0.1 | 108.4 | ||||||||||
| Less: | |||||||||||||||
| Capital expenditures from corporate and development projects | - | - | - | (0.1 | ) | (0.1 | ) | ||||||||
| Capital expenditures from operating mine-sites | 43.8 | 13.8 | 50.7 | - | 108.3 | ||||||||||
| Mine-site cash flow | $ | 81.5 | $ | 51.7 | $ | 271.1 | $ | - | $ | 404.3 |
Three months ended
| ($ millions, except where noted) | Côté Gold | Westwood | Essakane | Corporate & Other | Total | ||||||||||
| Net cash from operating activities | $ | 161.5 | $ | 23.6 | $ | 169.9 | $ | (74.2 | ) | $ | 280.8 | ||||
| Add: | |||||||||||||||
| Operating cash flow used by non-mine site activities | - | - | - | 74.2 | 74.2 | ||||||||||
| Cash flow from operating mine-sites | $ | 161.5 | $ | 23.6 | $ | 169.9 | $ | - | $ | 355.0 | |||||
| Capital expenditures | 25.9 | 17.4 | 19.4 | (0.4 | ) | 62.3 | |||||||||
| Less: | |||||||||||||||
| Capital expenditures from construction and development projects and corporate | - | - | - | 0.4 | 0.4 | ||||||||||
| Capital expenditures from operating mine-sites | 25.9 | 17.4 | 19.4 | - | 62.7 | ||||||||||
| Mine-site cash flow | $ | 135.6 | $ | 6.2 | $ | 150.5 | $ | - | $ | 292.3 |
Liquidity and
Liquidity is defined as cash and cash equivalents, short-term investments and the credit available under the Credit Facility. Net cash (debt) is calculated as cash, cash equivalents and short-term investments less long-term debt, lease liabilities and the drawn portion of the Credit Facility. The Company believes this measure provides investors with additional information regarding the liquidity position of the Company.
| ($ millions, except where noted) | 2026 | 2025 | ||||
| Cash and cash equivalents | $ | 766.6 | $ | 421.9 | ||
| Short-term investments | 1.0 | 1.0 | ||||
| Available Credit Facility | 845.8 | 445.7 | ||||
| Available Liquidity | $ | 1,613.4 | $ | 868.6 |
| ($ millions, except where noted) | 2026 | 2025 | ||||
| Cash and cash equivalents | $ | 766.6 | $ | 421.9 | ||
| Short-term investments | 1.0 | 1.0 | ||||
| Long-term debt1 | (450.0 | ) | (651.0 | ) | ||
| Net cash (debt) excluding lease liabilities and letters of credit | 317.6 | (228.1 | ) | |||
| Lease liabilities | (99.5 | ) | (112.0 | ) | ||
| Drawn letters of credit issued under Credit Facility | (4.2 | ) | (4.3 | ) | ||
| Net cash (debt) | $ | 213.9 | $ | (344.4 | ) |
- Includes principal amount of the Notes of
$450.0 million , Credit Facility of $nil and equipment loan of $nil (December 31, 2025 -$450.0 million ,$200.0 million , and$1.0 million , respectively). Excludes deferred transaction costs and embedded derivatives on the Notes.
