TECK Teck Resources Limited
$63.72
Teck Resources Limited Q3 F2026 Earnings Call Transcript
AI Conference Call Analysis
Sign in or subscribe to read.Conference Call Operator
Operator
Ladies and gentlemen, thank you for standing by. Welcome to Tech's 3rd Quarter 2026 Earnings Release Conference Call. At this time, all participants are in listening-only mode. Later, we will conduct a question-and-answer session. To join the question queue, please press star then 1 on your touch-tone phone. Should anyone need assistance during the conference call, they may signal an operator by pressing star then 0 on their telephone. This conference call is being recorded on Thursday, October 29, 2026. I would now like to turn the conference over to Edwin Chidao, Vice President, Investor Relations, and Treasurer. Please go ahead.
Edwin Chidao
Vice President, Investor Relations and Treasurer
Thank you, operator. Good morning, everyone, and thank you for joining us for Tech's third quarter 2026 conference call. Today's call contains four looking statements. Actual results may vary due to various risks and uncertainty. and many more. This does not assume the obligation to update any forward-looking statements. Please refer to slide 2 for the assumptions underlying our forward-looking statements. We will reference non-GAAP measures throughout this presentation. Explanations and reconciliations are in our MG&A and the latest press release on our website. On today's call, Jonathan Price, our CEO, will provide highlights for the third quarter of 2026. Crystal Prystai, our CFO, will then wrap up with closing remarks and an opportunity for Q&A. Over to you, Jonathan.
Jonathan Price
Chief Executive Officer
Thanks, Edwin, and good morning, everyone. We've delivered another quarter of significant earnings growth and robust cash generation, underlying the strength of our business. In the third quarter of 2026, we increased production, demonstrated resilience in execution, and benefited from another record quarterly average copper price. We significantly increased our cash flow from operations to $1.6 billion and doubled our adjusted EBITDA for $2.3 billion compared to the same period last year. We continue to strengthen our balance sheet quarter by quarter driven by significant cash flows from operations. We've increased our net cash position by $655 million in the quarter and by $1.7 billion over the first nine months of the year. Our liquidity is almost $11 billion as of September 30th, including $6.7 billion of cash. Our focus remains on our key near-term priorities to drive shareholder value, and we are making continued progress against them. Our merger of equals with Anglo American, the former copper-focused global metals and minerals champion, continues to progress as planned, and integration planning is advancing. We continue to engage constructively with China's anti-trust regulators to obtain the final outstanding regulatory approval. Expected completion within 12 to 18 months of our September 2025 announcement remains unchanged. In parallel, we remain focused on disciplined execution, particularly on safe and reliable operational performance and delivery against our commitments. In the third quarter of 2026, our financial performance was strong, despite a challenging operating environment at several of our sites. Our teams dealt with a wide range of severe weather events across our COPPA business. Extreme weather conditions had calmed down a coil, with torrential rain and flooding and more than three times the area's historical annual average rainfall in a short period of time. Heavy rains, snow, and sustained high winds and QV operations in one of the driest regions in the world and Severe Drought Conditions and an extended wildfire season at Island Valley. Throughout these events, the safety of our people remained the priority. While simultaneously dealing with multiple severe weather events and the resulting impacts of mining conditions, we safely recovered our operations in the quarter. Across our copper business, we increased production, lowered unit costs and delivered strong margin growth, and our zinc business continued to contribute meaningful cash flow. We've lowered our 2026 annual cash unit cost guidance in both our copper and zinc segments, primarily as a result of strong by-product pricing year to date. We lowered the midpoint of our net cash unit cost guidance by 13 US cents per pound for copper and by 35 US cents per pound for zinc, which also reflects our strong operating discipline. Our 2026 annual production and capital expenditure guidance is unchanged. We continue to advance the work necessary to realise the full value of QB, which will ultimately come from stable and efficient operations and continuous improvement. QB's strong operating performance in the first half of the year continued in July, but heavy snowfall and high winds in August caused intermittent power outages, resulting in shutdowns of the concentrator, dewatering systems and other critical equipment. Thank you for joining us today. QB's resilience to severe weather events will continue to be enhanced through the remainder of 2026 and into 2027 as the mine matures and more mining phases are opened. QB's tailings management facility, or TNF, development work continues to progress and we commence construction of Rossbank 6 in the quarter, which I will cover in more detail in a later slide. The third quarter of 2026 was our fourth consecutive quarter with no TMF-related downtime in the concentrator, supporting improved attic utilization and operational consistency. We are advancing construction of the mine life extension at Highland Valley Copper, which will sustain operations at this important attic