IE Ivanhoe Electric Inc.

AMEX
$5.50

Ivanhoe Electric Inc. Q3 F2026 Earnings Call Transcript

AI Conference Call Analysis

Sign in or subscribe to read.
Conference Operator
Operator
Good morning, ladies and gentlemen. Welcome to the Ivanhoe Mines Limited third quarter earnings call. At this time, you are in a listen-only mode. Following the presentation, we will conduct a question and answer period. This call is being recorded on Wednesday, November 4th, 2026. I would now like to turn the call over to Tommy Horton, Vice President, Investor Relations and Corporate Development. Please go ahead.
Tommy Horton
Vice President, Investor Relations and Corporate Development
Hello everyone, my name is indeed Tommy Horton and I'm the Vice President of Investor Relations and Corporate Development for Ivanhoe Mines and it is my pleasure to welcome you to our third quarter 2026 conference call. This call is being recorded on Wednesday November 4th 2026. On the line today from Ivanhoe Mines we have Ivanhoe Mines founder and co-chairman Robert Friedland. President and Chief Executive Officer, Marna Klerta, Chief Financial Officer, David Van Heerden, Chief Operating Officer, Tom Vandenberg, Executive Vice President for Projects, Steve Amos, Executive Vice President for Corporate Development, Alex Pickard, and Executive Vice President for Technical Services, Simon Bottoms. We'll finish today's event with a question and answer session. You can submit a question using the Q&A box on the webcast page, as well as through the conference operator via the phone line. If we run out of time and we are unable to answer your questions, please do follow up with our investor relations team and we will endeavor to get back to you. Before we begin, I'd like to remind you that today's event will contain forward-looking statements and may involve risks and uncertainties that may cause actual events to differ materially from those in the forward-looking statements. Details of our forward-looking statements are contained in the Q3 2026 financial results press release, which you can find on CDAR+, as well as on our website at www.ivanhomemines.com. So it is now my pleasure to hand over to Ivanhoe Mines founder and co-chairman Robert Friedland for his opening remarks. Robert, please go ahead.
Robert Friedland
Founder and Co-Chairman
Good morning. I just am taking off from California to Florida, and this is the first time I've done this from an aircraft. I want to welcome everybody to this call. We're at a turning point today in so many different ways, both politically and lots of concerns about war and peace and a new administration in the House and Senate. Lots of uncertainty, but never a better time to buy Ivano Mines. I'm extremely confident in the turnaround and the vision of our management team. And I'm very anxious to get everybody to listen carefully because this is one of those rare opportunities. I can unabashedly say the time to accumulate shares and open up minds for your kids and your grandkids is now. So with that, I'll turn this over to Marna and we have a fantastic story to tell. Thank you.
Marna Cloete
President and Chief Executive Officer
Thank you Robert for those encouraging words and on my opening slide we see a picture of the widening of Platte Reef shaft to shaft where we are busy widening it from 3.1 meters to 10 meters.
Tommy Horton
Vice President, Investor Relations and Corporate Development
Sorry Mona, I'm just going to interrupt you. Operator, there seems to be an issue with movement of the sides. It's moving on my side but it doesn't seem to be showing up on the main deck.
Marna Cloete
President and Chief Executive Officer
Okay. Thank you. Yes, that's the correct slide. I can see it moved on my side. Thank you. No, no problem. And when Robert was speaking, the picture in the background and on our opening slide is a picture of our solar form that we've just commissioned. Let's go back. Cooler. Let's show that opening slide. Yes, exciting. That's the battery. That's the battery storage. It's very impressive. And we are very impressed with the delivery of the 60 megawatts and what it's done. And we'll tell you a little bit about it when we get to Kamau Kakula about how we're using the solar to reduce our diesel cost. Okay, so let's move into today's presentation. We start off on a sad note. We've lost one of our key team members in the Arbano family, Ivano Menini, over the weekend. Ivano passed away at home. He will leave a massive gap. He was the managing director at our Kapushi project. The site's very sore at the moment. We will have a memorial and a funeral for Ivano on Friday and our condolences to his family, to our team members. Everybody's very inspired to ensure that we build on his legacy. I've printed the key statistics for Kapushi for this quarter and Ivano has made such an impact. If I look at all the records that Kapushi achieved, it's one, two, three, four, five, Thank you for joining us. Thank you very much. Ivano ended his career at Kapushi on an absolute high note and the team there have taken it upon themselves to improve on that even further as a show of appreciation for everything that Ivano has meant for them. We can now move into the third quarter highlights. At Kamauka Kula, we've produced in excess of 67,000 tons for the quarter. Our cash cost for the year to date was $2.80 per pound of copper, and we maintain our guidance for the year. Our margins was also supported by a 47 cents per pound of smelter benefit, and we'll unpack that a bit further down in the presentation. We're tracking well to achieve guidance towards the bottom end of guidance for this year. And we also revised our 2027 guidance. And we've put out a bit of a taster in terms of what we're seeing the study results culminating in. We know that that is probably what everybody on the call is most interested in. So just after this introduction, Simon Bottens will take you through our revised thinking at Kamoa Kakula. and as Robert indicated in his opening remarks, we are confident that that is a solid plan to create a sustainable Kamau Kakula for the future. We know that we are on the right track. A lot of technical work and technical data is going into this turnaround plan and our team is confident that we will deliver on this plan. Also at Kamauka Kula, we sold in excess of 109,000 tons of sulfuric acid at an average price of $950 per ton. Our Q4 contracts were well over $900 a ton. So that's an increase of over 100% for the year to date. I've mentioned the Thank you very much. I've mentioned Kapushi in the context of Ivana there we have narrowed our guidance towards the upper end of our guidance limit to between 270 and 290,000 tons of zinc and then earlier this quarter we've also announced that we've grew the western forelands resources by 30% to over 12 million tons of contained zinc. That ranks as the largest and highest grade discovery in the past decade. So a lot of good news together with more clarity on our turnaround strategy at Kamal Kukula. If we move over to the next slide. Our team has really focused this past quarter on health and safety. And we've launched the One Ivanhoe, One Road to Zero campaign. This campaign drives zero harm, healthy people every shift. We want to make people aware that no task is so urgent. Thank you very much. and our initial focus is to improve our training as well as the implementation of a fatal risk control protocol and safety culture that we will embed across the organization and we will focus on areas of high occupational risk such as fall off ground and the handling of equipment. So with that as an introduction I will now hand over to Simon to take you through our revised thinking. Thank you Simon.