CONSOLIDATED BALANCE SHEETS
| (Unaudited ) (In millions of | 2026 | |||||
| Assets | ||||||
| Current assets | ||||||
| Cash and cash equivalents | $ | 766.6 | $ | 421.9 | ||
| Receivables and other current assets | 55.6 | 79.6 | ||||
| Inventories | 379.9 | 377.0 | ||||
| Assets held for sale | 17.5 | 25.2 | ||||
| 1,219.6 | 903.7 | |||||
| Non-current assets | ||||||
| Property, plant and equipment | 4,134.3 | 4,162.8 | ||||
| Exploration and evaluation assets | 415.4 | 396.1 | ||||
| Restricted cash | 68.6 | 71.0 | ||||
| Inventories | 232.6 | 194.8 | ||||
| Deferred income tax assets | 18.2 | - | ||||
| Other assets | 106.2 | 124.1 | ||||
| 4,975.3 | 4,948.8 | |||||
| $ | 6,194.9 | $ | 5,852.5 | |||
| Liabilities and Equity | ||||||
| Current liabilities | ||||||
| Accounts payable and accrued liabilities | $ | 322.7 | $ | 329.1 | ||
| Income taxes payable | 128.2 | 99.6 | ||||
| Current portion of provisions | 15.9 | 5.1 | ||||
| Current portion of lease liabilities | 33.9 | 32.3 | ||||
| Current portion of long-term debt | - | 1.0 | ||||
| Other current liabilities | 5.1 | 50.0 | ||||
| 505.8 | 517.1 | |||||
| Non-current liabilities | ||||||
| Deferred income tax liabilities | 197.6 | 52.6 | ||||
| Provisions | 285.3 | 308.3 | ||||
| Lease liabilities | 65.6 | 79.7 | ||||
| Long-term debt | 449.2 | 648.8 | ||||
| Other liabilities | - | 0.1 | ||||
| 997.7 | 1,089.5 | |||||
| 1,503.5 | 1,606.6 | |||||
| Equity | ||||||
| Attributable to equity holders | ||||||
| Common shares | 3,240.8 | 3,383.8 | ||||
| Contributed surplus | (369.6 | ) | (27.4 | ) | ||
| Retained earnings | 1,779.8 | 872.6 | ||||
| Accumulated other comprehensive income (loss) | (32.2 | ) | (37.6 | ) | ||
| 4,618.8 | 4,191.4 | |||||
| Non-controlling interests | 72.6 | 54.5 | ||||
| 4,691.4 | 4,245.9 | |||||
| $ | 6,194.9 | $ | 5,852.5 |
Refer to Q3 2026 Financial Statements for accompanying notes.
CONSOLIDATED STATEMENTS OF EARNINGS
| (Unaudited) | Three months ended | Nine months ended | |||||||||||
| (In millions of | 2026 | 2025 | 2026 | 2025 | |||||||||
| Revenues | $ | 856.5 | $ | 706.7 | $ | 2,743.5 | $ | 1,764.7 | |||||
| Cost of sales | (450.5 | ) | (434.1 | ) | (1,351.7 | ) | (1,152.1 | ) | |||||
| Gross profit | 406.0 | 272.6 | 1,391.8 | 612.6 | |||||||||
| General and administrative expenses | (21.1 | ) | (14.6 | ) | (58.3 | ) | (43.5 | ) | |||||
| Exploration expenses | (8.4 | ) | (8.9 | ) | (24.0 | ) | (21.5 | ) | |||||
| Impairment charge, net | - | (12.2 | ) | - | (12.2 | ) | |||||||
| Other expenses | 2.1 | (1.9 | ) | (7.8 | ) | (9.7 | ) | ||||||
| Earnings from operations | 378.6 | 235.0 | 1,301.7 | 525.7 | |||||||||
| Gain on sale of Bambadji assets | 69.5 | - | 69.5 | - | |||||||||
| Finance costs | (4.3 | ) | (28.9 | ) | (23.4 | ) | (82.7 | ) | |||||
| Foreign exchange gain (loss) | 7.7 | (2.2 | ) | 6.4 | 1.1 | ||||||||
| Interest income, derivatives and other investment gains (losses) | 2.1 | (4.3 | ) | (1.7 | ) | 6.0 | |||||||
| Earnings before income taxes | 453.6 | 199.6 | 1,352.5 | 450.1 | |||||||||
| Income tax expense | (127.5 | ) | (44.4 | ) | (353.2 | ) | (162.5 | ) | |||||
| Net earnings | $ | 326.1 | $ | 155.2 | $ | 999.3 | $ | 287.6 | |||||
| Net earnings attributable to: | |||||||||||||
| Equity holders | $ | 297.0 | $ | 139.4 | $ | 907.2 | $ | 257.8 | |||||
| Non-controlling interests | 29.1 | 15.8 | 92.1 | 29.8 | |||||||||
| Net earnings | $ | 326.1 | $ | 155.2 | $ | 999.3 | $ | 287.6 | |||||
| Attributable to equity holders | |||||||||||||
| Weighted average number of common shares outstanding (in millions) | |||||||||||||
| Basic | 570.4 | 575.2 | 578.6 | 574.3 | |||||||||
| Diluted | 573.7 | 581.4 | 583.6 | 580.6 | |||||||||
| Basic earnings per share | $ | 0.52 | $ | 0.24 | $ | 1.57 | $ | 0.45 | |||||
| Diluted earnings per share | $ | 0.52 | $ | 0.24 | $ | 1.55 | $ | 0.44 | |||||
Refer to Q3 2026 Financial Statements for accompanying notes.