through to 2046, and support average annual copper production of approximately 132,000 tonnes. Construction is now more than 25% complete. At the same time, we're continuing to progress the Copper Grove project in our portfolio towards pension readiness to generate shareholder value and strengthen optionality for future development opportunities. And we are pleased that San Nicolas received its main environmental impact assessment permit in July. Overall, our third quarter 2026 results showcase the underlying strength of our business and demonstrate our strong foundation as we advance towards completion of our merger with Anglo American. I'll now provide an update on each of our key near-term priorities, starting with the merger with Anglo American on slide 5. The merger is progressing as planned towards completion. The parties are working collaboratively towards securing the remaining required regulatory approval, and we are continuing to engage constructively with SAMA in China and are responding to their information requests. Integration planning continues to advance, with teams focused on day one readiness, maintaining safe and reliable operations, and ensuring business continuity while preparing the combined company to realise the strategic and operational benefits of the transaction. Significant progress has been made, including establishing the future executive leadership team for Anglo Tech, defining the fundamentals of its operating model, and advancing integration plans. On July 30th, we announced Anglo Tech's future executive leadership team, which brings together a highly experienced and complementary set of leaders from both companies. The leadership who will be responsible for Anglo Tech's mining and production businesses across Brazil, Chile, Peru, North America and South Africa was also concerned. These appointments will take effect immediately upon completion of the merger. During the quarter, S&P and the TSX announced that certain foreign issuers with a strong Canadian presence will be eligible for full inclusion in Canadian indices. We expect AngloTech will be an important part of the Canadian investment landscape and, if confirmed, the ability to achieve full inclusion in Canadian indices is a significant milestone, enabled by having headquarters in Vancouver, an expected listing on the Toronto Stock Exchange, and significant operations and ongoing investment in Canada. Overall the transaction continues to progress as planned and steady execution against the merger roadmap supports the expected close within 12 to 18 months of our September 2025 announcement which remains unchanged. We expect completion of the merger to be approximately 11 trading days from fulfillment or waiver of the remaining applicable precedent conditions. So turning to our safe and reliable operational performance and starting with safety and sustainability on slide six. In the third quarter of 2026, our quarterly high potential incident frequency rate improved to 0.06, equivalent to our 2025 annual rate, which was tied for tech's best ever annual performance. The Highland Valley Mine Life Extension Project has a strong safety record, having achieved over 1.5 million hours worked without a high potential incident or lost time injury. I'm personally very proud and impressed that during the severe weather events our team responded quickly and safely with no high-risk incidents reported. Our teams not only kept people safe, maintained essential services and restored our operations as conditions allowed, they also assisted regional recovery efforts by providing equipment and operators to help clear roads and restore access in affected communities. I would like to take a moment to acknowledge that a fatality occurred on October 27th at Antamina in which Tech holds a non-controlling interest. We are deeply saddened by this event and offer our condolences to the family, friends and colleagues of the deceased. Tech is supporting the organisation and learnings from the investigation will be shared across our company and across the sector so we can learn together to improve the safety of our people. In Sustainability, we announced that Tech had been named to the Forbes World's Top Companies for Women 2026 list for the second time on October 7th. This list recognizes organizations that are highly rated by female employees and demonstrates a commitment to advancing women in the workplace. Slide 7 summarizes our operational results for the third quarter of 2026. Overall, we sustained our operating performance while dealing with severe weather events across our proper business. Compared with the same period last year, we grew our copper production by 11% to 116,000 tons, with increases at all operations except calm the hammer coil, which had an extended suspension of operations due to extreme weather. While Red Dog's zinc production declined by 13% to 107,000 tons due to lower grades, as expected in the mine plan, refined zinc production at shale operations increased 18% to 62,000 tons, and Tamina Zinc production was down 70% due to a lower ratio of copper zinc ore as expected in the mine plan and reflected in our annual 2026 guidance. Turning to costs, at the bottom of the slide, I'm noting continued strong cost performance in the quarter. In copper, net cash unit cost improved 15% from a year ago to $1.77 US per pound in the quarter. Year to date, our net cash unit costs are $1.72 US per pound. In Zinc, unit costs were 27 US cents per pound in the quarter, reflecting lower volumes at Red Dog as expected. We continue to benefit from strong by-product prices, and year-to-date we're at 30 US cents per pound. Higher by-product prices, together with strong operating discipline, have allowed