Simon Bottoms
Executive Vice President, Technical Services
Thank you, Marna. So good afternoon. Good morning, everyone. So firstly, we wanted to start by giving you an insight into the progress we've made with the ongoing technical studies and how we see that impacting and changing the direction of the Kamauakakula complex going forward. So if you progress to the next slide, please, Tommy. So firstly, I mean, one of the core focuses of our life of mine planning and technical work has been to reposition Kamoaka Kula to deliver a flexible, fully integrate and integrated top tier copper producer with optionality for production, rather than being heavily reliant upon single sources within the life of mine plan. and so as a result of that we've you'll see we've introduced the commencement of multiple shallow high-grade open pit starter pits into the mine plan commencing immediately in quarter one next year along with this we we've also rescheduled and resequenced a number of the underground mines and updating a lot of our geotechnical, geological and hydrological parameters which is enabling us to deliver a lot more flexibility and have a lot more optionality in our production plans relative to the plan you saw earlier in the technical report in March this year. Obviously the key outcomes are that we expect to achieve to fill the concentrated capacity by the second half of 2027 and we expect to start utilizing all of the smelter capacity producing both copper anode and sulfuric acid by the last quarter of 2027. So this combined, particularly with the introduction of the open pits, not just as the initial starter pits, but the later in life larger pits, we feel provide the foundation and really unlock and justify the incorporation of that phase four concentrator expansion, which ultimately returns the complex back to that steady state production of 500,000 tonnes. and I'll give you a bit more detail about that in the upcoming slides. So if we progress to the next slide, Tommy. So firstly, we're not turning our backs on Cucula. We're still very much focused on the redevelopment and the repositioning of Cucula. The development of the peripherals around the Cucula, the peripheral all drives around the periphery of the all body is still on underway. And despite hitting a record... Thank you very much. Thank you very much. are actually developing through marginal ore material. And so looking at that processing cutoff, we've made the decision and have been feeding all material above 0.3% copper. So this provides obviously extra copper production and provides in terms of marginal ore, Thank you for joining us. So within the first quarter of 2027, we expect to start commencement on mining on two small high-grade starter pits, where between 2027 and 2028, we expect to mine some 3.5 million tonnes at 2.5%. This is spread across four pits. with variable strip ratios, some at quite high levels of 11 to 1 with some quite much lower strip ratios. The key being, though, is that these open pits provide an initial start, an easy, low capital, low technical risk start to Hi-grade copper tons which sit only 50 meters below the current surface and allow us to start rebuilding stockpiles, filling the concentrators and provide a lower cost source of ore relative to even the cheapest underground to fill up our concentrator feed and rebuild a stockpile which will give us operational flexibility. These starter pits, as you can see in the graphics on the right, I mean, even the deepest portion of them has a high wall of some 90 meters depth. So they are by no means a significant technical undertaking. Drilling has already commenced on these starter pits to infill drill them to a grade control spacing prior to commencement of any production. but at the moment we're still updating those open pit forecasts as those results come in and these grades and forecasts are based on the updated mineral resource models that we've completed through the course of this year. So what this means for the complex is, as you've seen in our quarterly release, is we have reset the production guidance for 2027. As we've reduced that reliance on the caculatans, we've incorporated those initial shallow high-grade starter pits into 2027 with pre-stripping starting in the first quarter and then first ore expected to come in from August, utilizing filling the entire mill capacity across all of the concentrators by Q4. The result of this though, this repositioning, it gives us a lot more flexibility, buys us more time to reset Cucula, but does mean that we've restated that production. to reflect the variability in the timing of the development for accessing those higher grade blocks within Cocula. So whereas the open pits we feel provide a stable, steady state Okay, next slide, please, Tommy. So stepping away from the starter pits, looking forward to the larger pits, we see that the starter pits will provide an initial concentrator fill for our phase three concentrators. Then as we push back into the larger pits, They effectively unlock the phase four concentrator with a significant return on capital, very short term payback, and unlock a lot of that work that was put in place previously with significant synergies with the existing phase three circuit. So we're still updating and finalizing our technical studies and we have engineering designs for a range of phase four expansion scenarios, but we're expecting to add somewhere between five and 6.5 million tons per annum process capacity to phase four with as the open pits progress from those initial starter pits pushing back to the larger pits. So we expect to indicate some selection of some options with our final technical report updates and our life of mine updates in March this year. But immediately thereafter, we'll be commencing detailed engineering and costing of that selected options. So turning to the next slide, if we take a look at what the open pits are that we see longer term are potentially unlocking this phase four expansion, indicated on the graph on the right hand side, we've taken a benchmark of all Global Copper Operations, scaled by annual production and grade. And we've highlighted the area where we see the potential for the Kamoa open pits situated. And as you can see, they're in a globally standout position with significantly high grades, As well as significant production phases, production levels. And these production levels, we expect to step up to about 40% of the overall feed after the phase four expansion. These open pits, it's not just one open pit. There are a number of open pits which initially start as small high-grade starter pits pushing back into much larger laterally extensive pits but still only with the deepest pit at the moment that we've been modeling and designing being 190 meters deep. So still representing a very low technical risk. Added to this the incorporation of open pits into some of the resources which were previously reported as underground resources, but also unlocking some resources that were previously excluded from underground resources. It enables us to lower our cutoff grades, which adds significantly more metal and improves the extraction ratios substantially from that of the underground areas. Where, as many of you will be aware from the updated geotechnical designs, we had previously limited the underground extraction ratios to about 65%. The open pits will be extracting up to 97% of the ore situated within their pit designs. As well as this, even with current costs and we've applied. Thank you very much for joining us. and so therefore these pits provide a very quick return on capital and have a lower longer-term sustaining capital cost than equivalent underground mines. And now I'll pass you back over to Alex for the operational results. Oh, sorry, David, sorry.