CONSOLIDATED STATEMENTS OF CASH FLOWS
| (Unaudited) | Three months ended | Nine months ended | |||||||||||
| (In millions of | 2026 | 2025 | 2026 | 2025 | |||||||||
| Operating activities | |||||||||||||
| Net earnings | $ | 326.1 | $ | 155.2 | $ | 999.3 | $ | 287.6 | |||||
| Adjustments for: | |||||||||||||
| Depreciation expense | 126.5 | 109.9 | 360.8 | 284.6 | |||||||||
| Impairment (reversal) charge | - | 12.2 | - | 12.2 | |||||||||
| Gain on sale of Bambadji assets | (69.5 | ) | - | (69.5 | ) | - | |||||||
| Deferred revenue recognized | - | - | - | (154.3 | ) | ||||||||
| Income tax expense | 127.5 | 44.4 | 353.2 | 162.5 | |||||||||
| Derivative loss | 4.0 | 6.7 | 10.1 | 9.8 | |||||||||
| Finance costs | 4.3 | 28.9 | 23.4 | 82.7 | |||||||||
| Other non-cash items | (7.6 | ) | (5.0 | ) | 19.1 | (11.3 | ) | ||||||
| Adjustments for cash items: | |||||||||||||
| Settlement of derivatives | (4.0 | ) | (0.3 | ) | (10.1 | ) | (2.3 | ) | |||||
| Disbursements related to asset retirement obligations | (0.8 | ) | (2.1 | ) | (2.6 | ) | (12.0 | ) | |||||
| Other | - | - | (3.9 | ) | - | ||||||||
| Movements in non-cash working capital items and non-current ore stockpiles | 38.2 | 0.2 | (19.2 | ) | (71.9 | ) | |||||||
| Cash from operating activities, before income taxes paid | 544.7 | 350.1 | 1,660.6 | 587.6 | |||||||||
| Income taxes paid | (83.6 | ) | (69.3 | ) | (184.5 | ) | (146.7 | ) | |||||
| Net cash from operating activities | 461.1 | 280.8 | 1,476.1 | 440.9 | |||||||||
| Investing activities | |||||||||||||
| Capital expenditures for property, plant and equipment | (103.0 | ) | (62.3 | ) | (320.2 | ) | (206.5 | ) | |||||
| Capitalized borrowing costs | (1.4 | ) | (7.3 | ) | (13.5 | ) | (23.7 | ) | |||||
| Proceeds from sale of Bambadji assets | 69.7 | - | 69.7 | - | |||||||||
| Other investing activities | (5.4 | ) | 0.8 | (2.4 | ) | 10.0 | |||||||
| Net cash used in investing activities | (40.1 | ) | (68.8 | ) | (266.4 | ) | (220.2 | ) | |||||
| Financing activities | |||||||||||||
| Repurchase of shares under the Normal Course Issuer Bid ("NCIB") | (134.7 | ) | - | (542.6 | ) | - | |||||||
| Proceeds from credit facility | - | - | - | 120.0 | |||||||||
| Repayment of credit facility | - | - | (200.0 | ) | (90.0 | ) | |||||||
| Repayment of second lien term loan | - | (100.0 | ) | - | (100.0 | ) | |||||||
| Dividends paid to non-controlling interests | - | - | (74.0 | ) | (128.3 | ) | |||||||
| Prepayment premium on second lien term loan | - | (4.0 | ) | - | (4.0 | ) | |||||||
| Interest paid | (0.1 | ) | (12.1 | ) | (7.7 | ) | (52.0 | ) | |||||
| Other financing activities | (13.6 | ) | (8.8 | ) | (21.0 | ) | (21.8 | ) | |||||
| Net cash used in financing activities | (148.4 | ) | (124.9 | ) | (845.3 | ) | (276.1 | ) | |||||
| Effects of exchange rate fluctuation on cash and cash equivalents | (7.4 | ) | 3.4 | (19.7 | ) | 22.2 | |||||||
| Increase (decrease) in cash and cash equivalents | 265.2 | 90.5 | 344.7 | (33.2 | ) | ||||||||
| Cash and cash equivalents, beginning of the period | 501.4 | 223.8 | 421.9 | 347.5 | |||||||||
| Cash and cash equivalents, end of the period | $ | 766.6 | $ | 314.3 | $ | 766.6 | $ | 314.3 | |||||
Refer to Q3 2026 Financial Statements for accompanying notes.
