Conference Operator
Operator
Good day and thank you for standing by. Welcome to the GOLA LNG Limited 3Q2026 Conference Call. At this time, all participants are in a listen-only mode. After the speaker's presentation, there will be a question and answer session. To ask a question during the session, you will need to press star 1, 1 on your telephone. You will then hear an automated message advising your hand is raised. To withdraw your question, please press star 1 1 again. Please be advised that today's conference is being recorded. I would now like to hand the conference over to your speaker today, Karl Fredrik Staubo, CEO. Please go ahead.
Karl Fredrik Staubo
Chief Executive Officer
Thank you, operator, and welcome to GOLAR LNG's Q3 2026 earnings presentation. My name is Karl Fredrik Staubo, and I'm accompanied today by our CFO, Eduardo Maranhao, to present this quarter's results. Before we get into the presentation, please note the forward-looking statements on slide two, and let's start on slide three and an overview of GOLAR today. GOLAR owns four FLNGs. Right today, the only operational FLNG is the GIMI, which continued its strong operational performance during the quarter, where she overproduced against the contractual amounts. Hilly completed her eight-year contract in late July and left Cameroon and is now sitting in a dry dock at Seatrim Shipyard in Singapore in preparation for her 20-year contract in Argentina, which starts up mid-next year. The modifications work continue on time and on budget. The Esperanza is under construction at CMC Raffles Shipyard in Yantai, China and is also on time and budget to complete construction by year end 27 and for her contract startup mid-2028. During the quarter we made a final investment decision for our fourth FL&E. This fourth unit will deliver within 2029 and is the earliest available liquefaction capacity globally. During the quarter, we acquired a donor vessel for this conversion, a vessel named the Grace Dahlia, which is one of the world's largest MOS LNG carriers. The larger storage capacity of Grace Dahlia compared to the Esperanza will provide prospective charters with additional operational flexibility. Q3 was also an active quarter for new financing facilities on the back of the committed growth capex and strong EBITDA backlog. During the quarter, we added approximately $1.6 billion in additional liquidity through three different financing facilities. Following these initiatives, our current available liquidity spans at $2.3 billion. Our backlog remains at 17 billion before securing a charter on unit number 4. Our contracted run rate EBITDA is 800 million, increasing to above 1.2 billion once a charter for FLNG 4 has been secured. Turning to slide 4, you see a brief overview of our contract backlog, where all Healy, Gimli and Esperanza has long-term 20-hour charters. We are in significant detailed discussions for a contract on unit number four, where we're targeting a similar contract term to that of the other three. Turning to slide six, and a Q3 business update. During the quarter, Hille concluded her contract for Perenco in Cameroon, and sailed to Citroën. During the contract, the unit delivered 156 cargoes through the eight-year period, and 100% economic uptime during the whole contract. As mentioned during the quarter, Gimmi sustained her excellent operational performance where we produced 3% above the contractual day rate despite higher ambient temperature during summer months and scheduled maintenance during the quarter. We have now completed the 50th cargo for her. The Esperanza is now joined into one single vessel. and the unit is on time on budget for year-end 27 delivery. For number four, we FID the vessel as mentioned and acquire the Grace Dahlia. The Dahlia arrived at the shipyard last week. During the quarter, we added $1.6 billion of additional liquidity through three different facilities. We signed a $600 million revolving credit facility with a consortium of commercial banks. We priced a $500 million senior unsecured bond in October, and this morning we signed an expansion of the existing sale leaseback facility on the Hilly, releasing approximately half a billion dollars in additional liquidity. We continue to progress FLNG commercial prospects, and based on the strong demand that we observe, we have also reserved long lead items for a potential fifth FLNG unit. We'll now turn to slide seven and a snapshot of Hilly. As explained already, and as you can see from the picture, Hilly has left Cameroon and is now pulled into a dry dock at C3M Shipyard. The modification work is going according to plan, on time and on budget, and we expect to arrive in Argentina mid-2027 to start a 20-year contract. The annual EBITDA contribution from that unit once operational in Argentina will be $285 million before commodity upside and inflationary adjustments, bringing