David van Heerden
Chief Financial Officer
Thank you, Simon, and good morning and good day to everyone joining the call. If we move to the next slide, please, Tommy. So Kamauka Kula sold just over 67,000 tons of viable copper in the third quarter, and that's up nicely from the 61,000 tons sold in Q2. Thank you very much. Kamauka Kula's quarterly revenue exceeded the $1 billion mark for the first time. So the record revenue for Q3 was up more than 17% from the previous quarter because of the increase in town sold, the higher copper price and the increase in revenue from sulfuric asset, which actually increased to over $100 million for Q3, up from $56 million in the second quarter. and that was with an average price for the third quarter of $915 per tonne. The average realized copper price for Q3 was $6.12 per pound of payable copper, but this was actually applicable to a relatively low number of tons, with 62,000 tons still provisionally priced at the end of the quarter and remeasured at the end of Q3 at the quarter-end closing copper price of $6.55 per pound. The stronger revenue performance translated into meaningful improvements in EBITDA and margins, as we can see on the next slide. Thank you very much. but more details on that on a following slide. The cash costs for the year to date of $2.80 per pound of payable coppers right in the center of our guidance range and we maintain that range. While the quarterly costs number is elevated, two important structural mitigants are basically on our doorstep. The reduction of the diesel generation costs Thank you very much. Kamal Kukula's EBITDA for Q3 was $478 million, which is the highest EBITDA since the first quarter of 2025 and an almost 25% increase in the previous quarter. The EBITDA margin increased to 46% from 44% in Q2. That's a really strong outcome. Given that the operation remains below its longer term production capacity and continues to carry elevated power and mining costs at the current rate. Higher copper prices, of course, played an important role and we continue to realize significant smelter benefits. And the next slide sort of isolates the benefits we are already receiving from the smelter. So this slide is really just, again, a reminder of why the smelter is so strategically and financially important for Kamalakakula. Compared to the second half of 2025, the smelter has delivered approximately 86 cents per pound of gross benefits in 2026 to date through three principal channels. The largest benefit is approximately 46 cents per pound from sulfuric acid by by-product credits. This benefit increased to 68 cents per pound in the third quarter and that's expected to remain Thank you very much. These benefits are partially offset by the smelter operating cost of approximately 39 cents per pound. The result is a net benefit of approximately 47 cents per payable pound, even with the smelter currently operating at around 60% of capacity. Mining and processing costs mostly linked to high diesel have increased over the comparison period, which means the smelter benefit is not yet fully visible on the headline C1 number. But of course, without the smelter, current cash costs would have been quite a fair bit higher. The next slide looks at the diesel price impact a little closer as also the longer term cost expectation. Between Q2 and Q3, C1 increased by 16 cents per pound, of which approximately 9 cents per pound resulted from the higher diesel prices. Since the first quarter this year, the diesel component in C1 has actually increased from 34 cents to 61 cents per pound, an increase of 27 cents per pound. The balance of C1, excluding the diesel, increased more moderately from... Thank you for watching. The diesel burden is of course not expected to be a permanent feature of the cost base, but the current levels have been assumed for the guidance ranges. And with the on-site 60 megawatt solar facility now fully operational, this is expected to reduce the energy cost by, as I mentioned, 10 to 20 cents per pound. And as the Kukula dewatering was switched over from being powered by backup diesel generators to the new facility in mid-October. For 2027, we are guiding to C1 costs of $2.50 to $3 per pound and beyond the near-term recovery period, we see a clear pathway to below $2.50 per pound supported by lower diesel consumption, improved operational performance, improved mining grades and then greater fixed cost absorption as production increases. Despite the cost pressures in the quarter, the higher copper sales, copper prices and the asset revenue generated a very strong quarter-on-quarter increase in EBITDA and that can be seen on the next slide. This waterfall bridges Kamau Kakula's EBITDA from the $385 million in Q2 to the $478 million in Q3, an increase of $93 million. Higher copper prices contributed approximately $59 million, while the strongest sulfuric acid sales contributed approximately $41 million. Thank you very much. Thank you very much. Kapushi is, of course, becoming an increasingly important source of earnings and cash flow. And that's exactly where we're focusing next. Okay, so Cappucci delivered another record quarter as Madna mentioned. Revenue increased to $255 million from $146 million in the second quarter. And that was supported by higher zinc sales and a realized zinc price of $1.73 per pound. Kapushi sold almost 70,000 tons of payable zinc during Q3 and that was up from 43,000 tons in the second quarter. So payable tons sold was a little higher than produced leading to a small decrease in inventory which is sort of noted on the slide. The logistics constraints which we noted in the second quarter decreased Thank you very much. and with the majority of the inventory now in transit at the end of the third quarter, we do expect that sales in Q4 will exceed production probably by around 10,000 tons. So another very good quarter for capuchin expected in Q4. Kipushi is definitely no longer simply an operation and ramp up, but is really a meaningful second earnings and cash flow engine for the group. If we move to the next slide. So the EBITDA more than doubled for Kipushi to $108 million from $51 million in the previous quarter. The EBITDA margin expanded to 43% compared to the 35% in Q2. So nice increase there as well. So this really represents a substantial improvement from the $27 million of EBITDA at a 21% margin generated in the third quarter last year. Equally important, this performance is being delivered at a very competitive cost. Year-to-date C1 costs of 89 cents per pound of payable zinc remained at the midpoint, just below the midpoint of our guidance range. and we keep the guidance range unchanged. Keeping the cost this tightly controlled with a much higher than planned diesel price and other inflation pressures, increased logistics charges, that has really just been excellent. and yeah, Cappucci also recently secured an additional 10 megawatt of grid supply power from a third party providers, which is then expected to reduce power instability at Cappucci and as a result, reduce power cost. and from the backup diesel generators and from