“Sinda is laying the foundations for a world-class silver-gold mine, with the third quarter bringing excellent progress in drilling, exploration and site preparation,” said
Third Quarter 2026 Highlights
Operational Highlights
- Launched earthworks in September, an important milestone in preparing for underground development. Work included preparing the exploration decline portal and the Waste Rock Storage Facility (WRSF), with approximately 6,500 cubic meters of material moved during the quarter.
- Advanced Phase 2 drilling, deploying 18 rigs and completing approximately 31,150 meters in the third quarter 2026, with work focused on resource conversion at Caracol, infill drilling at Agaves and exploration along the Don Diego corridor and other priority targets.
- Achieved the highest-grade drill intercept to date at Caracol: 3.05 m grading 12,494 g/t silver-equivalent (AgEq), including 0.65 m at 24,548 g/t AgEq1.
- Identified, through initial drilling at Don Diego, a possible structural link between Caracol and Agaves, pointing to broader exploration potential across Sinda’s land package in the prolific
Guanajuato Mining District . - Maintained a record of more than 501,480 work hours without lost-time incidents, recordable injuries, or disabling accidents, achieving a Total Recordable Injury Frequency Rate (TRIFR) of 0.00 and demonstrating strong occupational health and safety performance.
- Upheld strong community relations and operational stability through regular dialogue and local outreach initiatives, including specialized upskilling training for more than 1,500 women.
- Continued to deliver an excellent environmental record through the quarter, reflecting Sinda’s ongoing commitment to responsible environmental practices.
1 Silver-equivalent calculations assumed a silver price of
Corporate Highlights
- Added to the VanEck Junior Gold Miners ETF (NYSE Arca: GDXJ), effective
September 18, 2026 . - Listed on the International Quotation System (SIC) of the
Mexican Stock Exchange onSeptember 28, 2026 , allowing Mexican institutional and retail investors to tradeSinda shares locally. - Further strengthened the Board of Directors with the appointment of
Alberto Zinser , a seasoned Mexican legal and business leader, effectiveOctober 12, 2026 .
Upcoming Milestones
- Phase 2 drilling continues with a total of 122,000 meters currently planned. The assay results will be released as they are received, analyzed, and confirmed by the Company.
- Site preparation is on track for completion during the fourth quarter 2026, paving the way for construction of the exploration decline. This marks a key step forward in the development of the project, bringing the Company closer to establishing underground access and accelerating the next phase of Caracol.
- Updated Mineral Resource Estimate (“MRE”) targeted for completion by year-end 2026.
Sinda Project Update
The project is a world-class silver-gold deposit located approximately 35 kilometers from
On
In the second quarter of 2026, the Company completed the Phase 1 surface drilling program, totaling 60,810 meters. Approximately 55% of the program, equivalent to 33,134 meters, focused on infill drilling at the
The Don Diego corridor lies between the Caracol and Agaves areas, where the Company has identified a potential structural link between the two mineralized zones.
On
Key Phase 1 Drilling Program Results
- Drill hole CEAG-26-062, which intercepted approximately 3.0 meters grading approximately 727 g/t AgEq, including 0.5 meters grading over 3,200 g/t AgEq
- Drill hole CEAG-26-063, which intercepted a broader interval of 7.95 meters grading 462 g/t AgEq
- Drill hole CECA-26-030-A, which returned 0.5 meters grading 14,114 g/t AgEq
- Drill hole CEAG-26-065, which intercepted 1.05 meters grading 2,826 g/t AgEq
- Drill hole CECA-25-027-C, which returned 0.5 meters grading 10,569 g/t AgEq
- Drill hole CECA-26-033-B, which returned 0.6 meters grading 8,376 g/t AgEq
The Phase 2 drilling program commenced on
Exploration Decline and
Underground drilling, comprising approximately 223,000 meters across 557 planned holes with a budget of approximately
Liquidity and Capital Resources
As of
Sinda’s unaudited financial statements and quarterly report on Form 10-Q will be available on the Company’s website at https://investors.sinda.mx/.
Qualified Person
All scientific and technical information in this release has been approved and verified by
About Sinda Ltd.
Sinda is a silver-gold exploration and development company with mineral projects in Mexico, featuring an estimated 369 million AgEq ounces of Inferred Mineral Resources and 16 million AgEq ounces of Indicated Mineral Resources, plus incremental Exploration Targets of 452 – 484 million AgEq ounces. Backed by experienced mining investors and a management team with deep Mexican operating experience, Sinda expects to execute an aggressive exploration and drilling program, and to construct its underground decline enroute to commercial production.
Cautionary Note Regarding Forward Looking Statements
This news release contains forward-looking statements, including statements regarding the Company’s future liquidity position and business strategy, the Company’s plans and objectives for future operations and industry trends. These statements are not historical facts but rather are based on the Company’s current expectations and projections regarding its business, operations and other factors relating thereto. Words such as “may,” “might,” “could,” “would,” “achieve,” “budget,” “scheduled,” “forecasts,” “target”, “should,” “expects,” “plans,” “anticipates,” “believes,” “estimates,” “predicts,” “potential” or “continue” and similar expressions are used to identify these forward-looking statements. All forward-looking statements speak only as of the date on which they are made. These statements are not guarantees of future performance and involve certain risks, uncertainties and assumptions concerning future events that are difficult to predict. Therefore, actual future events or results may differ materially from these statements. We caution you not to place undue reliance on these forward-looking statements.
View source version on businesswire.com: https://www.businesswire.com/news/home/20261101547063/en/
For additional information please contact:
Alvaro Gomez
Vice President, Corporate Development and Investor Relations
Investor relations: ir@sinda.mx
Media: media@sinda.mx
Source: Sinda Ltd.