her EBITDA backlog to $5.7 billion. As already explained, we signed an agreement to amend and extend the existing financing facility of Hilly, increasing the principal to $960 million. The drawdown of the incremental amount is expected within Q4. As part of the agreement with the sale leaseback counterpart, there is a phased additional drawdown bringing the facility up to $1.2 billion. with two consecutive drawdowns, one to occur in 27 and one in 28. The reason for the phase drawdown is to optimize our capital structure whilst reducing negative carry in the period. Turning to slide eight and focus on GIMI. GIMI continues to produce above contractual levels and year to date we have invoiced 12% above the contractual amount. To remind you, the earnings from the unit is pro-rata adjusted to any overproduction or underproduction for that matter. Hence, we invoice 12% more than our base EBITDA for our proportional share, which is 151. Hence, it's 12% above that. During the quarter, the overproduction was 3%, impacted by warmer ambient temperature during summer months in Mauritania and Senegal. and also due to scheduled maintenance. We do expect a higher overproduction for Q4 based on colder ambient temperature and less scheduled maintenance. We continue to work with the DTA partners to identify value enhancing initiatives for the project, including operational efficiencies, debottlenecking and OPEX reduction across the project. Turning to slide nine and a focus on Esperanza. As you can see from the bottom pictures, this explains what's happened since we ordered the vessel and some of the key engineering feeds of this unit. In contrast to our two existing FLNGs, where the liquefaction plant and supporting systems are added to the width of the vessels through sponsons, We are for the Mark 2 construction design. We are splitting an existing ship in the middle. We're building a brand new midsection housing the liquefaction plant. And we then connect the aft and the front of the ship to the new liquefaction plant for storage. So as you can see on the bottom half of this slide, the vessel arrived to the shipyard. In the middle picture, you can see that we've cut the unit in half. And now during the quarter, we are now connected into one ship again, where the new midsection is placed in between the front and the aft of the ship. The unit remains on schedule and on budget to depart CMC Raffles in Q4 27. To date, the conversion project has worked more than 20 million man hours without any lost time incidents. To date we've spent 1.4 billion dollars fully equity funded by Golar. During the quarter we find a 600 million dollar RCF secured against the project and we are advancing long-term financing for the unit. Turning to slide 10, in Argentina there is Significant infrastructure required to facilitate for the production of Hille and Esperanza. This infrastructure is the responsibility of CESA, where Golar is a 10% shareholder. We are pleased to see that all the infrastructure is being developed on time and on budget. Some of the pictures here highlight some of the key infrastructure, including a pipeline connecting to the existing grid, a designated pipeline from the Vaca Marta to go for San Matias. On the top right, you can see our mooring system in yellow, and then the dredging and trenching activities offshore to connect the pipelines to the location of the FLNG. All regulatory milestones have been achieved, including re-qualification of our mental impact assessment from the provinces of New Can and Rio Negro. CESA has also secured offtake agreements for the volumes to be produced in Argentina. The first two million tons have been sold to Securing Energy for Europe, and CESA is in very advanced discussions to sell the next 3 million tons of production. We expect that to conclude within Q1 of next year. Turning to slide 11 and unit number four. During the quarter, we signed with CMC Shipyard in Yantai the same shipyard that is constructing the Esperanza for our fourth unit and the second Mark II 3.5 MTPA FLNG. The unit will deliver by year end 29, which is the earliest liquefaction capacity globally. The delivery should have a two to three year advantage of any alternative liquefaction capacity. And the reason for this earlier delivery is that we have secured long lead items and an attractive yard slot. The capex for the unit is estimated to 2.45 billion, and as already explained, we acquired a donor vessel which has now arrived in Yantai, China as of last week. We expect significant synergies from building two vessels with similar design at the same shipyard with overlapping work streams. We are now in advanced discussions for long-term employment of the unit, and we are pleased with the progress of such discussions. Turning to slide 12, there is significant accretion potential once the contract for unit number four is secured. If