the fourth quarter. And so, Cappucci generated around $155 million of operating cash flow for the year to date. and we plan to start upstreaming the excess cash from the BRC operating subsidiary to our Canadian parent bank accounts in this quarter. And, you know, I think lastly, I think it's just I'm confident that the Capusci team will will honor Ivano's legacy through just achieving even greater highs in the future. But I would also just like to add my voice to Mara's that Ivano will definitely be deeply missed. We move to the next slide. So at the Ivano Mines level, adjusted EBITDA increased to a record of $241 million for the quarter from almost $180 million in the second quarter and $87 million in the third quarter of last year. So this reflects Ivano's attributable contribution from Kamau Kukula together with the strong improvement at Kapushi. The record-adjusted EBITDA was achieved notwithstanding the increased investment in exploration expenditure of $44 million for the quarter, up from $15 million in Q2. But Alex will tell you a little bit more about exploration later on in the presentation. So profit after tax was $45 million, broadly stable compared to $46 million in the second quarter. And the Q3 result included $47 million of profit from Capucian, $25 million from a share of profit from the Kamau Kakula joint venture. And this earnings picture is therefore... Thank you very much. Thank you very much. and shifted that into 2027. So the range hasn't changed, but currently excludes the capex for the open pit, which Simon mentioned, which we estimate to be between $100 and $200 million, but the work is yet to be tended. At Platte Reef, the 2026 capital guidance has increased to reflect the weaker US dollar against the Rand and additional operating costs capitalized while the phase one concentrator progresses towards commercial production. The spend at Platte Reef is accelerating quite nicely as the team approaches phase two completion, which is expected in the fourth quarter next year. We do expect phase one on Platte Reef to reach its commercial production either late this year or very, very early next year. Blattery's funding position was strengthened by the Senior Project Finance Facility and under that we drew $187 million in Q3 this year. Kapushi Sustaining Capital remains relatively modest relative to its growing cash contribution and spent $48 million on that year to date. And I mean, across the portfolio, our approach is to prioritize the capital that supports safe and sustainable operations and restores command to its Thank you very much. So I've now ended September with $643 million of cash and cash equivalents on hand compared with $635 million at the end of Q2, so an increase in cash. On a pro-rata basis, including Ibeno's attributable share of Kamal Kukula, cash-in-cash equivalents was $785 million. And then net debt on a pro-rata basis was almost $1.7 billion. And that's up slightly from the $1.5 billion at the end of the second quarter. Thank you very much. and 2.48 times to 2.26 times and that further decreases to 1.75 times if an annualized Q3 EBITDA is used. So we remain well funded with an appropriate focus on liquidity but confident in realizing the expected growth in our earnings over the near term. And with that, I hand over to Alex Pickard, our EVP Corporate Development to start the operations section of today's presentation.
Alex Pickard
Executive Vice President, Corporate Development
Thank you, David. It's Alex Pickard speaking. What you're looking at here on the slide is a very nice photo of the concentrate thickeners for Project 95, which has been a big success story, which I will come back to. I just want to start quickly by reiterating some of the key points that Simon made earlier. I think his line, unfortunately, was a little bit choppy, or at least it was for me. So the first point is the shift to a combined open pit and underground mining operation we believe will be a complete game changer for the future of Kamoa Kukula. The open pits are a much more flexible, lower technical risk and also the lowest cost source of ore that you can find on the Kamoa complex. At a grade of, you know, in the range of sort of 2.5%, these are also some of the highest open pit copper tons that you will find anywhere in the world and at depths of, as Simon mentioned, you know, starting from 50 meters. The open pits are also very scalable and they will support the future phase four expansion and a long life of 500,000 tons of production. Thank you very much. and then just to reiterate on the guidance we will just about hit the low end of our 2026 guidance at 290,000 tons you know I think we fully acknowledge that there is disappointment on restating our 2027 guidance but the new range that we are putting up of 300 to 350,000 tons of copper I think has a much higher level of confidence and really what we are doing here is taking the turnaround of the cooler completely off the critical path which is the most technically complex activity that we need to do at Kamoa Kukula. But that said, with time, we are still fully confident that Kamoa Kukula itself will come good in 2028 and beyond. It will deliver high-grade tons, which will allow us to increase the production rates up to 400,000 to 450,000 tons before we do the Phase 4 expansion. So I just wanted to start by reiterating those key points, but we can go to the next slide, please, Tommy. In terms of the third quarter, and I know we're sort of running short on time, so I'll be brief. Look, I think it was a very solid quarter. We actually achieved a 12-month high in terms of mining and milling rates, equivalent to 14 million tons, so that was up about 17 or 18%. Thank you very much. and I'm also happy to say that in October we've also hit new records in terms of the tons coming from underground. Looking at the concentrators, we are at about 70% of capacity at phase one and phase two and we are well beyond 100% of the nameplate capacity but now safely operating at 6.5 million tons from phase three. We obviously have the benefits of the acid production, 118,000 tons for the quarter and as Simon mentioned, we want to be filling these concentrators completely from mid-27. Project 95, you know, that's something that we've talked about very often over the last year or so, but we really want to report back some good news that it has been a very successful project since it was completed in June. You know, we now have a really good sense from the operating data that the recoveries have improved by approximately 5% at the phase one and phase two concentrators. We averaged 89% in Q3, but actually over the last couple of weeks we've been achieving recoveries of 91-92%, which is really I think quite incredible when you consider what we are milling today is a much lower recovery. So from a grade recovery point of view, I think achieving 92% of feed grades of 2.1, 2.2% copper is pretty stellar. And we're excited to try and push that up towards 95% as we start to get the feed grades up to where they're supposed to be. So with that, I think I'll pass to Steve on the smelter.
