Q3 2026 San Albino Operational Highlights
- 42,565 tonnes mined, containing 10,913 ounces ("oz") of gold ("Au") at an average grade of 7.97 grams per tonne ("g/t") Au and 11,489 oz of silver ("Ag") at 8.40 g/t Ag
- 27,321 tonnes mined from diluted vein material containing 9,245 oz Au at 10.53 g/t Au and 9,690 oz Ag at 11.03 g/t Ag
- 15,244 tonnes mined from historical dump and other mineralized material above cutoff grade ("historical dump + other") containing 1,667 oz Au at 3.40 g/t Au and 1,799 oz Ag at 3.67 g/t Ag
- 40.7:1 strip ratio
- 53,046 tonnes milled containing 11,365 oz Au and 12,221 oz Ag grading 6.66 g/t Au and 7.17 g/t Ag, respectively
- 48% and 52% from diluted vein and historical dump and other, respectively
- 587 tonnes per day ("tpd") milled at 98% availability
- Mill recovery of 80.5% for gold
- At quarter-end, the stockpile was estimated at 109,868 tonnes at an average grade of 2.74 g/t Au for contained Au of 9,666 oz
Q3 2026 Mako Financial Highlights
- Mako total gold recovered of 12,743 oz Au (sales of 11,581 oz Au) for total revenue of
~$50 million in Q3 2026- San Albino gold recovered of 9,145 oz Au (sales of 8,768 oz Au at
$4,285 (1) per ounce) Moss Mine gold recovered of 3,599 (sales of 2,812 oz Au at$4,343 per ounce)
- San Albino gold recovered of 9,145 oz Au (sales of 8,768 oz Au at
- Cash, securities and trade receivables of
$119.3 million as ofSeptember 30, 2026 - Delivered 894 oz Au in connection with gold stream related to the purchase of the
Mt. Hamilton Project
(1) Gold Price before Sailfish Adjustments. For the purpose of calculating revenue, payments to Sailfish are deducted from the Average Realized Price Gold.
Table 1 - Operating Results San Albino and Moss

Table 2 - Detailed Operating Results for San Albino

* Includes historical dump, hanging wall, footwall, historical muck and all other non-vein mineralized material above cutoff grade.
** Average realized gold price per ounce sold is calculated by dividing total gold revenue by the total gold ounces sold into the spot market and before deductions from Sailfish. For the purpose of calculating revenue, payments to Sailfish are deducted from the Average Realized Price Gold
(1) Strip Ratio calculation does not include waste material that is capitalized
Table 3 - San Albino Quarter-End Stockpile Statistics