we contract in line with the contract terms of Esperanza, we will see a 50% earnings increase. We expect to further diversify our backlog We see this as a replicable model and we have during the quarter secured long lead items for unit number five. And we expect that the position as the earliest available liquefaction capacity globally in a world where there's an increasing focus on energy security and diversification to continue to drive demand both for unit number four, five and beyond. Turning to slide 13, we see a strong momentum behind the FLNG build-out. As explained on numerous quarterly calls and presentations in the past, we see a similar development to that of the FPSO industry. The FPSO industry started in 1985 and today comprise 250 units. The FLNG industry started in 2018 and today comprise 15 units. With what we see in the market today, we expect another three FIDs of FLNGs within this year. That is putting significant pressure both on long lead items and yard capacity for incremental units. Golar has secured both long lead items and yard slots. That will be highly competitive to any alternatives in the market. The reason for the build-out both of FPSOs and FLNGs are very similar. It's a capital efficient alternative with lower exposure to onshore risks. The flexibility of a floating platform and the cost competitiveness of construction versus land-based alternatives makes the FLNG developments in many cases more economic than land-based alternatives. In addition to that, we see increased concentration of global LNG supply. By 2031, 53% of global supplies will be from the US and Qatar. We see an increasing demand from off-takers to diversify that supply, and that's furthermore supported by the off-take interest that we saw for SESA volumes once marketed earlier this year. We have more than 25 off-takers interested in taking that volume. And as explained, Golire is ready to deliver into this demand, first and foremost with the earliest available FLNG globally in unit number four, with the shipyard capacity we have secured and the long lead items for unit number five. Turning to slide 14 and elaborating on this development, we have built FLNGs at two shipyards. Mark 2s at CMC Raffles in Yantai, China, and Mark 1s at Citrium in Singapore. We continue to develop the very strong relationship we have with both shipyards, and we have secured options for additional units at CMC. During the quarter, we also signed an LOI with Citrium, to secure a yard slot for incremental units, and we are advancing engineering designs to be able to build both Mark 1s and Mark 2s at Seatriff. As already explained during the call, we secured slots for our fifth FLNG during the quarter, and this is to safeguard the delivery of the next unit to also have a significant delivery advantage over alternative liquefaction solutions. I'll now hand the call over to Eduardo to take us through the quarterly results for Q3.
Eduardo Maranhao
Chief Financial Officer
Thank you, Karl, and good morning, everyone. Now moving to slide 16. Q3 was another important quarter for us, marked by continued strong operational performance from Gimi and the successful completion of Healy's eight-year contract in Cameroon. Total operating revenue was $84 million in the quarter, compared to $130 million in Q2, primarily reflecting the completion of Healy's contract and the resulting reduction in operating days. GIME continued to perform above contractual levels, delivering earnings approximately 12% above its contracted base rate year-to-date, despite less favorable ambient conditions during the quarter. Healy completed its last month of operations in July and generated a further $8 million in commodity-linked earnings during that quarter, bringing the year-to-date contribution from commodity-linked earnings to $55 million. Net income was $42 million, bringing year-to-date net income to $200 million, more than double the comparable period of last year. EBITDA came in at $56 million compared to 127 million in Q2, primarily reflecting one month of Healy's earnings compared to a full quarter previously, together with lower commodity-linked earnings following the completion of the contract. Consistent with our capital allocation framework, we have declared another quarterly dividend of 25 cents per share in Q3. If we move now to slide 17, we'll talk a little bit more about our balance sheet flexibility. So our balance sheet continues to provide substantial flexibility to fund our next phase of FLNG growth, supported by our existing liquidity and significant financing capacity embedded within our asset base. This quarter, we secured over $1.6 billion of additional liquidity, including the $600 million revolving credit facility signed in July, the successful issuance of another $500 million bond issued in October, and our most recent upsizing of HILI's savings-backed