QUALIFIED PERSON AND TECHNICAL INFORMATION
The technical and scientific information relating to exploration activities disclosed in this document was prepared under the supervision of and verified and reviewed by
Data verification involves data input and review by senior project geologists at site, scheduled weekly and monthly reporting to senior exploration management and the completion of project site visits by senior exploration management to review the status of ongoing project activities and data underlying reported results. All drilling results for exploration projects or supporting resource and reserve estimates referenced in this news release have been previously reported in news release disclosures either by the Company or the project operator as the case may be (see referenced news releases) and have been prepared in accordance with NI 43-101. The sampling and assay data from drilling programs are monitored through the implementation of a quality assurance - quality control (QA-QC) program designed to follow industry best practices. Drill core (HQ and NQ size) samples are selected by the project geologists and sawn in half with a diamond saw at the project site. Half of the core is typically retained at the site for reference purposes. Generally, sample intervals are 1.0 to 1.5 metres in length, and reverse circulation holes are sampled at 1.0 metre intervals at the drill rig. Samples are prepared and analyzed at site for the Company's producing mines and at accredited regional laboratories for the Company's exploration projects, using analysis techniques such as standard fire assay with a 50 gram charge, fire assay with gravimetric finish, or LeachWELL rapid cyanide leach with fire assay with a 50 gram charge.
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION
All information included or incorporated by reference in this news release, including any information as to the Company's vision, strategy, future financial or operating performance and other statements that express management's expectations or estimates of future performance or impact, including statements in respect of the prospects and/or development of the Company's projects, other than statements of historical fact, constitutes forward-looking information or forward-looking statements within the meaning of applicable securities laws (collectively referred to herein as "forward-looking statements") and such forward-looking statements are based on expectations, estimates and projections as of the date of this news release. Forward-looking statements are generally identifiable by the use of words such as "may", "will", "should", "would", "could", "continue", "expect", "budget", "aim", "can", "focus", "forecast", "anticipate", "estimate", "maintain", "believe", "intend", "plan", "schedule", "guidance", "outlook", "potential", "seek", "targets", "cover", "strategy", "during", "ongoing", "subject to", "future", "objectives", "opportunities", "committed", "prospective", "likely", "progress", "strive", "sustain", "effort", "extend", "remain", "pursue", "predict", or "project" or the negative of these words or other variations on these words or comparable terminology.
In particular, forward-looking statements in this MD&A include, without limitation, those under the headings "About IAMGOLD", "Highlights", "Outlook", "Environmental, Social and Governance", "Operations", "Financial Condition" and "Quarterly Financial Review" and include, but are not limited to, statements with respect to: the estimation of mineral reserves and mineral resources and the realization of such estimates; operational and financial performance including the Company's guidance for and actual results of production, ESG performance, costs and capital and other expenditures such as exploration and including depreciation expense and effective tax rate; long-term value and capital allocation; the updated life-of-mine plan, ramp-up assumptions and other project metrics including operating costs, processing rates, throughput and operational optimization initiatives in respect of the Côté
The Company cautions the reader that forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, financial, operational and other risks, uncertainties, contingencies and other factors, including those described below, which could cause actual results, performance or achievements of the Company to be materially different from results, performance or achievements expressed or implied by such forward-looking statements and, as such, undue reliance must not be placed on them. Forward-looking statements are also based on numerous material factors and assumptions, including as described in this news release with respect to: the Company's present and future business strategies; operations performance within expected ranges; anticipated future production and cash flows; local and global economic conditions and the environment in which the Company will operate in the future; the price of precious metals, other minerals and key commodities; projected mineral grades; international exchanges rates; anticipated capital and operating costs; the availability and timing of required governmental and other approvals for the construction of the Company's projects.
Risks, uncertainties, contingencies and other factors that could cause actual results, performance or achievements of the Company to be materially different from results, performance or achievements expressed or implied by such forward-looking statements include, without limitation: the Company's business strategies and its ability to execute thereon; the development and execution of implementing strategies to meet the Company's sustainability vision and targets; security risks, including civil unrest, war or terrorism and disruptions to the Company's supply chain and transit routes as a result of such security risks, particularly in
Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise except as required by applicable law.