Steve Amos
Executive Vice President, Projects
Thanks. Thanks, Alex. Smelter performing very well. We are at 60% of capacity and we are consistently performing at 60% of capacity. The only reason it's 60, not 100, is there's insufficient concentrate ahead of the smelter. So 60% is what we can smelt. Produce 76,000 tons of salable copper in Q3 2026. And there's a fair amount of an unsold inventory or stock in the smelter that we need to get rid of in the next couple of months. Planning a big shutdown in mid Q2 2027, 35 days, re-bricking and some repair on the tap holes. Next please, Tommy. I'll talk about solar at Kamoa. It's been a huge success. We recently handed over 60 megawatts of continuous power to the mine. The big advantage of the solar is the reliability, 95% plus reliable. Tariff is good, approximately 17 cents per kilowatt hour. and another advantage is that during the day they're producing significantly more than 60 megawatts because obviously that's when the solar really comes into its own and we can buy that from the IPPs at a discounted rate as well. Two PPAs. Our purchase agreements have been signed for phase two. So phase two is basically a carbon copy of phase one. So a doubling of the capacity from 60 to 120 megawatts. Plan that roughly by the end of 2027. In addition to that, we are negotiating with the two IPPs from phase one. They have land available, which we've compensated for an additional 15 megawatts each. So the plan is by mid-2028 to bring that additional 30 megawatts online, which will give us 150 megawatts. I think according to the energy balance, October is the first month that I can remember where we are not reliant at all on diesel generators. So that is good. And then the point I think that David made as well is that the diesel consumption has fallen significantly in September due to the solar. Next one, Tommy. Sulfuric acid, yes, we've really benefited from the, well, one of the pros from the stretch of our use issue Very, very high sulfur prices landed in DRC, which means sulfuric acid is selling at a premium. We're producing about 40,000 tons a month. That is at our 60% capacity. The market remains very tight in the DRC for the reasons that I've mentioned. Not only is sulfur expensive, a lot of the oxide producers have sulfur burners on site, burn sulfur, produce sulfuric acid, and use that to leach copper. But the supply is also constrained due to the issue in the Straits of Hormuz. If I remember correctly, back in the early days, we budgeted $150 a tonne, and we're well north of $900 now, which has been a nice little upkicker. Yeah, and sales in October averaged $950 a tonne, which is great for us. Next one, please, Tommy. Kipushi again. We've spoken about this at length. These guys are doing absolutely fantastically. 77,000 tons of zinc for the quarter. A mine grade of close to 42% zinc is astronomical. The mill is running fantastically. The recoveries are running very well. We're even seeing some small constraints in the concentrate filter, which is a good thing. But I think Kipushi is, you know, The Shining Star this year, in fact. And we've actually trimmed the guidance range to the upper end, 270,000 to 90,000 tons of zinc. And that is set to be the world's third biggest zinc mine. So that's going very well. Also, looking at solar at Kipushi, they are running a fair amount of diesel in the background. We're looking at a 10 megawatt Tomi Davies, hybrid solar PV facility with battery storage as well. Pretty much a carbon copy of Kamoa. And we hope to bring that in Q2 2028. We'll sign the PPA Q1 2027, probably February 2027. So that's very positive for Kipushi and it'll obviously reduce the operating cost as well there. Next one, please, Tomi. I'll talk a bit about Plat Reef, the project phase two projects at Plat Reef going very well. Shaft three was successfully handed over at the end of March this year. So we're busy ramping that up. That has more than enough capacity to feed the phase one concentrator and it has capacity to feed the phase two expansion. We've had a few hiccups on the phase one concentrator with the tailings filter. We've installed an additional filter. Those hiccups are over, and we plan to meet nameplate capacity early 2027, if not earlier. Construction of phase two, the phase two concentrator, going very well. We started that in March, April this year. Our target completion date is Q4 2027, if not earlier. and of course that really brings Platte Reef alive, milling capacity in that mill of 3.3 million tons per annum. The shaft two, so that's the big shaft, the one you can see in the picture in the background, 8 million tons wasting capacity, one of the biggest shafts in Africa. We're busy with what we call the slipen line or the widening of the shaft. Mona mentioned that earlier from 3.1 meters to 10 meters. The plan is to bring that on for man and material late 2028. That takes significant pressure off shaft one, which is our current, currently the only shaft that is used for man and material. And of course, we're slinging a lot of material underground for the construction. So that's going well as well. I think Plattree Phase 2 project is going very, very well. Thanks, Tommy. I think it's over to Alex now.
Alex Pickard
Executive Vice President, Corporate Development
Thanks, Steve. I'll close out with a quick update on where we are with exploration. Western Forelands, I think we had a really good quarter with the mineral resource update. As Marna mentioned, we're up to about 12 million tons of contained copper across inferred and indicated, so an increase of 30%. Maintaining our record of discovering copper at an industry-leading low cost of less than $10 per tonne. and we're now by far the largest and highest grade discovery of the last decade and I would wager we will be in production before probably any of these projects. So we're very excited about what's happening at the Western Forelands broadly. I think we have a couple of slides just to take you through the near-term drilling plans. and actually on that note I will just recommend that anybody that missed the webinar on the Western Forelands that we did in September after the resource updates you can listen to that there should be a link on our website so look the drilling now is really in sort of two separate parts we are still doing some expansionary drilling but then there has been more of a shift in focus to infill drilling to prepare for development and mining activities So in terms of the expansionary drilling, we did leave a lot of drilling on the table that wasn't in the cutoff for the resource estimate. So we think that we have at least a couple of million tons additional copper. That's really in the zone that is marked as three on this map, the eastern extension of Makoko East. But we also have some more work planned. Thank you very much for joining us. What we really focus the bulk of our drilling this year on is infill, starting with 63,000 meters, which is infilling the shallow mineralization less than 200 meters in depth. so that is highlighted by I think the pink the pink triangles and the yellow triangles at the sort of top end of the map and then once we have that drill data we've already started that work in September but once we have that drill data next year that will really underpin the start of mine planning and a scoping study that we will move into in 2027 and then we also have more drilling to plan sorry more drilling to delineate the Slightly deeper mineralization, but still less than 600 meters in depth, which is in two additional phases highlighted in red and in blue. So look, we're really excited about what's happening with the Western Fallens and this Makoto district in particular. We've also been spending, I think David mentioned, we had quite a high exploration spend for the quarter. We've been busy with relocations to prepare for open pit mining. So those are very I think over 90% complete. And then we've also been building a new camp for the Western Forelands, which will really become the sort of base of the project and the future base of operations. That camp will be fully functional by Q2 of next year. So a lot going on. Thank you for watching. so that was really our first proper quarter of drilling but I'm pleased to say that we've already confirmed an iron ore copper gold or IOCG hypothesis we've had several very promising intersections of albeit relatively weak but chalcopyrite which we're seeing across intervals of 100 to 150 meters from depths of only 70 meters so that's a very nice place to start and we just need to try and vector in on where the grades are going there and then moving a long way away but across to Kazakhstan at our joint venture properties in the Chusarisu Basin we've done a lot of drilling there 17,000 meters completed through Q3 and we have had also our first real notable intersect of weak chalcopyrite mineralization and a big intersect to 270 meters but also sort of slightly Thank you very much. Drilling is also continuing in Angola and elsewhere, but that's the focus of the presentation today. So I think we've run over slightly. I'll hand back to Tommy for Q&As. I think we can maybe take some more time.