facility, which was signed today. So as announced earlier, we have signed an agreement to amend and extend HILI's existing financing facility, increasing the facility amount to up to $960 million, extending its maturity to 2038, and also reducing its interest cost. We expect the transaction to close in December, releasing approximately half a billion dollars of net proceeds to us. We also see the potential to further increase the facility to up to $1.2 billion, as explained earlier by Karl, with additional drawdowns expected during 2027 and early 2028. So considering that, and including our fully-undrawn $600 million RCF, Our total available liquidity increased to approximately $2.3 billion. But more importantly, we continue to make significant progress in optimizing our asset level financing. So when we look at Esperanza, we have now equity funded approximately $1.4 billion to date, creating significant embedded financing capacity once long-term financing is put in place. As discussed before, we continue to progress discussions for a $1.8 billion long-term asset level financing, which, once closed, could release an incremental $1.2 billion of liquidity. That provides substantial capacity to fund all of our commitments throughout 2030, as you can see on the right-hand side of the slide. using a combination of existing liquidity, operating cash flows, and financing proceeds from these and other transactions, while at the same time preserving flexibility for further growth. Now turning to slide 18. So these slides, I think we have shown this before, but I just wanted to reiterate because it brings two fundamental components of our business model. A highly visible contracted earnings base and a substantial commodity linked upside. With Guimi, Healy, and Esperanza fully operational, we expect an annual run rate EBITDA of approximately $800 million by 2028, before any commodity upside and before any inflation adjustments under the Argentinian contracts. So that includes $150 million from Guimi, $285 million from Healy, and $400 million from Esperanza, net of our corporate overheads. So if FLNG number four is contracted on similar terms to Esperanza, our annual EBITDA has the potential to increase by approximately 50% to over $1.2 billion by 2030. And importantly, this remains our contracted earnings before any commodity linked upside. So if we look at on the right side of the slide, at $10 per million BTU, annual EBITDA could reach approximately 1.4 billion, increasing to $2.6 billion per year at current gas prices. To illustrate the scale of the embedded upside, if we apply LNG pricing as we've seen in 2022, that could result in potential annual EBITDA approaching $4 billion in that particular year. So I think the key takeaway is that we have a clear pathway towards more than $1.2 billion of annual EBITDA with meaningful additional upside from commodity prices supported by our long-term infrastructure contracts. So I think with that, I'll hand the call back to you, Karl.
Karl Fredrik Staubo
Chief Executive Officer
Thank you, Eduardo. Let's turn to slide 20 and a summary. GOLA remains the leading FLNG platform controlling 12.1 million tons of annual liquefaction capacity. We have an industry-leading economic uptime with 100% uptime for both Hilli and Gimi, and we have delivered 206 LNG cargoes to date. As just explained by Eduardo, our EBITDA backlog stands at $17 billion before securing a contract on unit number four, an exclusive of commodity upsides and inflationary adjustments. Assuming a contract on unit number four, we expect to see around a 50% increase in both earnings and backlog. We see SLNGs increasingly relevant to global energy supply, both because we enable diversification of cheap and attractive LNG from new exporters. Golar is highly strategically positioned for FLNG growth, both with the earliest available liquefaction capacity through unit number four and through securing options for incremental units. We remain with a disciplined capital allocation focused on shareholder returns. We have a share buyback program in place. We currently pay a dollar per share in annual dividend with strong capacity for additional growth once the existing fleet delivers to their long-term companies. That concludes the prepared remarks for Q3 earnings presentation. I'll hand the call over to operator for any questions. Thank you.
Conference Operator
Operator
Thank you. We will now begin the question and answer session. As a reminder, if you wish to ask a question, You will need to press star 1 1 on your telephone and wait for your name to be announced. Please limit yourself to two questions. If you have any additional questions, please re-enter the queue. To withdraw your question, please press star 1 1 again. We will take the first question. The first question comes from John McKay from Goldman Sachs. Please go ahead, your line is open.