us to lower our 2026 cost guidance for both copper and zinc. Copper net cash unit costs for 2026 are now expected to be between $1.80 and $2 US per pound. In zinc, we've reduced our guidance roughly in half, with net cash unit costs now expected to be between 30 and 40 US cents per pound. Crystal will take you through the details shortly. Overall, we've delivered copper growth and cost discipline in the face of a challenging operating environment in the third quarter, demonstrating the resilience of our operations. There are no changes to our copper or zinc production guidance for 2026, including for QB, despite the impact of severe weather in the third quarter. On October 24th, a strike commenced at Highland Valley. Contingency plans were in place and HPC continues to operate at a reduced capacity. The impact on production depends on the duration of the labour action and we do not expect any significant impact on construction timelines for the mine life extension project. Our focus is on maintaining safe and environmentally responsible operations while working towards a new collective agreement that is fair to employees and supports the long-term competitiveness of the operation. More broadly, the weather we experienced in the third quarter is a reminder of the very real impacts of climate change and of why building resilience into our operations matters. We continue to adjust our planning processes and operating assumptions to account for climate related risks and our plans consider a range of scenarios. So turning now to QB on slide 8. QB's operating performance has been strong excluding the impacts of the recent severe weather. QB's solid execution in the first half of the year continued through July with key operating metrics consistent with or ahead of those used in our guidance for this year. However, severe weather in August caused intermittent power outages and downtime of the concentrator and affected our dewatering systems and other critical equipment. Wet conditions continued into September, reducing mine productivity and limiting our access to high-grade ore. As a newer operation, QB is predominantly operating in a single phase of the mine per the mine plan, resulting in limited operational flexibility to respond to severe weather conditions. The weather impacts, along with a planned maintenance shutdown in September, are reflected in QB's third quarter operating results. Asset utilisation was 79%, throughput averaged 117,000 tonnes per day, and recoveries were just over 81%. On a year-to-date basis, QB's operating metrics remain consistent with those used in our 2026 Animal Production Guidance, which is unchanged. Completing of the final plan shutdown for the year in September supports continued operational performance for the remainder of the year, and worth it continuing on performance improvements for recovery. As the mine plan advances through the fourth quarter and into 2027, multiple mining phases will be opened, enhancing operational flexibility and authorising optionality, and resulting in improved reliability and resilience. So turning to the updates on QG's TMF on slide 9. As you can see in the photos, development work on the TMF continues to advance. The third quarter of 2026 marked our fourth consecutive quarter with no TMF-related downtime. Sand deposition has improved significantly from a year ago, and in July we achieved our highest monthly deposition rate. Construction of the secondary cyclone station is expected to further improve sand deposition performance and provide additional operational flexibility. As previously disclosed, we brought forward the material placement originally planned for 2027 into 2026 and commenced construction of Rock Bench 6 in Q3. This allows us to install the permanent TMS pipeline infrastructure which began in October. The updated scorecard on slide 10 summarizes our latest progress on QB's TMS. We expect to complete all of our near-term TMS development objectives by the first quarter of 2027. We are working hard to advance the three remaining major components. Commissioning of the Secondary Site 1 system is expected in the first quarter of 2027. Construction of Rockbench 6 and installation of the permanent CMS pipeline infrastructure are also expected to be completed in the third quarter of 2020. The photo on the right shows installation of the jacking header, which is part of the permanent pipeline infrastructure and will mechanically raise the tailings and sand pipelines once completed. Successful completion of the three remaining components of the TMS will support more efficient and optimised TMS performance and enable steady-state operations at QVC. Turning now to the mine life extension at Highland Valley on slide 11. Construction is progressing well and the project is now more than 25% complete. More importantly, construction of the project is proceeding safely with more than 1.5 million hours worked without a high potential incident or lost time injuries. Work is underway across the projects including tailings, power infrastructure, earthworks, pipelines and brownfield work. Towards the end of the third quarter we began a planned temporary shutdown of one grinding line to allow for upgrades to the processing plant and we expect that work to be completed in January 2027. Our project capital guidance is unchanged, $900 million to $1.2 billion for 2026 and $2.1 to $2.4 billion in total. We invested $230 million of project capital in the third quarter and $672 million year-to-date. In light of the mine plan, capitalized stripping activity for the project is expected to continue ramping up in the fourth quarter. So I'll now hand over to Crystal to take you through the financial results in more detail.