** Includes historical dump, hanging wall, footwall, historical muck and all other non-vein mineralized material above cutoff grade.
San Albino
During Q3 2026, San Albino processed 53,046 tonnes of mineralized material at an average gold grade of 6.66 g/t, achieving gold recoveries of 80.5% and producing 9,145 ounces of recovered gold. The mine sold 8,768 ounces of gold at an average realized price of
In
In Q3 2026,
During Q3 2026, crushing plant throughput averaged 5,113 short tons per day, below the 8,500 short tons per day initial throughput for 2026-2027 (ramping to 10,000 short tons per day in 2028-2030 and 14,000 short tons per day beginning in 2031) described in the NI 43-101 Technical Report for the Mineral Resources, Mineral Reserves and Mine Plan for the
Building on these operational improvements, the Company has procured a significant crushing circuit upgrade, including additional crushing and screening capacity, conveyor modifications, and supporting electrical infrastructure. Together with the improvements already implemented, this upgrade is expected to increase crushing plant throughput to more than 12,000 short tons per day by Q3 2027, substantially exceeding both the 8,500 short tons per day outlined in the Technical Report and the 5,113 short tons per day achieved in Q3 2026. The anticipated increase in throughput, combined with expected improvements in head grades as the Company begins accessing higher-grade material from the
On
Long lead items for the Mt. Hamilton construction project, including the crusher and overland conveyor, will be procured later this month. First gold pour is anticipated in
During Q3 2026, exploration and technical activities accelerated significantly following the mobilization of a contractor drill rig and the onset of the dry season. A total of 54 drill holes totaling 4,467 meters were completed during the quarter, compared to 45 holes totaling 2,253 meters during the first six months of 2026. Q3 drilling included 185 meters of geotechnical drilling, 2,001 meters of metallurgical drilling, and 2,281 meters of infill and exploration drilling. These activities support ongoing engineering, resource evaluation, and project development planning.
On
In early October the Guyana EPA provided their comments on the draft Environmental and Social Impact Assessment (ESIA), identifying areas requiring additional detail or clarification. The Company and lead ESIA consultants expect to submit the final ESIA in the fourth quarter of 2026 with approval shortly thereafter.
Pre-development activities continued during Q3 2026, including the completion of bridge surveys, site preparation, and construction-readiness planning. The Company also entered into a contract for upgrades to the camp access road, with work scheduled to commence in
On behalf of the Board,
Chief Executive Officer
For the latest details, please refer to the unaudited condensed interim consolidated financial statements and the associated management's discussion and analysis for the six months ended
Non-GAAP Measures
The Company has included certain non-GAAP financial measures and non-GAAP ratios in this press release such as Average realized gold price per ounce sold. These non-GAAP measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. In the gold mining industry, these are commonly used performance measures and ratios, but do not have any standardized meaning prescribed under IFRS and therefore may not be comparable to other issuers. The Company believes that, in addition to conventional measures prepared in accordance with IFRS, certain investors use this information to evaluate the Company's underlying performance of its core operations and its ability to generate cash flow.
"Average realized gold price per ounce sold" is calculated by dividing total gold revenue by the total gold ounces sold into the spot market before deductions from Sailfish.
Qualified Person
John Rust, a metallurgical engineer and qualified person (as defined under NI 43-101) has read and approved the technical information contained in this press release. Mr. Rust is a senior metallurgist and a consultant to the Company.
About Mako
Mako Mining Corp. is a publicly listed gold mining, development and exploration company. The Company operates the high-grade San Albino gold mine in Nueva Segovia, Nicaragua, which ranks as one of the highest-grade open pit gold mines globally and offers district-scale exploration potential. Mako also owns two assets in the US: the Moss Mine in Arizona, an open pit gold mine in northwestern Arizona and the Mt. Hamilton Project, a heap leach project in Nevada. Mako also holds a 100% interest in the PEA-stage Eagle Mountain Project in Guyana, South America. Eagle Mountain is the subject of engineering, environmental and mine permitting activity.
For further information: Mako Mining Corp., Akiba Leisman, Chief Executive Officer, Telephone: 917-558-5289, E-mail: aleisman@makominingcorp.com or visit our website at www.makominingcorp.com and SEDAR www.sedarplus.ca.
Forward-Looking Information: Statements contained herein, other than historical fact, may be considered "forward-looking information" within the meaning of applicable securities laws. The forward-looking information contained herein is based on the Company's plans and expectations and assumptions as of the date of this news release. Such statements forward looking statements include: expectations stated regarding Q3 2026 production at San Albino and financial highlights for the Company, expected timing for development activities at Eagle Mountain and ramp up activities at the Moss Mine and construction plans at Mt. Hamilton. Such forward-looking information is subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking information, including, without limitation, uncertainty related to mining exploration and development activities and shifts in the timing thereof; political risks and uncertainties involving the Company's mineral properties; the inherent uncertainty of cost estimates and the potential for unexpected costs and expense; commodity price fluctuations and other risks and uncertainties as disclosed in the Company's public disclosure filings on SEDAR+ at www.sedarplus.ca and EDGAR at www.sec.gov. Such information contained herein represents management's best judgment as of the date hereof, based on information currently available and is included for the purposes of providing investors with the Company's expectations regarding the Company's Q3 2026 production and operating results at San Albino gold project, financial highlights for Q3 2026 and current corporate updates, and may not be appropriate for other purposes. Mako does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
Cautionary Note to U.S. Investors Regarding Mineral Disclosure
NI 43-101 is a rule of the Canadian Securities Administrators which establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Technical disclosure contained in this news release has been prepared in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum Classification System. These standards differ from the requirements of the U.S. Securities and Exchange Commission ("SEC") and resource information contained in this news release may not be comparable to similar information disclosed by domestic United States companies subject to the SEC's reporting and disclosure requirements.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SOURCE: Mako Mining Corp.
View the original press release on ACCESS Newswire