John McKay
Analyst, Goldman Sachs
Hey, good morning, Karl, Eduardo. Thank you for the time. I wanted to start on the news around reserving long lead items for boat five. Can you just walk us through what your kind of thought process on the timeline is for, you know, let's say reaching full FID on boat five and then how the commercial terms for boat four play into that? Thank you.
Karl Fredrik Staubo
Chief Executive Officer
Hi, John. Our strategy remains the same. We only want to have one open FLNG at the time, and we do not expect to FID unit number five until we have clear visibility on a contract for unit number four. That said, we see very strong pressure on long lead items. We are essentially competing for, in particular, compressors and dual fuel engines with the AI data center build-out. So what we did during the quarter was to lock in some of that key equipment so that we can secure highly attractive delivery for unit number five once a contract for unit number four is secured. In terms of unit number four, we are in advanced commercial discussion for a long-term charter. We are, as for the other units, targeting around 20 years of contract. We are working through a similar framework to that of our existing contracts in terms of a US dollar denominated contract on UK law, long term duration, OPEX maintenance capex pushed through to client, either reimbursable or directly covered by the client. And then subject to which region, there's various degrees of a split between fixed and floating components. We continue to develop these opportunities, and once a contract is secured, that's when we will proceed on five and not before.
John McKay
Analyst, Goldman Sachs
Understood. Thank you for that. Second quick one from me. Look, you guys have locked up a lot of the funding you need for the next vessel into five. You mentioned broader capital allocation later in the call. Would love just to hear your latest thoughts on the buyback at this point. Thank you.
Karl Fredrik Staubo
Chief Executive Officer
We have an existing buyback program in place. Historically we've been more active in the market when the stock has traded softer and less active when it's seen some stronger momentum. And obviously from time to time we will be locked out due to material non-public information. That said, we do observe that the stock is down around 25% from the peak this year. We don't particularly see a reason as to why. The buyback program is available and I think in line with what the analysts see for the company, we see it as today's valuation as attractive.
John McKay
Analyst, Goldman Sachs
Got it. Thank you guys. Appreciate the time.
Conference Operator
Operator
Thank you.
John McKay
Analyst, Goldman Sachs
Thank you.
Conference Operator
Operator
Thank you. We will take our next question. Your next question comes from Alexander Bidwell from Weber Research and Advisory. Please go ahead. Your line is open.
Alexander Bidwell
Analyst, Weber Research and Advisory
Morning. Appreciate the time. Wanted to take a look at GIME's potential long-term run rate. So over the past few quarters, you've discussed the impact of seasonality and ambient temperatures on summer production. With the Q3 26 numbers coming in over base contractual capacity, do you feel that serves as a good baseline for long-term summer performance? And can you talk us through any optimization activities you're looking at to further improve summer production?
Karl Fredrik Staubo
Chief Executive Officer
That's a good question. So I think based on the production year to date, that's around 12%, but significantly lower during summer months and winter months. We do think it's fair to assume a reasonable overproduction over time, and we do think that's sustainable. The magnitude of that is somewhere between 10% and 15% is what we feel relatively good about. When it comes to maintenance shutdowns, we are then... together with the upstream partners aligning that to occur during summer months because the impact then of scheduled maintenance whether that's for the FLNG, the FPSO or any other infrastructure is then less penalizing to production. Hence, we do expect that the summer months production will be impacted both by ambient temperature and scheduled maintenance for the total GTA infrastructure. But over time, we think a 10 to 15% increase or overproduction is a fair estimate going forward. When it comes to further optimizations, we are working together with the upstream partners to further de-bottleneck and as we continue to produce, we see daily how we can do further optimizations. The magnitude of that, without any investments, can probably be in the very low single digits, so call it 1-3% for potential further enhances, and then we do see a potential for even further debottlenecking, but that would require some investments, and then that's a question on how such investments would be split between and us as FLNG owner and the upstream partners. But as long as it makes economic sense for everybody, I'm sure it will happen. So we continue to evaluate that.