Crystal Prystai
Chief Financial Officer
Thanks, Jonathan. Good morning, everyone. Starting with an overview of our Q3 2026 financial performance on slide 13. Overall, we had strong financial performance in the quarter, reflecting increased production, disciplined execution, and record copper prices, which averaged $6.40 U.S. per pound. Compared to the same period last year, we doubled our adjusted EBITDA to $2.3 billion, driven by significantly higher copper instinct prices, higher by-product revenue, and lower smelter processing charges.
Conference Call Operator
Operator
Our adjusted EBITDA margin increased to 51%, up from 35% a year ago.
Crystal Prystai
Chief Financial Officer
We generated $1.6 billion of cash flow from operations, nearly two and a half times the $647 million we generated in Q3 2025. During the quarter, we recorded a pre-tax and permanent reversal of $888 million on trail operations. This reflects higher expectations for long-term commodity prices, stronger market fundamentals for strategic metals, and increased cash flow from our optimized speed strategy. Turning to the key drivers of our higher profitability in Q3 2026 on slide 14. Higher commodity prices, primarily copper and zinc, were the largest contributor, adding just over $1 billion to adjusted EBITDA compared with a year ago. Higher coproduct and byproduct pricing, mainly silver, added another $198 billion, and lower smelter processing charges added $50 billion. These gains were partly offset by lower zinc volumes at Antony, by $126 billion. Turning to our copper segment on slide 15. Despite severe weather, our copper business generated significant profit and delivered strong margin growth, demonstrating operational resilience. Gross profit before depreciation and amortization more than doubled to $1.6 billion with a margin of 65%. This was primarily driven by another record quarterly average 116,000 tons, which increases at QB, ACC, and Antimina. Higher production at Haddon Valley and Antimina reflects higher copper grades, in line with our mine plan. QB production of 47,000 tons was higher than the same period last year. However, it was lower than in Q2 2025, reflecting the severe weather impacts in the quarter and limited flexibility while we're predominantly mining in a single phase. Carmen de Andacoyo's operations were suspended for an extended period in Q3 due to extreme weather and returned to full operations by the end of September. Copper net cost unit costs improved 15% to $1.77 U.S. per piece reflecting strong cost performance, lower treatment charges, and higher by-product credits. Looking forward, we have lowered our 2026 copper net cost unit cost guidance Our annual copper production guidance is unchanged. We continue to expect TB to produce between 200,000 to 235,000 tons this year, despite the impact of severe weather in the third quarter. At Highland Valley, we expect 2026 production towards the high end of our guidance range of 115,000 to 135,000 tons, despite the strike. and Antonina, we continue to expect 2026 production to be within our guidance range of 95,000 to 105,000 tons. As a result of the extreme weather in Q3, we expect production at Carmen de Andacoyo to be at the low end of our 45,000 to 55,000 ton guidance range. Turning to our zinc segment now on slide 16. Our zinc business continues to generate significant value. Growth profit before depreciation and amortization increased 41% to $638 million with a margin of 31%. This was primarily driven by higher zinc prices and higher byproducts revenues. Red Dog's production declined by 13% to 107,000 tons to the lower grade, in line with the modifier, and Red Dog's sales were within our previously disclosed guidance range at 247,000 tons. Refined zinc production at Trail Operations increased 18% to 62,000 tons. Trail Operations' profitability improved significantly again this quarter, with gross profit before depreciation and amortization of $169 billion, A year ago, reflecting our optimized speed strategy and strong commodity prices. The zinc net pack unit costs increased by 59% to 27 cents US per pound, driven by lower volumes at Red Dog as expected. Higher byproduct revenues, especially from silver, partly offset the increase, and year-to-date unit costs continue to be below our previously disclosed guidance range. As a result of strong cost performance and higher byproduct pricing, we have improved our 2026 net cash unit cost guidance. Total cash unit costs were lowered to between 70 to 80 cents U.S. per pound, down from 80 to 90 cents U.S., and net cash unit costs were lowered to between 30 and 40 cents U.S. per pound, down from 65 to 75 cents U.S. Looking forward, we expect Red Dog shipping season to be completed by early November and Red Dog sales to be between 65,000 and 75,000 tons in Q4 of 2026, reflecting the normal seasonality of sales. Our base production guidance is unchanged. Based on strong near-to-date performance at Red Dog, we expect our 2026 sinking concentrate production to be at the high end of our guidance of 410,000 to 460,000 tons. We also expect our 2026 refined bank production at Shrail to be at the high end of our guidance of 190,000 to 230,000 tons. Slide 17 shows the substantial expansion in our EBITDA margins this quarter. We significantly improved our copper EBITDA margins compared to the same period last year, from 42% to 67%, primarily driven by record copper prices, higher production and sales volumes, and lower copper net cash unit costs. We also increased our zinc EBITDA margin from 28% to 30%, primarily driven by higher zinc prices, stronger byproducts revenues, and our continued focus on seed optimization at Frail.