Tommy Horton
Vice President, Investor Relations and Corporate Development
Yeah, absolutely. Thanks, Alex. So we'll now begin the question and answer session. And yeah, we'll obviously be allowing extra time for the webinar to accommodate the questions that have come in. So covering analysts, you can submit your questions to the operator by the phone line. Questions can also be submitted through the webcast. um as mentioned at the top of the call if if we are short on time and unable to uh address all the questions and please do um be get in contact with our investor relations team and we'll endeavor to follow up so uh operator we'll start by clearing the phone lines and then afterwards we'll run through the message boards thank you thank you ladies and gentlemen should you have a question please press the star followed by the one on your touchtone phone
Conference Operator
Operator
You will hear a prompt that your hand has been raised. If you wish to decline from the polling process, please press star followed by two. And if you are using a speakerphone, please lift the handset before pressing any keys. First question from Auras Wakeda with Scotiabank. Please go ahead.
Orest Wowkodaw
Analyst, Scotiabank
Hi, good morning. Could you please give us some more color around Kukula? And specifically, the release talks about a reduction in the estimated maximum mining rate. Can you please elaborate sort of what you mean by that and in terms of where you think ultimately Kukula can supply with respect to Orpheed here?
Simon Bottoms
Executive Vice President, Technical Services
Sure. So Simon here. So the reason we've been looking at a slightly different strategy with Cucula is as we've been going through some of the optimizations with the updated geotechnical and hydrological models, we've been repositioning the pillars and a lot of the mining will be refocused on the high grade core. So we're actually able to position some of the pillars in some of the lower grade areas and Thank you for joining us. Just under 20% of total ore feed post phase four completion. But it's more of a revenue optimization looking at both the pillar positioning and in terms of geotechnical stability and also hydrological inflows. There's some key areas within Kukula where we've been able to identify as potential high inflow zones and so therefore we're adjusting the mine plan to to try and avoid those areas for as long as possible in the mine plan before then extracting in the final years of Kukula's life.
Orest Wowkodaw
Analyst, Scotiabank
Is it correct if I look at your figure one in the release that it's sort of doing some of the math that you think Kukula can get to now only about five million tons a year in terms of source or contribution ahead of any phase four expansion?
Simon Bottoms
Executive Vice President, Technical Services
Thank you for watching. it's yeah I think that the reason we put that graph is in the immediate obviously we've pushed out that that stoping access to those high-grade stopes it's no longer in 2027 now sits in 2028 and we're not it'll only be later in 2028 when you start to get a full advancing stoping phase in that eastern block so only really in 2029 do you see a full year of of of higher production rates coming out of Kukula
Orest Wowkodaw
Analyst, Scotiabank
OK, and just finally, so does that mean that 29 would be the first year we should expect copper production to be in that 400 to 450 range?
Simon Bottoms
Executive Vice President, Technical Services
No, no, not at all. No, that's that's why we're saying 20, given the 27 guidance and then 20, the guidance there afterwards being in that 400 to 450, because that really being supported by the open pits more so than Kukula.
Orest Wowkodaw
Analyst, Scotiabank
OK, so you think 28, that's realistic.
Simon Bottoms
Executive Vice President, Technical Services
Thank you.
Conference Operator
Operator
Thank you. Next question from Daniel Major with UBS. Please go ahead.
Daniel Major
Analyst, UBS
Hi, thanks very much for the question. The first one, I mean, you gave a similar message of confidence in the updated mind plan in the second quarter and you've obviously cut the medium term outlook again. What's Different this time? Is it the inclusion of the open pits that's lower risk? Why should we be confident now when the message was the same in Q2?
Simon Bottoms
Executive Vice President, Technical Services
Daniel, yeah, so definitely inclusion of the open pits definitely provides a big de-risk for us. But I mean, don't forget in Q2, we started these mine designs and mine plans with geotechnical redesigns off of old models and old data. We said we were embarking upon a massive data collection process. We've been going through that process this year and we're continuing that process. So what we're putting out now is, I suppose, we wanted to put it out early in response to criticisms that things were out too late before. Even in advance of our technical report, this is what we're seeing in terms of the updated combination of resource geotechnical and hydrological models. but yeah we do see the the open pit as a substantial de-risking on that production profile and then any advancements on Cucula become an upside rather than a dependency in terms of those production rates so and I think as I said earlier like we're not we're by no means trying to say are we turning our back on Cucula or are we saying we're not going to achieve the recovery plan that's not the messaging at all but we are Okay, thanks
Daniel Major
Analyst, UBS
Then maybe the second question, obviously the whole strategy is pivoted a bit more towards the open pits. So three questions. Is there any permitting needed to access the ore tons you've got in the mine plan, particularly for 2028? Is there any difference in the metallurgy, any oxidation? And I mean, it seems quite quick that these are brought into the mine plans. I mean, how well defined... is the kind of geology and the mine plan to give you the confidence to include about 20% of all feed in 2028 from these open pits.