Alexander Bidwell
Analyst, Weber Research and Advisory
All right. That makes sense. Appreciate the color. Switching gears over to donor vessels, could you talk through how you narrowed down the FLNG4 donor vessel to the Gray Stalia and how you're thinking about price, capacity, vintage as you evaluate donor vessels for FLNG5?
Karl Fredrik Staubo
Chief Executive Officer
So when we look for donor vessels, we look for MOS design vessels. The reason why we use MOS design is that that allows us to operate in a significantly wider range of met ocean conditions. So we can take a lot more weather than if we were to convert a membrane. So we will continue to focus on MOS designs. The good thing with most designs is that they're less efficient as LNG carriers and highly efficient as conversion candidates. There are plenty of MOS vessels out there and given their operational disadvantage as LNG carrier, it's relatively attractive to buy them. Then the larger you go on Capacity, in terms of storage capacity, the fewer vessels there are out there, and they're pretty much all on long-term contracts. So the bigger MOS you try to buy, the more complicated it gets. We are very, very pleased to have acquired the Grace Dahlia. It's been a vessel that's been on our radar for several years, and we're happy to have struck a deal with NYK to acquire her. When it comes to incremental vessels, we'll continue to focus on most assigned shifts and we will weigh the cost versus storage capacity in terms of the size of the next one. We do not expect to buy anything less than the Esperanza in size. So that's 145 and up. So anywhere from 145 to 177 is our interest. All right.
Alexander Bidwell
Analyst, Weber Research and Advisory
I appreciate the color. I'll turn it back over. Thank you.
Conference Operator
Operator
Thank you. We will take our next question. Your next question comes from Liam Burke from Bee Riley Securities. Please go ahead. Your line is open.
Liam Burke
Analyst, B. Riley Securities
Yes, thank you. Karl, taking a look long term, as your FLNGs roll out, you talked a little bit on your prepared comments about competition, favorable competition against land-based LNG. Do you anticipate any problem with the FLNG's basic capacity limitations as we get into the future as people consider development land-based versus FLNG?
Karl Fredrik Staubo
Chief Executive Officer
Yeah, so I think on a capex per ton basis, we do see that FLNG is likely competitive. Up to very large sizes, so probably up to 6 to 10 MTPA. Once you go significantly above that, then of course space becomes an issue, and then not capex per ton, but space and other considerations then suggest land-based. Then when it comes to OPEX per MMBTU, for large projects, there's probably more than 10 to 15 MTPA, then it makes sense to go land-based. Up to that point, both capex per ton and OPEX in dollars per MMBTU significantly favors FLNG build-out. One thing is to say that, I think the more important thing is to see what the industry is doing, and we do expect that within 2026, According to YPF, ENI and XRG, we do think they will progress with their two times six million ton project on FLNG basis in Argentina. So if experienced players like YPF, ENI and XRG think that the project at 12 MTPA is still best floating, I think that speaks to the fact that this is the direction of the industry. Once you see very, very large build-outs to 30 and 40 MTPA, then it's probably still sensible to do land-based. But for all other fields, we see FLNG as the most economic and flexible way of building them.
Liam Burke
Analyst, B. Riley Securities
Great, thank you. And just on the interest on the FLNG number four, is it geographic or is it producer concentrated or is it across the board?
Karl Fredrik Staubo
Chief Executive Officer
Our focus is to find attractive gas reserves. So I think it's more geographic than focused on any one charter.
Liam Burke
Analyst, B. Riley Securities
Great. Thank you, Karl.
Karl Fredrik Staubo
Chief Executive Officer
Thank you.
Conference Operator
Operator
Thank you. This concludes today's question and answer session. I now hand back the call to Karl Fredrik Staubo for closing remarks.
Karl Fredrik Staubo
Chief Executive Officer
Thank you, operator, and thanks for good questions. And for those dialing in and listening to today's call, thank you for your attention. Have a good day. Bye-bye.
Conference Operator
Operator
This concludes today's conference call. Thank you for participating. You may now disconnect.