Conference Call Operator
Operator
The ongoing improvements in our EBITDA margins demonstrate the underlying strengths of our business.
Crystal Prystai
Chief Financial Officer
Looking more closely now at our unit costs on slide 18. Year over year, our net cost unit costs were lower in copper and higher in zinc. The decline in copper unit costs was driven by strong cost discipline, with lower cash cost of sales. Lower snuff and processing charges were also a benefit. The contribution from byproducts remained strong, so lower year on year, as the benefit of higher byproduct prices was offset by lower byproduct volumes. Higher zinc net cash unit costs were driven by higher cash cost of sales, as a result of lower volumes at Red Dog, as expected in our buy plan. with a small offset from lower smelter processing charges. Higher diesel costs have negatively impacted our operating costs this year, particularly in our copper segments. And at the same time, byproduct revenues continue to provide a material benefit to our unit costs. As I noted on the last slide, based on our performance year to date, we have reduced our 2026 unit cost guidance for both our copper and zinc segments. We have provided sensitivities For every $10 per ounce change in the silver price, our annual copper net cash unit costs are expected to move $0.02 U.S. per pound. In zinc, our net track unit costs are most sensitive to silver. For every $10 US per ounce change in the silver price, our annual zinc net track unit costs are expected to move $0.05 US per pound. Our exposure to diesel prices is lower in our zinc segment, where every $10 US per barrel change in WPI is expected to move our annual net track unit costs by only $0.01 US per pound. Red Dog purchases diesel for the full year during each shipping season. Most of this year's supply was delivered in the third quarter and the operation has now started using it. That ego was purchased at higher prices than last year. We are maintaining our strong focus on top discipline and productivity. In today's inflationary environment, value creation isn't just about growing tons, it's about protecting margins and generating attractive returns. Turning to our balance sheet on slide 19, we've continued to strengthen our balance sheet while funding the Highland Valley Mine Life Extension Project This is driven by our strong cash flow from operations, which were $1.6 billion in the quarter. As a result, our net cash position increased by $655 million in the quarter and by $1.7 billion year-to-date to $1.9 billion. Our liquidity was $10.9 billion at the end of September, including $6.7 billion of cash and our undrawn $3 billion U.S. sustainability-linked revolving credit facility. We returned $61 million to shareholders in the quarter due to payment of our regular base quarterly dividend of $12.5 per share. We continue to maintain investment-grade credit ratings, and we continue to reduce debt through our scheduled semi-annual repayment under the QV project finance facility. The ongoing strength of our balance sheet provides a strong foundation as we advance towards the launch of Anglo Tech. I will now pass it back to Jonathan for closing remarks.
Jonathan Price
Chief Executive Officer
Thanks, Crystal. So I'll wrap up on slide 21. It's an exciting time at Tech. This is the final quarter of the year. Our focus is clear. Finish 2020 fixed strong and deliver on our commitments. Our priorities in the near term are unchanged. Disciplined execution, stable and reliable operations, and continuing to unlock the potential of our assets. This quarter's results demonstrate the quality of our business and the strong foundation we've built as we advance towards Anglo Tech. We'll be entering our next chapter from a position of strength, built on the foundation of a high-quality critical minerals portfolio with safe and productive operations and attractive short, medium and long-term copper growth optionality, backed by a very strong balance sheet. We are moving towards completion of the merger with Anglo American and progressing towards the creation of a new global critical minerals champion and top-size copper producer.
Edwin Chidao
Vice President, Investor Relations and Treasurer
So with that, over to you, operator, for questions.