Simon Bottoms
Executive Vice President, Technical Services
Okay, so starting with your first question. So permitting, no, there is no permitting requirements for us to start the open pit. The original Comorica Cooler permits included open pit mining and did envisage that as part of that. As the open pits progress, so as we progress beyond 2030, there will need to be some amendments to the permits. in order for us to mine in a northern district where there wasn't necessarily previously open pit mining included, but we have plenty of time to be able to incorporate that. We have commenced and are in the middle of a relocation process across the initial open pit mining area and the government moratorium has been issued. The compensation has already commenced. Thank you for joining us. Thank you for watching. In terms of metallurgy, any material in the open pits that sits above 40 vertical meters, we've zeroed out in terms of the current assumptions. So we've treated them as if there would be no mineralization or no Thank you very much. Thank you for joining us. They are all part of indicated resources and existing underground reserve areas, so they're quite well defined. We're obviously updating our geotech assumptions and parameters around them, but for now what we've done is just assumed very conservative slopes on the single high wall that remains in each of those open pits. and we expect to be able to try and steepen that as we get some of the data in. So in terms of the immediate ramp up for the open pit, I think we're quite well defined and we've got infill grade control drilling already underway and our strategy is to have them fully grade control drilled before we even start any stripping. So there will be no surprises, nothing unexpected and with that grade control drilling we will be doing Thank you very much. Thank you. Next question comes from Craig Hutchison with TD Cowen. Please go ahead. Hi, guys.
Craig Hutchison
Analyst, TD Cowen
Just a question on the 2027 guide of 300 to 350. It's based on saleable production. Can you give us a sense of what the actual mine production is versus how much you guys plan to draw down from inventory? And maybe just as a follow up on that, what sulfuric acid price are you guys using when you set your cash cost guidance? Thanks.
Simon Bottoms
Executive Vice President, Technical Services
So firstly, in terms of mine production, we're only planning to have a fair, that production guidance is based upon purely on mine production at the moment. We do expect by the very end of 2027 to start building a small stockpile. by 2028 we expect to be building a much more substantial stockpile and one of the key strategic targets of our new life of mine plan will be to build up over the course of the next few years a three month full grade or full plant process feed stockpile so that we do restore that flexibility in terms of the process feed control so we haven't assumed any Thank you very much.
David van Heerden
Chief Financial Officer
To get to the range, we've looked at different prices on the up and the downside. We're in the fortunate position that the sulfuric acid has been a hedge to the higher diesel prices. We've assumed current diesel prices in the Thank you very much.
Craig Hutchison
Analyst, TD Cowen
Okay, great. Maybe just another follow up. Just in terms of the grades for the second half of this year, you guys are focusing, I think grades were going to be 2.6, 2.7% on average, but it came in quite a bit lower in Q3. Is that a function just like, are you seeing negative grade reconciliation in the second half here? Is there a risk into Q4 just based on, you know, lower grades we've kind of seen in Q3 to date? Thanks.
Simon Bottoms
Executive Vice President, Technical Services
So, no, the grades have been a function of us taking the operational decision to feed that marginal ore, not just from Cucula, but we have also fed additional marginal ore from Consoco. The grade into Q4, we do expect to lift slightly with respect to this quarter, but it will be lower grade as we are feeding marginal ore material. So anything that is capital development material, Thank you very much.
Craig Hutchison
Analyst, TD Cowen
Okay, thanks, guys.
Conference Operator
Operator
Thank you. Next question comes from Dalton Barreto with Canaccord. Please go ahead.
Dalton Baretto
Analyst, Canaccord Genuity
Thank you, operator. Thanks for taking my questions. I want to stay on this open pit pivot here. Those are some really high-grade open pits. I mean, the grades look like they're in line with the Camel Underground, and you're going to put them in production in sort of six to nine months. And I'm just wondering, why weren't these part of the mine plan right from the beginning? Thank you. Sure.
Simon Bottoms
Executive Vice President, Technical Services
So, I mean, the key, I suppose there's been two key pivots in terms of the open pitch strategy. Open pits had been evaluated before. As I said, mentioned earlier, they've even been included in the original Kamara-Kakula license permitting process and ESIAs. The first, I suppose, change was from an economic trade-off. Obviously, with the updated geotechnical regimes last year that we put out in March, the extraction ratios are much lower in the undergrounds than they were assumed to be previously. But then secondly, and perhaps more importantly, is the influence of the concentrate grade on production. Thank you for watching. So from that perspective, the open pits weren't necessarily the highest priority. Obviously, the starter pits are starting on some of the highest grade areas. Some of them, obviously, slightly higher strip. So we start two starter pits, one with 11 to 1 strip ratio, one with a 7 to 1 strip ratio, but with very good grades equivalent to the underground because the starter pits are mining out previous underground resource and reserve areas. Those pits then push back onto additional shallow mineralization, some of which was excluded from the underground designs. But really, the incorporation of the smelter has removed that bottleneck from the project economics of needing to focus on concentrate grade. So we're now able to Thank you for joining us. Thank you for joining us today. Diesel prices make a much better operating margin than the equivalent underground for those shallow areas of the ore body. So given that kind of clear positioning in the trade-off, we're now working through building in those additional benefits into the economics for those mine plan updates that we plan to put out in March.
Dalton Baretto
Analyst, Canaccord Genuity
Great. That's good color. Thank you. And then maybe switching gears to the first question to Morris on the... Mining rates at Kukula. So, you know, I understand that there's sort of geotech conditions and, you know, water management and so on. Your development rates are still, but I don't think I heard an actual number in terms of what the production rate could be at steady state once you're stoking.
Simon Bottoms
Executive Vice President, Technical Services
Look, it goes through a peak. We do peak close to just above 6 million tons. But then we do back off again as the stoping face advances. And in all honesty, look, we're redesigning Cucula right now. So we've got detailed designs for the first few years, which is what we put out at the moment. So I do expect we will be looking to put together, as we put larger, wider pillars in the lower grade areas, I expect we will be increasing the grade of Cucula resources and reserves, but probably decreasing the overall metal content and perhaps shortening the life there. but I mean we're working through that hydrological model is is going to be one of the key components that I suppose influences that long-term steady state rate but right now yeah anywhere between four and six million tons is is reasonable for that that Thank you very much. as you're in a typical any typical mine in the last few years of its life and you would see that in the prior Cucula profiles you'll see it reduced down to two and a half million tons and carry on for a few years there's quite a overhead cost that you're carrying to continue the pumping on so we'll be looking at that from a trade-off perspective of whether we can shorten the life or actually whether we We are better off cutting off the pumping and shortening and leaving some of that material behind, particularly if it's in the lower grade areas.