Conference Call Operator
Operator
Thank you. To join the question queue, please press star then 1 on your touchtone telephone. You will hear a tone acknowledging your request. Be asked that you please limit yourself to one question and one follow-up. If you are using a speakerphone, please ensure you lift the handset before pressing any keys. If you wish to remove yourself from the question queue, you may press star then 2. The first question comes from Aris Lokadal with Scotiabank. Please go ahead.
Orest Wowkodaw
Analyst, Scotiabank
Hi, good morning. Jonathan, I'm wondering if you can give us a bit more color on the current status of the regulatory approval in China. And specifically, there have been some media reports not that long ago that China is looking for security of copper concentrate offtake. I'm just wondering if you can confirm that, and is that the only thing China is looking for?
Jonathan Price
Chief Executive Officer
Hi, Horace. Thank you for the question. As you'd expect, I can't at once say much about the nature of the discussions we're having with the regulator in China. I'd say that the process with SAMR is unfolding very much in the normal course. We continue to respond to information requests, and we continue to expect completion within 12 to 18 months from the The date of announcement and we're, of course, looking forward to receiving that approval so we can complete the merger with Anglo American. But unfortunately, I can't really say more than that about the nature of those discussions.
Orest Wowkodaw
Analyst, Scotiabank
Okay. Could you maybe then just comment in terms of, if you can't comment on the nature of just where the status is? Like I assume it's a back and forth process. in terms of request for information and your response. But could you characterize maybe where things were at in that process? Are we in the late stages or are we still in the midst of negotiations?
Jonathan Price
Chief Executive Officer
Yeah, again, unfortunately, I'm not going to sort of unpack the details of the process and the engagement other than to say that it's a constructive engagement. We continue to have confidence in receiving that approval within the timeline that we set out. It's 12 to 18 months from announcement. So, you know, on that basis, we're closer to the end than we are to the beginning. But aside from that, there's really no additional colors that I can provide.
Orest Wowkodaw
Analyst, Scotiabank
Okay. Thanks very much.
Conference Call Operator
Operator
The next question comes from Liam Fitzpatrick with Deutsche Bank. Please go ahead.
Liam Fitzpatrick / Ian (Chief Commercial Officer)
Analyst, Deutsche Bank / Chief Commercial Officer
Good morning, Jonathan and team. Two questions. Firstly, just on QB, it seems like it's the grade up list that's going to be key to hitting the productions. Range or guidance for next year. So what's the level of confidence in that grade up list and when will that start to come through? Is it the early part of 2027 or potentially later in the year? And then second question is on copper concentrate sales into next year. Can you give any colour in terms of the strategy, whether you're still looking to lock up the bulk of volumes under an annual benchmark, whatever that turns out to be, or whether you're shifting the book more towards shorter term or stock? and Scott Sales. Thank you.
Jonathan Price
Chief Executive Officer
Yeah, on the QV piece, Liam, as we've noted, we'll have significantly more optionality in the mine as we move through this quarter, but also into next year as we open up a second and third phase. In the mine, of course, we'll be able to access grades, but we expect Thank you very much. In terms of compensation sales, I mean, we'll continue very much in the normal course in terms of contracting with customers, but I'll just ask Ian, our Chief Commercial Officer, whether he has any further comments to make on broking mechanisms. Only to say thanks for the question, Liam.
Liam Fitzpatrick / Ian (Chief Commercial Officer)
Analyst, Deutsche Bank / Chief Commercial Officer
Of course, the existence and preservation of the copper benchmark is still a bit at question, and so we'll comment on where those negotiations might result with both other customers and other producers, but would say that we carefully balance our book between both existing long-term contracts and spot sales. That's gone well this year, and we don't see a change for
Edwin Chidao
Vice President, Investor Relations and Treasurer
Thank you. Thank you.
Conference Call Operator
Operator
The next question comes from with Jeffrey. Please go ahead.
Christopher LaFemina
Analyst, Jefferies
Hi. Thanks. Hey, guys. Congratulations on another good quarter. Maybe following up on what Lian asked about the guidance. So, you know, when you first laid out the guidance to QB this year, There's a lot of people in the market questioning whether you'd be able to hit the targets, and you're showing that you are comfortably hitting your targets. Even in a quarter when you have horrific weather, you're still producing at a level that's effectively within the guidance range. So it appears, with the benefit of hindsight, that the guidance was relatively conservative. And now you're at 2027 and 2028. In particular, 2028 overall copper guidance is for a pretty significant decline in production. Part of that is grade-related. I'm wondering if we should assume the same level of potential conservatism in that guidance as well, and is the risk of that leaning more to the upside? Thanks.
Jonathan Price
Chief Executive Officer
Thanks for the question, Chris. When we established that guidance, we, as you know, anchored it very much in observable performance at the operation, but we did also include, as we worked through the forward guidance years, improvements in that performance, which are built into those The 2028 year and the lower guidance there has always been a function of grade and a function of the mine plan. That's not materially different from as we see it today when we dive into that. Thank you very much. Thank you very much. The next question comes from Miles Alford with UBS. Please go ahead. Great, thank you.
Myles Allford
Analyst, UBS
Maybe just first on QB again, when is the next maintenance shutdown expected to take place? Is it Q1 or Q2 next year? Maybe on Red Dog as well, obviously we've got guidance out to 2028, 250,000 tons are continuing to fall. How long is the life of the existing operation and when do you need to approve the sustaining project to avoid a kind of
Jonathan Price
Chief Executive Officer
Thanks for those questions Miles. On the first one the next shutdown at QV is in the first quarter of next year so as mentioned we don't have one this quarter which is important for us. I think it was a very comprehensive shutdown in September that went very well in terms of the activities that were undertaken and it gives us important operational continuity through the back end of the year. In terms of Red Dog, generally we've seen an end to the current mine life there in around 2031. Of course, we continue to review that, see if there's additional reserves available to extend that life, but I think that's the best and many others. We're working very hard on understanding the potential for the mine life extension there. We have two world-class ore bodies within about 15 kilometers of the existing operations at Red Dog. Very good grades and very rich in some of the specialty metals that have been so important to our profitability at Trail. So we continue to evaluate that. We're in the PFS stage. We're working on opening up the portal there to get better access to those resources and sanction will be several years from now is probably the best way to put that at the moment. We have to complete pre-season get through feasibility study until we get to that decision. So it's a way out but it's something the projects and operations teams are working very hard on.
Myles Allford
Analyst, UBS
Because on QB, is there going to be two or three maintenance shuts in 2027? And then on Red Dog, a quick follow-up there as well, with the opening up of these new wall bodies, is it going to be like a three, four-year construction? So we're going to avoid a zero in 2032, we need to get there by 2027, 2028 in terms of the approvals?
Jonathan Price
Chief Executive Officer
Yeah, so on the first question, just in shutdowns, you know, we would expect to have three major shutdowns at QB next year. You'll recall that when we started up the operations, they were quarterly. We're sort of extending the time between shutdowns now. So that would be the expectation for next year. Of course, with Red Dog, we're working hard to try and avoid a production gap. at that mine. That's what we're driving towards. Of course, that would be the ideal outcome, and that will be a product of many things, including the existing mine plan and, of course, the progress of the project. So we'll be able to say more about that in due course.
Myles Allford
Analyst, UBS
Thank you.
Edwin Chidao
Vice President, Investor Relations and Treasurer
Thanks, Mo.
Conference Call Operator
Operator
The next question comes from Carlos de Alba with Morgan Stanley. Please go ahead.
Carlos de Alba
Analyst, Morgan Stanley
Yeah, thank you. Good morning, everyone. Just maybe on the SYNC side, any comments on what the expectations you have for SYNC TCSEs next year, just given what we have seen recently in China and also globally, I guess? And then, Jonathan, if you can provide any more color on the CGF investment trail, I think it was presented as equity-like, If you have any more details, if you could be equity or what does it mean equity-like? Thank you.
Jonathan Price
Chief Executive Officer
Carlos, thank you very much. I will hand over to Ian for the Vic CCRP or PC conversation.