Dalton Baretto
Analyst, Canaccord Genuity
Understood. Thank you.
Conference Operator
Operator
Thank you. Next question comes from Fahar Tariq with Jefferies. Please go ahead.
Fahad Tariq
Analyst, Jefferies
Hi, thanks for taking my question. For the underground different zones, can you just talk about where The ore feed is coming from next year, the western section, the mature extraction zone, and the further eastern side. Thanks.
Simon Bottoms
Executive Vice President, Technical Services
Sure, so the majority of the ore production from Kukula is coming from the northwestern side. There is some as that mining front is progressing into the center. If you've listened to some of the webinars and looked at the videos previously, the western side is much more like a... If you imagine, take a cereal bowl, cut it in half, that's what the ore body actually looks like in three dimensions. So as you... The biggest production front is in the northwestern corner where I think we even pointed to some stoping blocks in that slide. We'll then be progressing across to that central area and there's some access development coming across there. So it really is the western side that drives the 2027 production, not the east. The eastern side is very production is very much focused on development of those long term and midterm accesses. Thank you very much.
Fahad Tariq
Analyst, Jefferies
Is there any year in which that is achievable without the phase four concentrator?
Simon Bottoms
Executive Vice President, Technical Services
With the new strategy, No, it would be achievable, but we would have to really high grade and we'd have to incur substantial costs to do that. So we've been re-optimizing the whole life of mine plan on an NSR revenue basis. And so, no, we're not targeting to exceed that 500,000 tons at any point without the phase four production.
Fahad Tariq
Analyst, Jefferies
And then finally, on the phase four CAPEX, I know the detailed engineering is going to begin, but is there any way we should be thinking about what that CAPEX may look like? Just what the level would be, broadly speaking? Thanks.
Simon Bottoms
Executive Vice President, Technical Services
Yeah, so I mean, it's similar to some of the prior expansions, as we pointed out on the slides. There's a lot of synergies there. There's a lot of infrastructure already in place. So even when we use sort of a 15% escalation on the prior concentrate costings, you still end up in the region of sort of 400 to 450 million for the concentrator installation. plus then the subsequent upgrades to install the next effective Project 95 that we call Project 92 for additional recovery. But again, some of this we're going through, we haven't even locked in the ultimate capacity at this point. So there's still a lot of value engineering to be done and work through with that. But yeah. Yeah, I mean, I think if you take a 15% escalation on those prior costs, it gives you a reasonable number. Thank you.
Conference Operator
Operator
Thank you. The next question comes from Andrew Mikachuk with BMO Capital Markets. Please go ahead.
Andrew Mikitchook
Analyst, BMO Capital Markets
Yeah, all kinds of great questions have already been asked and equally answered by the team. Just wanted to come back to the smelter question. With the next year's 35-day shutdown, was that in line with expectations? Sooner, later, normal course of affairs? How should we expect to understand that?
Simon Bottoms
Executive Vice President, Technical Services
So we actually took the decision, Andrew, to bring that shutdown forward because we wanted to have it in the first half of the year whilst we weren't filling the concentrators. So it made complete sense to have it in the first half of the year. Originally, it was scheduled to be more towards the tail end of the year. So I think it's fair to say we brought that shut forward by between four and five months in terms of the schedule. And it's just linking it up with the mine sequencing.
Andrew Mikitchook
Analyst, BMO Capital Markets
And then 35 days is just normal state of affairs for a smelter of this scale and there's nothing surprising there from what you guys have seen?
Simon Bottoms
Executive Vice President, Technical Services
Yeah, it's just a plan shot with a number of upgrades. Steve, do you want to comment?
Steve Amos
Executive Vice President, Projects
It's totally normal. It's a rebrick. 35 days is normal. Yeah, Andrew, it's nothing untoward.
Andrew Mikitchook
Analyst, BMO Capital Markets
Thank you. I'll give the microphone on to the next person. Thank you.
Conference Operator
Operator
Thank you. We have further questions on the line. You may proceed.
Marna Cloete
President and Chief Executive Officer
Call me.
Tommy Horton
Vice President, Investor Relations and Corporate Development
Okay, wrapping up the phone lines, let's just run into a few from the message board. We've got a few minutes to go to the top of the hour, and I think that's probably a reasonable time to draw a line on the call. So this is question four, David. So given the change in production profile and cost profile of CapEx, Kamal Kukula most notably, but also CapEx products, Are there any concerns around funding and is there a sort of a target debt to equity split that you would aim to maintain on a go forward basis?
David van Heerden
Chief Financial Officer
Yeah, thanks, Tommy. On the Thank you very much. Thank you so much for joining us. is really on the doorstep. And so a good positive there. We are, and you would have seen, we are now receiving quite substantial cash generated from Kapushi. And obviously we hope for that to continue. So there's, depending on our exploration expenditure and at what level we sort of put, Thank you very much. It is something that we obviously constantly look at and manage. Just in terms of the debt level that we feel comfortable with, I mean, we have said we would like a one-times... Thank you very much. Pretty quickly over the near term. So there is room for us to take on additional debt if required, but it's not needed just yet with our quite comfortable cash balance.
Tommy Horton
Vice President, Investor Relations and Corporate Development
OK, look, we're almost time, but there's just one more question and sort of a follow up to that in terms of Platte Reef and what our internal expectations are in terms of contribution to earnings once phase two is ramped up.
David van Heerden
Chief Financial Officer
Yeah, that is obviously still, it is very, very metal price dependent, Tommy. But yeah, we definitely think that Black Reef will be a, from, already from 2028 onwards, will be a nice substantial contributor to our EBITDA and POSC to push it quite comfortably.
Tommy Horton
Vice President, Investor Relations and Corporate Development
Okay, thanks, David. I think we're at time. It's top of the hour. So I'm going to say this concludes Ivanhoe Minds' third quarter 2026 Financial Results Conference call. Thank you all for attending and attending all the way through and for your various questions. And we look forward to speaking with you again soon. Thank you very much.
Conference Operator
Operator
Ladies and gentlemen, this concludes your conference call for today. We thank you for participating and we ask that you please disconnect your lines.