Liam Fitzpatrick / Ian (Chief Commercial Officer)
Analyst, Deutsche Bank / Chief Commercial Officer
And thank you Carlos for that question. I think really, you know, there are a few things that have happened there coming out of LME and we think that zinc is a positive story. Certainly it performed very, very strongly in 2026. We saw pricing peak at about $4,000 a ton in 2003. And in fact, zinc was LME's best performing metal for the year. But rightly as you point out, that supply story is starting to get more attention. I think what we're seeing is something that has growing similarities to proper. So highly negative treatment charges, and we are expecting treatment charges to continue in the directions seen in the spot market in 2027, which answers your question. Certainly there's not enough concentrate to meet smelter needs, and you're seeing Chinese smelters pulling hard on concentrate imports whenever there's material available. And as well, the trading houses are starting to come into it. and so really I think that challenge is driven by maintaining supply in existing mines and you can see an example of that with Antimeda based on the existing mine plant Lawrence in production for the year. So, on the whole, in the zinc market, mines are depleting faster than new ones are being added, and you're also not seeing the elastic supply that would come from smaller Chinese operations coming into the market. And China, similarly, has been challenged in terms of air imports, particularly for obvious reasons, both in Iran and with reference to Russia. So essentially this applies about the same as we've seen a decade ago and we're also seeing some demand implications on the Finnish side particularly in North America for 2027. So overall I think that's a good success story and you know the pieces on zinc in terms of fundamentals this is an asset that of course or a product that's consumed in its use and as you start to see infrastructure spend flow through as it has in the world and in the era of product change. I think that in a hotter weather world, the world needs more drinks. So we're looking forward to the future of that commodity.
Jonathan Price
Chief Executive Officer
And just to move on to your question about the CGF funding, Carlos, as you know, that's been very much centred around germanium, antimony and gallium and increases of production for each of those metals at trail. We continue to be working very constructively with the Canadian government on that and with the Canada Growth Fund We haven't finalized those discussions yet. Of course, we'll announce them when we do. They are very interested in supporting the expansion of that capacity, capacity which we know is for small markets and comes with some risk. So we're working with them on a nature of funding that will reflect both the opportunity and the risk associated with those investments. But nothing more to communicate at this stage.
Carlos de Alba
Analyst, Morgan Stanley
Thanks, Ian and Jonathan. If I may, just a follow-up on QB. How is October ramping up after the production in September? And in particular, I think that was the only operation where you didn't highlight, if you expect to be at the low end or the high end of the production, on-chain production range. So, any comment there? Thank you.
Jonathan Price
Chief Executive Officer
The operation is recovering well from the challenges we had through August and September. And as I said, we hope to finish the year strong here and get that back to a steady state and full race. But yes, things have improved significantly as we've worked through the last couple of months.
Edwin Chidao
Vice President, Investor Relations and Treasurer
Thank you.
Conference Call Operator
Operator
The next question comes from Craig Hutchinson with TDCon. Please go ahead.
Craig Hutchison
Analyst, TD Cowen
Good morning, guys. Maybe just a follow-up from the last question. You highlighted weather issues in Q3. Have you had any weather-related issues that either QB or Andy Coyle kind of creep into Q4 at this point, or is it a pretty steady state?
Jonathan Price
Chief Executive Officer
No, it's been a pretty steady state, Craig. The weather in Chile generally has been quite up and down, including through the month of October, but nothing that's had a direct impact on our operations.
Craig Hutchison
Analyst, TD Cowen
Okay, great. And then just on Highland Valley, the work that you're doing at the mill, the mill upgrades, the upgraded flotation circuit, what's the timing around that completion? And once it's done, what are you guys hoping to achieve from maybe a throughput and a recovery perspective? Thanks.
Jonathan Price
Chief Executive Officer
Yeah thanks for that. So that is an AG to SAG conversion essentially which will allow us to process harder material more effectively and the timeline for that is Q1. And of course that's you know it's complicated when you're doing these things inside a constrained operating environment but that work is going well. That conversion is well underway right now and as I said we plan to have that finished in the first quarter.
Craig Hutchison
Analyst, TD Cowen
Okay, so the plan would be just to sort of maintain the study-states we put, considering that we need to do them in higher order?
Jonathan Price
Chief Executive Officer
That's exactly right, yes.
Craig Hutchison
Analyst, TD Cowen
Okay. All right, thank you.
Edwin Chidao
Vice President, Investor Relations and Treasurer
Thank you, Greg.
Conference Call Operator
Operator
Thank you. We are out of time for further questions. I will now hand the call back over to Jonathan Price for closing remarks. Please go ahead.
Jonathan Price
Chief Executive Officer
Thank you very much. That wraps up our third quarter of 2026 conference call. As always, please feel free to reach out to Edwin and the IR team with any further questions. So thank you again for joining us and enjoy the rest of your day.
Conference Call Operator
Operator
This concludes today's conference call. You may disconnect your lines. Thank you for participating and have a pleasant day.